Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
Jump to content

Changchun–Baicheng railway: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Citation bot (talk | contribs)
Alter: url, title. URLs might have been anonymized. Add: archive-date, archive-url. Removed parameters. | Use this bot. Report bugs. | Suggested by Headbomb | Pages linked from cached Wikipedia:WikiProject_Academic_Journals/Journals_cited_by_Wikipedia/Sandbox | via #UCB_webform_linked 11/142
Line 69: Line 69:


[[Category:Railway lines in China]]
[[Category:Railway lines in China]]
[[Category:Railway lines opened in 1934]]


{{PRChina-rail-transport-stub}}
{{PRChina-rail-transport-stub}}

Revision as of 22:57, 21 June 2021

Changchun–Baicheng railway
Overview
StatusOperational
Termini
Stations14
Service
TypeHeavy rail
History
Opened1934
Technical
Line length325.7 km (202 mi)[1]
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification50 Hz 25,000 V
Operating speed160 km/h (99 mph)

The Changchun–Baicheng railway (Simplified Chinese: 长白铁路) is a double-track electrified railway in China. The railway is 325.7 kilometres (202.4 mi) and has a design speed of 160 kilometres per hour (99 mph).

History

The line was built by the Japanese in 1934.[2]

Starting in 2014, the railway underwent an upgrade which saw bridges and tunnels built to replace level crossings. The radius of corners was also increased and the line was double-tracked. The refurbished railway was opened in 2017. In 2019, the Fuxing CR200J EMU was introduced on the line.[3]

Stations

The line has the following passenger stations:

References

  1. ^ "长白铁路扩能改造工程进展顺利-新华网". www.xinhuanet.com. Retrieved 2020-10-31.
  2. ^ "长白乌铁路正式开通运营 白城等地迈入动车时代-吉林广播网". 2017-10-08. Archived from the original on 2017-10-08. Retrieved 2020-10-31.
  3. ^ ""绿巨人"动车组首次在长白乌快速铁路投入运营-新华网". www.xinhuanet.com. Retrieved 2020-10-31.