Changchun–Baicheng railway: Difference between revisions
Appearance
Content deleted Content added
added Category:Railway lines opened in 1934 using HotCat |
m clean up |
||
Line 45: | Line 45: | ||
}} |
}} |
||
The '''Changchun–Baicheng railway''' (Simplified Chinese: '''长白铁路''') is a double-track electrified railway in [[China]]. The railway is {{convert|325.7|km|mi}} and has a design speed of {{convert|160|km/h|mph}}. |
The '''Changchun–Baicheng railway''' (Simplified Chinese: '''长白铁路''') is a double-track electrified railway in [[China]]. The railway is {{convert|325.7|km|mi}} and has a design speed of {{convert|160|km/h|mph}}. |
||
==History== |
==History== |
||
The line was built by the Japanese in 1934.<ref>{{Cite web|date=2017-10-08|title=长白乌铁路正式开通运营 白城等地迈入动车时代-吉林广播网|url=http://www.jlradio.cn/html/2/2017/8/8/177380.html|access-date=2020-10-31|archive-url=https://web.archive.org/web/20171008183025/http://www.jlradio.cn/html/2/2017/8/8/177380.html|archive-date=2017-10-08}}</ref> |
The line was built by the Japanese in 1934.<ref>{{Cite web|date=2017-10-08|title=长白乌铁路正式开通运营 白城等地迈入动车时代-吉林广播网|url=http://www.jlradio.cn/html/2/2017/8/8/177380.html|access-date=2020-10-31|archive-url=https://web.archive.org/web/20171008183025/http://www.jlradio.cn/html/2/2017/8/8/177380.html|archive-date=2017-10-08}}</ref> |
||
Starting in 2014, the railway underwent an upgrade which saw bridges and tunnels built to replace level crossings. The radius of corners was also increased and the line was double-tracked. The refurbished railway was opened in 2017. In 2019, the [[Fuxing (train)|Fuxing]] CR200J EMU was introduced on the line.<ref>{{Cite web|title="绿巨人"动车组首次在长白乌快速铁路投入运营-新华网|url=http://www.xinhuanet.com/local/2019-10/22/c_1125137155.htm|access-date=2020-10-31|website=www.xinhuanet.com}}</ref> |
Starting in 2014, the railway underwent an upgrade which saw bridges and tunnels built to replace level crossings. The radius of corners was also increased and the line was double-tracked. The refurbished railway was opened in 2017. In 2019, the [[Fuxing (train)|Fuxing]] CR200J EMU was introduced on the line.<ref>{{Cite web|title="绿巨人"动车组首次在长白乌快速铁路投入运营-新华网|url=http://www.xinhuanet.com/local/2019-10/22/c_1125137155.htm|access-date=2020-10-31|website=www.xinhuanet.com}}</ref> |
||
==Stations== |
==Stations== |
||
The line has the following passenger stations: |
The line has the following passenger stations: |
||
Line 65: | Line 67: | ||
*[[Daobao railway station|Daobao]] |
*[[Daobao railway station|Daobao]] |
||
*[[Baicheng railway station|Baicheng]] |
*[[Baicheng railway station|Baicheng]] |
||
==References== |
==References== |
||
<references /> |
<references /> |
||
{{DEFAULTSORT:Changchun-Baicheng railway}} |
|||
[[Category:Railway lines in China]] |
[[Category:Railway lines in China]] |
||
[[Category:Railway lines opened in 1934]] |
[[Category:Railway lines opened in 1934]] |
||
{{PRChina-rail-transport-stub}} |
{{PRChina-rail-transport-stub}} |
Revision as of 22:18, 3 August 2021
Changchun–Baicheng railway | |
---|---|
Overview | |
Status | Operational |
Termini | |
Stations | 14 |
Service | |
Type | Heavy rail |
History | |
Opened | 1934 |
Technical | |
Line length | 325.7 km (202 mi)[1] |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
Electrification | 50 Hz 25,000 V |
Operating speed | 160 km/h (99 mph) |
The Changchun–Baicheng railway (Simplified Chinese: 长白铁路) is a double-track electrified railway in China. The railway is 325.7 kilometres (202.4 mi) and has a design speed of 160 kilometres per hour (99 mph).
History
The line was built by the Japanese in 1934.[2]
Starting in 2014, the railway underwent an upgrade which saw bridges and tunnels built to replace level crossings. The radius of corners was also increased and the line was double-tracked. The refurbished railway was opened in 2017. In 2019, the Fuxing CR200J EMU was introduced on the line.[3]
Stations
The line has the following passenger stations:
- Changchun
- Kai'an
- Huaijia
- Nong'an
- Halahai
- Wangfu
- Songyuan
- Chaganhu
- Changshantun
- Da'an
- Liangjia
- Anguan
- Daobao
- Baicheng
References
- ^ "长白铁路扩能改造工程进展顺利-新华网". www.xinhuanet.com. Retrieved 2020-10-31.
- ^ "长白乌铁路正式开通运营 白城等地迈入动车时代-吉林广播网". 2017-10-08. Archived from the original on 2017-10-08. Retrieved 2020-10-31.
- ^ ""绿巨人"动车组首次在长白乌快速铁路投入运营-新华网". www.xinhuanet.com. Retrieved 2020-10-31.