Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Northwestern Pacific Railroad

The Northwestern Pacific Railroad is a 271-mile (436 km) mainline railroad from the former ferry connections in Sausalito, California north to Eureka, with a connection to the national railroad system at Schellville. The railroad has gone through a complex history of different ownership and operators but has maintained a generic name of reference as the Northwestern Pacific Railroad, despite no longer being officially named that.

Northwestern Pacific Railroad
NWP #1922 running freight near Petaluma, California; October 21, 2011
Overview
StatusOperational (partial)
OwnerSonoma-Marin Area Rail Transit
Termini
  • Schellville
  • Samoa
WebsiteSMART Freight
Service
SystemNWP
Operator(s)NWPco
Sonoma–Marin Area Rail Transit
Depot(s)Freight: Schellville
Passenger: Mark West
History
Opened1907 (1907)
1989North Coast Rail Authority established
2011Service begins under NWPRA
Technical
Line length271 mi (436 km)
62 mi (100 km) (operational)
Characterfreight and commuter railroad
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Map

Main line
000.0
Closed section
000.0
462.6
461.1
455.8
Mad River Slough
449.8
447.4
444.6
Bracut
441.8
438.8
Freshwater Slough
438.0
436.4
430.4
Elk River
426.3
424.0
418.9
Salmon Creek
416.8
Tunnel 40
415.4
414.9
Swauger Creek &
Eel River Drive
411.7
408.4
407.6
405.7
Strong's Creek
405.0
402.1
400.6
396.2
393.0
Nanning Creek
391.7
391.6
391.5
Wildwood Avenue
390.8
387.9
385.6
384.2
Stitz Creek
376.8
Tunnel 39
376.3
Panther Creek
375.7
Shively Creek
374.8
371.8
Tunnel 38
369.0
Larabee Creek
368.5
365.1
Weber Creek
361.8
361.5
359.8
Dyerville Loop Road
356.2
Tunnel 37
350.2
Sonoma Creek
347.9
Tunnel 36
346.6
Tunnel 35
345.0
Tunnel 34
342.0
336.6
Brock Creek
328.4
321.8
Tunnel 31
320.5
Fort Seward Creek
317.1
Tunnel 30
316.2
315.4
Zenia Road
312.2
303.3
Tunnel 29
302.3
301.8
Kekawaka Creek
301.5
Tunnel 28
300.5
Queatchumpah Creek
294.9
294.0
Tunnel 27
293.3
293.0
282.8
Tunnel 24
277.8
Bell Springs Creek
276.7
274.8
Tunnel 23
274.4
Blue Rock Creek
269.8
268.5
Tunnel 22
266.8
Shell Rock Creek
263.4
Tunnel 21
262.6
262.3
Tunnel 20
256.2
Woodman Creek
256.1
Tunnel 18
255.6
252.8
Tunnel 17
249.6
Berger Creek
249.0
Tunnel 16
248.2
243.6
Tunnel 15
239.3
Tunnel 14
237.2
234.8
233.5
233.3
231.6
231.4
Tunnel 13
225.8
225.1
223.6
222.8
221.8
Tunnel 12
220.6
218.9
218.2
217.4
214.9
214.7
Tunnel 11
210.7
207.8
Little Lake
205.0
Willits California Western Railroad
Closed section
200.5
194.9
191.9
180.2
Laughlin
177.5
177.2
174.6
174.6
173.8
169.0
167.4
Ackerman Creek
167.1
Presswood
166.1
164.2
160.5
158.4
Robinson Creek
142.0
141.4
Feliz Creek
139.6
133.6
Tunnel 9
132.2
Tunnel 8 Squaw Rock
128.4
Commiskey Creek
124.4
Tunnel 7
122.6
Tunnel 6
121.0
118.8
Tunnel 5
reroute c. 1990s
Cloverdale (NWP)
118.1
Cloverdale Depot
(planned)
111.9
105.0
103.1
96.8
90.6
Healdsburg
(planned)
90.0
89.3
88.3
88.0
85.8
82.4
Windsor
(planned)
79.3
Sonoma County Airport Charles M. Schulz–Sonoma County Airport
SMART
Rail Operations Center
77.0
75.4
Santa Rosa North
67.9
Santa Rosa
67.5
67.3
P&SR Interurban
Sebastopol Branch
62.9
Todd Road
59.7
Rohnert Park
55.6
Cotati
47.4
Petaluma–North
(planned)
45.7
45.4
44.5
44.0
43.4
Petaluma
41.9
41.3
31.9
Novato San Marin
26.3
Novato
24.2
23.1
22.9
22.0
18.1
17.9
3.6
0

Currently, only a 62-mile (100 km) stretch of mainline from Larkspur to the Sonoma County Airport in Windsor and east to Schellville on the “south end” is operated by Sonoma–Marin Area Rail Transit (SMART), which operates both commuter and freight trains with plans for future extension north to Cloverdale. The “north end” from Willits to Eureka (which includes connections to the California Western Railroad) is currently out of service, but saved by 2018 legislation to be converted into the Great Redwood Trail.[1][2]

Vegetation encroaches on Swauger Creek trestle near Loleta.

History

edit

In the late 1800s both the Southern Pacific Railroad (“SP”) and the Atchison, Topeka and Santa Fe Railway (“AT&SF”) had great interests in building lines north from San Francisco to Humboldt County to transport lumber south. The Southern Pacific Railroad controlled the southern end of the line from Willits south to Marin and Schellville, while the AT&SF controlled line south from Eureka through Humboldt County. Both railroads planned to build a line north, the AT&SF starting with a boat connection in present-day Larkspur, California, and the Southern Pacific, starting at its interchange in American Canyon, north through Napa, Sonoma, Mendocino and Humboldt counties to finally terminate in Eureka. As plans went forward it became clear that only one railroad would be profitable serving Mendocino and Humboldt Counties, so the Southern Pacific and Santa Fe entered into a joint agreement, and in 1906 merged 42 railroad companies between Marin and Humboldt Bay to create one railroad line stretching from Sausalito to Eureka.

Prior to completing the line to Eureka, operations over the southern portion of the Northwestern Pacific included daily freight trains #112 and #113 between Willits and Santa Rosa, train #133 between Santa Rosa and Tiburon, trains #153 and #154 between Petaluma and the Guerneville branch to Duncans Mills, train #102 between Glen Ellen and Tiburon, train #109 between Tiburon and Sausalito, train #145 over the narrow gauge between Occidental and San Anselmo, train #202 between Willits and Sherwood, and train #251 operating over the logging branches out of Sherwood. Passenger trains #131 and #132 ran between Sausalito and Willits, trains #21 and #22 between Sausalito and Ukiah, train #23 between Sausalito and Healdsburg, trains #17 and #20 between Sausalito and the Guerneville branch to Duncans Mills, trains #9, #10, and #14 between Sausalito and Glen Ellen, trains #6 and #7 between Sausalito and San Quentin, train #4 between Tiburon and San Rafael, train #92 over the narrow gauge between Sausalito and Cazadero, train #84 over the narrow gauge between Sausalito and Point Reyes, and #101, a mixed freight and passenger train operated on the Sebastopol. Sunday and holiday passenger trains often required two locomotives and sometimes two or more sections. Independence day traffic required borrowing 25 or 30 Southern Pacific coaches.[3]

Completion of the line between Willits and Eureka was disrupted by the 1906 San Francisco earthquake; plans and right-of-way documents were destroyed in the subsequent fire. Engines 8, 12, 19, 104, 153 and 154 were shipped to Eureka by boat in 1911.[3] After a time-expedient "punt" of the route through the unstable Eel River Canyon, construction was finally completed in October 1914 when a "golden spike" ceremony and celebration was held to mark the accomplishment.

 
The depot at Asti

The railroad used ferries of San Francisco Bay for freight transfer until connected to the national rail network at Napa Junction by the Santa Rosa and Carquinez Railroad in 1888. The Santa Rosa and Carquinez remained part of SP independent of the NWP with a primary freight interchange at Schellville. SP's Santa Rosa branch continued from Schellville through Sonoma to a separate terminal yard on North Street in Santa Rosa. Freight interchange was predominantly through Ignacio, but there was a second connection to the SP in Santa Rosa until the line through the Valley of the Moon was abandoned in 1935.[4]

The railroad service became popular; an early daily NWP timetable shows 10 passenger trains each way, plus dozens of freights. The rail line soon replaced steam schooners as the main means of getting lumber from Humboldt County to market. Rail service to inland areas facilitated local development of the lumber industry.

In 1929 the AT&SF sold its half-interest to the Southern Pacific, making the NWP a full SP subsidiary.

The SP era

edit
Northwestern Pacific Railroad
 
Train at Santa Rosa, California in 1911
Overview
HeadquartersSchellville, California - Operational
Palo Alto, California - Administrative
Reporting markNWP
LocaleCalifornia's North Coast from Marin County to Eureka
Dates of operation1907 (1907)–1998 (1998)
SuccessorSouthern Pacific Transportation Company
Eureka Southern Railroad
Technical
Track gauge4 ft 8+12 in (1,435 mm) standard gauge
Previous gauge80 miles (130 km) of system originally 3 ft (914 mm)
Length271 miles (436 km)
Revenue freight traffic, in millions of net ton-miles (P&SR not incl)
Year Traffic
1925 150
1944 348
1960 604
1970 421
Source: ICC annual reports

Passenger service boomed until the 1930s, when improved roads and highways made traveling and shipping by motor vehicle more accessible. By 1935 freight and passenger service diminished because of the Great Depression. With the onset of World War II, freight shipments rose while passenger service remained constant. Freight service on the NWP increased in the 1950s owing to an increase in lumber demand due to the post-war housing boom.

Branch lines were dismantled during the 1930s. The Sebastopol branch became redundant following purchase of the Petaluma and Santa Rosa Railroad in 1932, and California State Route 12 adopted the former alignment between Leddy and Sebastopol. The Trinidad extension reverted to a logging line after NWP service ended in 1933. Sonoma County's River Road adopted the former alignment of the Guerneville branch from Fulton to Duncans Mills after rails were removed in 1935.[5]

Diesels were being used on all trains by 1953, with the exception of ten-wheelers number 181 and 183 pulling passenger trains numbered 3 and 4 between San Rafael and Eureka with number 182 on standby. The #3/#4 trains offered sleeping cars, a cafe-lounge in addition to coach cars. Passengers from San Francisco would take Greyhound Buses from the San Francisco Ferry Building at the base of Market Street to San Rafael.[6] NWP locomotives 112, 140, 141, 143, and 178 plus SP numbers 2345, 2356, 2564, 2582, and 2810 were stored at Tiburon for emergency use;[7] but steam power had disappeared by 1955. On November 10, 1958, all mainline passenger service was discontinued south of Willits.[8][9] The only remaining service was a tri-weekly Willits-Eureka round trip, operated by a single Budd Rail Diesel Car, which ran until April 30, 1971.[10] When Amtrak took over intercity passenger rail service on May 1, 1971, it did not continue service on the NWP.

1964 flood damage

edit

The catastrophic Christmas flood of 1964 destroyed 100 miles (160 km) of the railroad in Northern California, including three bridges over the Eel River, and permanently changed the topography of the area. The line was closed for 177 days while 850 men rebuilt the railroad through the Eel River canyon. The line was reopened on 16 June 1965.[11] In the years following the 1964 flood, the rail line was less reliable due to increased landsliding in the Eel River Canyon; but freight traffic remained high until the 1970s, as improvements to US Highway 101 cut hauling times, making trucking competitive with the rail line. An example of a 1970s work day on the NWP might look something like the following: During the final decade of Southern Pacific operation, carloads of lumber left Eureka each morning pulled by six EMD SD9 locomotives called "Cadillacs" by their crews. The train might pick up a refrigerator car of butter from Fernbridge and more lumber cars from Fortuna and Scotia before making a meal stop for its crew at the Fort Seward depot. More lumber cars might be added at Alderpoint during the long, gentle climb up the Eel River canyon. A second crew took over at Willits, where more cars from the California Western typically swelled the train to approximately one hundred cars. Five miles (8 km) of 2.25 percent grade from Willits to Ridge originally required helpers, but six "Cadillacs" typically moved the train from Willits to Ridge in two sections during later years. The remaining trip down the Russian River to Schellville included a meal stop for the crew at Geyserville.[12]

1978 tunnel fire

edit

Many Humboldt County mills began shipping lumber in trucks when a fire caused collapse of the Island Mountain tunnel, or tunnel 27, closing the line north of Willits on 6 September 1978, and only half of that traffic returned to the rails when the line reopened on 10 December 1979.[12] Remaining traffic revenues were insufficient for track maintenance through the Eel River Canyon, at that time the most expensive stretch of rail line in the United States.[10] In September 1983, the SP announced that it was shutting down the maintenance-intensive NWP line north of Willits. This led to a contentious court battle since the SP did not properly notify the Interstate Commerce Commission of their intent to abandon the line. The line was ordered reopened by the U.S. Circuit Court in March 1984.

Sales and shortline development

edit

From the early 1970s into the 1980s the SP began substantially cutting back non-core routes. In 1971, the line from Sausalito, once a major terminal on the line, was abandoned and converted into a walking path connecting to similar trails throughout Marin built upon the former interurban lines.

In 1984, the SP sold the north end from Willits to Eureka to Bryan Whipple, who ran it as the Eureka Southern Railroad under the reporting marks EUKA. The Eureka Southern operated freight trains and revamped tourist train service until bankrupted by storm damage in the Eel River Canyon, selling the railroad and most equipment by 1992.[13][14]

In 1984 and 1989, the former Petaluma and Santa Rosa Railroad line from Santa Rosa to Sebastopol was acquired by the Sonoma County parks department, and converted into the Joe Rodota Trail for walking and biking.

North Coast Railroad Authority (1989-2022)

edit
 
Derailed boxcars remain[when?] adjacent to Outlet Creek at milepost 152 near Longvale.

The California Legislature formed the North Coast Railroad Authority (NCRA) in 1989 to save the NWP from total abandonment. NCRA purchased the Eureka Southern in 1992 and leased the line to the newly formed North Coast Railroad[15] In late 1996, severe flooding of the Eel River led to widespread landslide damage and destruction of roadbed which remained unrepaired and halted most service. A lack of capital along with previous customers now finding the railroad expensive and unreliable after switching to truck traffic made repairs difficult to finance and complete. The Federal Railroad Administration (FRA) prohibited any train operation north of Willits in 1998.[16] This order was amended in 1999 to allow the connecting California Western Railroad to resume operation to Willits Depot and turn trains on the wye at Willits Yard after agreeing to assist in the maintenance of the same.[17]

Beginning in the late 1990s, the Golden Gate Bridge, Highway and Transportation District began purchasing sections of the NWP's south end from the Southern Pacific to save for a potential commuter train route thanks to growing suburbs in Marin and Sonoma counties. The SP required the California Northern Railroad (CFNR) to take over freight operations on the NWP in 1993 as a part of their long-term lease agreements for their main stretch of trackage in the Napa, Fairfield, and Woodland areas. The CFNR generally operated one train from Willits to Hopland, where freight cars were transferred to a second train from Hopland to Schellville.[18] The track from Lombard to Healdsburg was owned by the precursor to SMART, and the CFNR had trackage rights granted from Schellville to Willits where interchange occurred with the North Coast Railroad and the California Western Railroad.[19]

When the CFNR lease of the NWP was terminated, the NCRA via a contractor took over operations using EMD GP9 and SD9 locomotives painted in the SP "Black Widow" colors running both freight service and occasional passenger excursion service from 1996 to 1998. The line was plagued by a series of harsh El Nino storms from 1997 to 1998 causing significant washouts and bridge instability on top of already deferred infrastructure maintenance and mismanagement. The six EMD locomotives, defaulted on their lease, were returned to their lessor Omni-Trax in early 1998 and replaced by SP SD9s leased from Diesel Motive Company (reporting mark BUGX) and former North Coast Railroad GP9s owned by the NCRA. Maintenance and repair orders by the Federal Railroad Administration that were not addressed ultimately led the FRA to shut down all operations over the entire length of the line on November 22, 1998 under Emergency Order 21, the first and only time it had ever done so until the 2023 shutdown of the Blackwell Northern Railroad.[20] The six EMD locomotives, defaulted on their lease, were returned to their lessor Omni-trax in 1998. Former SP SD9s, leased from Diesel Motive Company (reporting mark BUGX), and former North Coast Railroad GP9s, owned by the NCRA, were then pressed into short-lived service before additional washouts, mechanical failures, and low revenue again closed the line. By 2016, several movements including scrapping of former equipment in Eureka and returning of leased and privately stored equipment in Willits, Petaluma and Schellville had begun.

In January 2001, the NWP briefly resumed service between Schellville and Cotati using three leased locomotives with reporting mark "NWPY",[21] but service was discontinued in September 2001 because the operator lacked capital to continue operations. Except for the brief SMART hy-rail inspection trip and few speeder tours, the line lay dormant and out of service until 2007.

SMART and NWPco (2002–2024)

edit

By 2002, the GGBHTD has purchased most of the “South End” and formed the “SMART District” to oversee funding and potential future operations. In November 2006, Measure R was passed with a combined 65.3% “yes” vote in the two-county District but ultimately failed to meet the “2/3 supermajority.” In 2008, Measure Q passed providing funding for the construction of a commuter railroad through a quarter-cent sales tax. Though it was thought that this would provide enough initial funding, it did not. Consequently, the railroad would be constructed in stages over several years.

In 2009, SMART began initial electrical work on the line which was paralleled by reballasting and replacement of bad ties between Schellville and Windsor. In 2006, NCRA awarded a 99-year lease to NWPco, who would operate trains under reporting mark "NWP." In June 2011, the line was reopened for freight traffic and operations began between Schellville and Windsor, California, 62 miles. In July 2011 the first freight train delivered grain to Petaluma. Trains on the NWP run from the Lombard interchange with the California Northern Railroad, up to Windsor. Service consists[when?] of about two to three trips north to Petaluma weekly over the line, generally at night to avoid conflict with SMART's daytime-only passenger schedule, and two to three trips to the interchange at Lombard, generally during the day. The railroad predominantly carries grain for dairy and poultry farms in Sonoma County, but also has provided shipment of lumber products out of Windsor, Petaluma and Schellville, a large piece of equipment for Pacific Gas and Electric, has provided construction trains for SMART, bulk car storage, and currently hosts the Golden Gate Railroad Museum storage lot on a former lumbar yard spur in Schellville.

Regular passenger trains operated by SMART began in late Spring 2017 between Sonoma County Airport and San Rafael, later opening the Larkspur station with a connection to the Larkspur ferry landing. Plans still remain to extend the line north to the city of Cloverdale. While SMART will eventually extend commuter service to at least Cloverdale, NCRA and NWPco had plans to open the line to the Skunk Train connection and major yard facility in Willits, but no timeline was established or attempts made before NCRA was dissolved and as of 2024 there is little interest by SMART. Both agencies' plans were dependent on state and federal grants, and the success of the SMART train.[22] Although tourist companies along with local historical groups have expressed interest in possibly opening an excursion and dinner train that would traverse Humboldt and Arcata bays, there are no plans to reopen the Eel River Canyon segment.[23]

Disbanding of the NCRA, and SMART (2019 - present)

edit

Financial disarray and legal troubles beginning before the turn of the millennium [24] caused the NCRA to fall out of favor with local and state officials as well as the public.[25] In 2020, the SB 69 Great Redwood Trail Act was passed, tasked with dissolving the NCRA and the creation of a 320-mile public trail.[26] California's 2018 Great Redwood Trail Act includes detailed plans for investigating and resolving the Authority's debts, dissolving the NCRA, and converting its rights-of-way to rail-trail.[2][27]

In the bill, the Sonoma–Marin Area Rail Transit (SMART) acquired 21 miles (34 km) from Healdsburg north to the Mendocino-Sonoma County border in September 2020, and in February 2022, took over NWP freight operations, having been approved by the US Surface Transportation Board.[28][29] Today, freight service is operated by SMART. Freight services continue to use locomotives previously both owned and leased by NWPco, now by SMART, in various “Northwestern Pacific” themed schemes.

Predecessor lines

edit
 
Valuation map of the Northwestern Pacific railroad

Route

edit
 
Northwestern Pacific Railroad Route in 1931

NWP mileposts conform to Southern Pacific Railroad convention of distance from San Francisco:[34]

Narrow-gauge line

edit
 
Mesa Grande station was served by dual-gauge track.

The NWP 3 ft (914 mm) narrow-gauge line was built as the North Pacific Coast Railroad in 1873 from a San Francisco ferry connection at Sausalito to the Russian River at Monte Rio. Rails were extended downriver to Duncans Mills in 1876, and up Austin Creek to Cazadero in 1886. This narrow-gauge line became the Shore Division of the NWP formed by Santa Fe and Southern Pacific in 1907. Freight traffic was heavy as the lower Russian River valley was a major source of redwood lumber for rebuilding San Francisco after the 1906 San Francisco earthquake. The NWP narrow-gauge obtained additional freight cars from the South Pacific Coast Railroad (SPC) as the SPC was converted to standard gauge between 1907 and 1909. Ferries Lagunitas, Ukiah, and Sausalito carried narrow-gauge freight cars across San Francisco Bay from Sausalito to the dual-gauge San Francisco Belt Railroad.[35]

After the flooded Russian River destroyed the 4 ft 8+12 in (1,435 mm) standard gauge NWP Guerneville branch bridge at Bohemia on 19 March 1907, NWP rebuilt the bridge one-half mile downriver; and extended the Guerneville branch from Monte Rio to Duncans Mills as dual-gauge by 1909. Redwood lumber was then shipped out over the Guerneville branch. A freight transfer shed was built at San Anselmo so narrow-gauge tracks could be removed from the ferries in 1910; and more than half of the narrow-gauge freight cars were scrapped by 1912. A daily freight train operated from Occidental to San Anselmo in the morning and returned to Occidental in the afternoon. The train included a coach for Sonoma County students attending school in Tomales. A freight engine stationed at Duncans Mills was operated by the Guerneville branch freight crew as needed to bring infrequent freight down from Cazadero for transfer to the Guerneville branch until the line up Austin Creek to Cazadero was standard-gauged in 1926.[35]

Summer tourists from San Francisco still visited Russian River vacation spots via joint narrow-gauge/standard-gauge NWP "triangle" excursions until 1927 when automobile travel became more popular. Standard-gauging of the southern end of the line from San Francisco Bay to Point Reyes Station at the head of Tomales Bay was completed on 5 April 1920. Freight service between Point Reyes Station and Occidental was reduced to thrice weekly with freight transfer at Point Reyes Station. Lumber production from the lower Russian River valley was ended by a wildfire on 17 September 1923. After the standard-gauge line was extended to Cazadero, service north of Point Reyes was reduced to a daily (except Sunday) mixed train to Camp Meeker and return until the last narrow-gauge train ran on 29 March 1930; and the remaining narrow-gauge line between Monte Rio and Point Reyes Station was dismantled that autumn.[35] The route of the dual-gauge line from Fulton to Duncan Mills later became the popular River Road connecting all the towns from the coast to the central county.

Route

edit

Mileposts conform to Southern Pacific Railroad convention of distance from San Francisco.[36]

Locomotives

edit
Number Builder Type Date Works number Notes[65][66]
82 Baldwin Locomotive Works 4-4-0 1876 3842 ex-NPC/NS/NWP #11 scrapped 1911
83 Baldwin Locomotive Works 4-4-0 1875 3722 ex-NPC/NS/NWP #3 scrapped 1913[67]
84 NPC Sausalito Shop 4-4-0 1900 1 ex-NPC/NS/NWP #20; used in passenger service between Sausalito and Point Reyes;[68] retired 1920 scrapped 1924[69][70]
85 Baldwin Locomotive Works 4-4-0 1884 7249 ex-South Pacific Coast Railroad #14 wrecked[71][72]
86 Baldwin Locomotive Works 4-4-0 1884 7236 ex-South Pacific Coast Railroad #15 then NWP #19>#86 sold Duncan Mills Land & Lumber Company 1920 scrapped 1926[73]
87 Baldwin Locomotive Works 4-4-0 1880 4960 ex-South Pacific Coast Railroad #10 then NWP #10>#87 scrapped 1917[74][75]
90 Brooks Locomotive Works 4-4-0 1891 1886 ex-NPC/NS/NWP #15 operated last narrow gauge NWP train in 1930 scrapped 1935[76][77]
91 Brooks Locomotive Works 4-4-0 1894 2421 ex-NPC/NS/NWP #16 scrapped 1935[78][79]
92 Brooks Locomotive Works 4-4-0 1891 1885 ex-NPC/NS/NWP #14; used in passenger service between Sausalito and Cazadero;[68] retired 1926; scrapped 1935[80][70]
93 Baldwin Locomotive Works 4-4-0 1884 7249 1924 rebuild of wrecked #85 scrapped 1935
94 Baldwin Locomotive Works 4-6-0 1887 8486 ex-South Pacific Coast Railroad #20 then NWP #21>#144>#94 scrapped 1935[81][82]
95 Brooks Locomotive Works 4-6-0 1899 3418 ex-NPC/NS/NWP #18 then NWP #145>#95 retired 1929 scrapped 1935[83][84]
195 Baldwin Locomotive Works 2-6-0 1883 6611 ex-NPC/NS/NWP #13 scrapped 1912[85]
321 Baldwin Locomotive Works 2-8-0 1880 4974 ex-Denver and Rio Grande Railroad #44 then NS/NWP #40 scrapped 1912
322 Baldwin Locomotive Works 2-8-0 1885 7676 ex-Hancock and Calumet Railroad #2 then Duluth, South Shore and Atlantic Railroad #33 then NS/NWP #33 scrapped 1914[75]
323 Baldwin Locomotive Works 2-8-0 1885 7677 ex-Hancock and Calumet Railroad #3 then Duluth, South Shore and Atlantic Railroad #31 then NS/NWP #31 scrapped 1912[86]

See also

edit

Footnotes

edit
  1. ^ "Gov. Brown signs Great Redwood Trail bill". Times-Standard. September 30, 2018. Retrieved February 22, 2021.
  2. ^ a b Sims, Hank (January 8, 2019). "Marin Judge Orders the Remains of the North Coast Railroad Authority to Pay Humboldt Environmental Groups Nearly $2 Million". Lost Coast Outpost. Retrieved February 22, 2021.
  3. ^ a b Silverthorn, W.A. "Early Days on the NWP". The Western Railroader. 15 (152). Francis A. Guido: 4&5.
  4. ^ "Annadel SP Information Document Final". PDFSECRET. State of California. Retrieved January 29, 2019.
  5. ^ Stindt (1978), p. 57.
  6. ^ 'Official Guide of the Railways,' December 1954, p. 904
  7. ^ Silverthon (1953). "Northwestern Pacific down to Diesels and own Steam Power to Haul Trains". The Western Railroader. 16 (167). Francis A. Guido: supplement.
  8. ^ "Vintage Train--and Wine--Ride the Rails". Los Angeles Times. September 8, 1996.
  9. ^ "Train makes last run". San Francisco Examiner. November 11, 1958. p. 13. Retrieved September 12, 2023 – via Newspapers.com.  
  10. ^ a b Glionna, John M. (April 22, 2001). "Light at the End of the Tunnel for a Struggling Little Railroad". Los Angeles Times. Retrieved October 8, 2011.
  11. ^ Stindt (1985) p.9
  12. ^ a b Fox (1983), p. 7, 8, 35, 40 & 43.
  13. ^ "Eureka Southern Railroad Co., Inc.; Emergency Order Prohibiting Passenger Service". Fra.dot.gov. June 1990. Retrieved November 26, 2018.
  14. ^ "Eureka Southern Railroad Company, Inc.; Passenger Service Allowed Between Milepost 142.5 and Milepost 145.5, and between Milepost 216.6 and Milepost 284.1". Fra.dot.gov. October 1990. Retrieved November 26, 2018.
  15. ^ Fixler, Kevin (May 3, 2019). "Hiking from the Bay Area to Humboldt just got a step closer to reality". Santa Rosa Press Democrat. Retrieved May 4, 2019.
  16. ^ "Northwestern Pacific Railroad; Amendment to Prohibit the Transportationof Hazardous Materials between Willits, California and Ft. Seward, California". Fra.dot.gov. November 1998. Retrieved November 26, 2018.
  17. ^ "Northwestern Pacific Railroad; Notice of Partial Relief from Emergency Order No. 21". Fra.dot.gov. May 1999. Retrieved November 26, 2018.
  18. ^ Norberg, Bob (1995). "Run from Willits to Petaluma unchanged from 80 years ago". The Press Democrat (20 February 1995): B1.
  19. ^ North Coast Railroad Authority (December 12, 2009). "Public draft, environmental impact report, North Coast Railroad Authority, Russian River Division executive summary". Archived from the original on December 13, 2009. Retrieved December 12, 2009.
  20. ^ "Northwestern Pacific Railroad; Emergency Order to Prevent Operation of Trains on Northwestern Pacific Railroad's Trackage from Arcata, California, to Mile Post 63.4 between Schellville and Napa Junction, California". Fra.dot.gov. December 1998. Retrieved November 26, 2018.
  21. ^ "Northwestern Pacific Railroad; Notice of Partial Relief from Emergency Order No. 21". Fra.dot.gov. February 2001. Retrieved November 26, 2018.
  22. ^ Martin, Nicole and Sobelman, Donald (November 20, 2014) "Federal Preemption May Be The Key For Calif. Railroads" Barg Coffin Lewis & Trapp, LLP
  23. ^ Fritzsche, Ron (October 23, 2019). "My Word: Save the rails around Humboldt Bay!". Times-Standard. Retrieved October 23, 2019.
  24. ^ Glionna, John M.; Los Angeles Times (April 22, 2001) "Light at the End of the Tunnel for a Struggling Little Railroad"
  25. ^ Sims, Hank; Lost Coast Outpost (January 8, 2019) "Marin Judge Orders the Remains of the North Coast Railroad Authority to Pay Humboldt Environmental Groups Nearly $2 Million"
  26. ^ Times Standard (September 2018) " Gov. Brown signs Great Redwood Trail bill"
  27. ^ "Abandoned North Coast Rail Line Set To Become More Than 300 Miles Of Trail". KPIX 5. March 14, 2022. Retrieved June 11, 2022.
  28. ^ Houston, Will (December 4, 2020). "State approves SMART takeover of North Bay freight hauling". Marin Independent Journal. Retrieved February 22, 2021.
  29. ^ Rauch, James. Interview. By Kai Bachtiger. 22 February 2022.
  30. ^ Borden (1963), p. 9.
  31. ^ Borden (1963), p. 12.
  32. ^ Borden (1963), p. 10–15.
  33. ^ Codoni & Trimble (2006).
  34. ^ Gale, V.J. and Valles, R.C.(Roadmasters) (1978). (untitled maintenance-of-way charts). Southern Pacific Railroad.{{cite book}}: CS1 maint: multiple names: authors list (link)
  35. ^ a b c Stindt, Fred A. (1968). "Northwestern Pacific Narrow Gauge". The Western Railroader. 31 (346). Francis A. Guido: 3–16.
  36. ^ Stindt (1978), p. 88–89.
  37. ^ Stindt (1974), p. 8.
  38. ^ Dickinson (1974), p. 32–33, 45, 50, 69, 76, 99, 125 & 154.
  39. ^ Dickinson (1974), p. 78.
  40. ^ Dickinson (1974), p. 48, 79 & 153.
  41. ^ Dickinson (1974), p. 113.
  42. ^ Stindt (1974), p. 22.
  43. ^ Dickinson (1974), p. 62 & 113.
  44. ^ Dickinson (1974), p. 150.
  45. ^ Dickinson (1974), p. 34.
  46. ^ Dickinson (1974), p. 31.
  47. ^ a b Stindt (1974), p. 17.
  48. ^ Dickinson (1974), p. 147.
  49. ^ Dickinson (1974), p. 40 & 149.
  50. ^ Stindt (1974), p. 14.
  51. ^ Dickinson (1974), p. 5, 36 & 96.
  52. ^ Stindt (1974), p. 16 & 30–31.
  53. ^ Dickinson (1974), p. 40, 64, 93, 116 & 145.
  54. ^ Stindt (1974), p. 39.
  55. ^ Dickinson (1974), p. 66 & 146.
  56. ^ Stindt (1974), p. 1–4, 16, 53, 60 & 62–63.
  57. ^ Dickinson (1974), p. 114.
  58. ^ Stindt (1974), p. 26–27.
  59. ^ Dickinson (1974), p. 36 & 38.
  60. ^ Stindt (1974), p. 14–15, 65 & 69.
  61. ^ Dickinson (1974), p. 84–85, 88–89 & 118.
  62. ^ Stindt (1974), p. 10.
  63. ^ Dickinson (1974), p. 67, 70, 109 & 118.
  64. ^ Koch (1971), p. 422.
  65. ^ Stindt (1974), p. 78.
  66. ^ Dickinson (1974), p. 132–133.
  67. ^ Dickinson (1974), p. 134.
  68. ^ a b Silverthorn, W.A. (1952). "Early Days on the NWP". The Western Railroader. 15 (152). Francis A. Guido: 4&5.
  69. ^ Stindt (1974), p. 16.
  70. ^ a b Dickinson (1974), p. 129.
  71. ^ Stindt (1974), p. 34.
  72. ^ Dickinson (1974), p. 120.
  73. ^ Dickinson (1974), p. 123 & 135.
  74. ^ Stindt (1974), p. 25 & 33.
  75. ^ a b Dickinson (1974), p. 135.
  76. ^ Stindt (1974), p. 10, 16, 25, 35 & 39.
  77. ^ Dickinson (1974), p. 124.
  78. ^ Dickinson (1974), p. 6 & 135.
  79. ^ Stindt (1974), p. 9, 16, 18, 29 & 34.
  80. ^ Stindt (1974), p. 3, 16 & 29.
  81. ^ Dickinson (1974), p. 123.
  82. ^ Stindt (1974), p. 25, 29 & 35.
  83. ^ Stindt (1974), p. 3, 24, 32 & 35.
  84. ^ Dickinson (1974), p. 125, 129 & 136.
  85. ^ Dickinson (1974), p. 136.
  86. ^ Stindt (1974), p. 33.

[1]

References

edit

Further reading

edit
edit