U.S. Route 53
Route information | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
Length | 404 mi[1] (650 km) | |||||||||
Existed | 1926[citation needed]–present | |||||||||
Major junctions | ||||||||||
South end | US 14 / US 61 / WIS 16 at La Crosse, Wis. | |||||||||
| ||||||||||
North end | Highway 71 to Highway 11 at Fort Frances, ON | |||||||||
Location | ||||||||||
Country | United States | |||||||||
States | Wisconsin, Minnesota | |||||||||
Counties | WI: La Crosse, Trempealeau, Eau Claire, Chippewa, Barron, Washburn, Douglas MN: St. Louis, Koochiching | |||||||||
Highway system | ||||||||||
| ||||||||||
|
U.S. Route 53, or U.S. Highway 53 (U.S. 53), is a north–south U.S. highway that runs for 404 miles (650 km) from La Crosse, Wisconsin to International Falls, Minnesota. It is the primary north–south route in northwestern Wisconsin, serving as a vital link between I-94 at Eau Claire, Wisconsin and the Twin Ports of Superior, Wisconsin, and Duluth, Minnesota. The entire route from Eau Claire to the city limits of Superior is a four lane divided highway. The highway's northern terminus is at the Fort Frances–International Falls International Bridge in International Falls, Minnesota, at the Canada–US border. Its southern terminus is in La Crosse, Wisconsin, at U.S. Highway 14.
Route description
Wisconsin
U.S. Highway 53 begins at its southern terminus with a junction at U.S. 14, U.S. 61, and Wisconsin Highway 16 in downtown La Crosse. From there, U.S. 53 crosses Interstate 90 and becomes a freeway bypass of Onalaska and Holmen before proceeding north to Eau Claire as a two-lane roadway. The interchange with Interstate 94 at Eau Claire begins a freeway / expressway stretch for U.S. 53 north to the city limits of Superior. The c. 2006 freeway in Eau Claire bypasses most of the city, alleviating congestion on the original route (signed now as both Business U.S. 53 and Hastings Way). Business U.S. 53 / Hastings Way is a mix of grade-separated interchanges and at-grade intersections, and is routed through Eau Claire, passing within about one mile (1.6 km) of downtown Eau Claire. Other smaller towns between Eau Claire and Superior (Minong and Solon Springs) were bypassed in a similar manner.
Wisconsin's first single-point urban interchange is found along the U.S. 53 bypass of Eau Claire, at its interchange with U.S. 12 in Altoona.[2] This interchange received the 2005 Outstanding Highway Construction award from the Bureau of Project Development.[3]
U.S. 53 continues as a freeway north of Eau Claire past Chippewa Falls to Rice Lake, where it then becomes an expressway with only three grade-separated interchanges (one at 28th Avenue (CTH-V) in Haugen, one at Wisconsin Highway 70 near Spooner and one at Wisconsin Highway 13, immediately southeast of Superior). U.S. 53 has a partial grade-separated interchange with U.S. 2 in the town of Amnicon, but traffic turning from U.S. 2 westbound onto U.S. 53 southbound must take a U-turn at an at-grade crossover past the interchange.
After passing through the city of Superior as a four-lane city surface street (East Second Street) for a 5-mile (8.0 km) stretch, U.S. 53 then approaches the Saint Louis Bay. U.S. 53 then runs together with Interstate 535 and crosses the bay via the John Blatnik Bridge into Minnesota.
In 1989, the entirety of US 53 in Wisconsin was designated the Peace Memorial Highway, commemorating citizens of Wisconsin who have worked to promote international peace.[4]
Minnesota
US 53 enters the state at the city of Duluth on the John Blatnik Bridge over the Saint Louis Bay. US 53 runs concurrently with I-535 for 2.8 miles (4.5 km) as it enters Minnesota. I-535/US 53 has an interchange with I-35 in Duluth, known locally as the "Can of Worms"; it features a pair of left exits from I-35, a stoplight and lane drops over the I-35 bridge.[5]
After its junction with I-35, US 53 continues through Duluth on Piedmont Avenue and Trinity Road for 3.5 miles (5.6 km).
US 53 then runs concurrently with State Highway 194 (MN 194) for six miles (9.7 km), from Trinity Road in Duluth to Lindahl Road in the city of Hermantown. This four-lane stretch of US 53 and MN 194 are also known as the Miller Trunk Highway in the cities of Duluth and Hermantown.
From Hermantown, the route proceeds north to the city of Virginia. The portion of the route from Duluth to Virginia is a four-lane expressway. US 53 has a junction with MN 33 at the unincorporated community of Independence. Continuing northbound, US 53 has an interchange with US 169 in Virginia. In between the US 169 and MN 135 interchanges is the Thomas Rukavina Memorial Bridge. This bridge is the tallest in the state and spans 4 lanes of freeway. Immediately north of Virginia, US 53 has an interchange with MN 169 in Wuori Township.
US 53 then proceeds northwest to International Falls, where it has a junction with US 71 and MN 11.
US 53 in Minnesota passes through Saint Louis and Koochiching counties. Legally, the Minnesota section of US 53 is defined as unmarked legislative routes 106, 11, and 315 in Minnesota Statutes §§ 161.115(37), (246), and 161.114(2). US 53 is not marked with these legislative numbers along the actual highway.
Designations
- A portion of US 53 in Minnesota is officially designated the Voyageur Highway. The Voyageur Highway is a state designation that is also applied to various other state highways in Minnesota.
- The portion of US 53 from the city limits of Virginia to MN 11 in International Falls was designated as Speaker Irvin N. Anderson Memorial Highway in 2009 in honor of former State House Speaker Irv Anderson.[6]
- The 2008 Minnesota Legislature named US 53 between Superior Street and Central Entrance in the city of Duluth as Walter F. Mondale Drive. On June 12, 2008, this section of highway (Piedmont Avenue and Trinity Road) was dedicated as Walter F. Mondale Drive in honor of the former vice president's public service.[7][8]
History
U.S. Highway 53 was extended into Minnesota in 1934. When marked, it was paved from the Wisconsin border to its junction with U.S. 169 in Virginia, on a short segment between Britt and Idington, and from Cusson to the Canadian border.[9] The segment from Virginia to Britt was paved during that year,[10] and the remainder was paved in 1935.[11]
A bypass around Virginia was completed in 1964 and opened to traffic that November;[12] State Highway 135 was extended along the previous alignment through the city.[13]
The expressway section between Duluth and Virginia was constructed by 1970, except the portion between Four Corners and Independence.
A new four-lane divided highway section of U.S. 53 in Duluth was constructed in 2004. This section of the route is known locally as Piedmont Avenue. Previously, from 1934 to 2004, this same section of U.S. 53 was a narrow two-lane roadway that had proceeded up the hill to a seven-legged intersection that had included Duluth's Skyline Parkway. Locally, this now-defunct famous intersection, had been known for 70 years by the name "Seven Corners".
A new U.S. Highway 53 interchange with State Highway 169 in Wuori Township was built in 2006.
A four-lane expressway from north of the city of Virginia to the south city limits of Cook was constructed beginning in 2009 as part of a long-range goal of providing a four-lane highway to Canada as part of the Falls-to-Falls Corridor. The first stage, from approximately County Road 307 to 0.25 miles south of County Road 652 (Goodell Road), was completed in 2009;[14] the second stage was completed in the fall of 2013.
Relocation between Eveleth and Virginia
On May 5, 2010, Cliffs Natural Resources provided notice to the Minnesota Department of Transportation (MnDOT) that U.S. Highway 53 easement rights across the United Taconite Mine, per a 1960 agreement, would be terminated to allow for expansion of the mine. United Taconite and MnDOT negotiated an agreement to move the roadway by 2017.[15]
There were three rerouting options proposed:[16]
- West – Following State Highway 37 and Saint Louis County Road 7.
- Center – Through the Auburn Pit; on the south side of the existing route of Highway 53.
- East – Around and across the Rouchleau Pit; on the north side of the existing route of Highway 53.
The East route was selected for the project and construction began in November 2015,[17] with the realignment reaching completion in 2017. On September 15, the new roadway was opened, with a dedication of the bridge spanning the Rouchleau Pit. The bridge is the tallest in the state at 204 feet (62 m) in height.[18]
Falls-to-Falls Corridor
The Falls-to-Falls Corridor (officially The Falls-to-Falls Corridor—United States Route 53 from International Falls on the Minnesota/Canada border to Chippewa Falls, Wisconsin) is, by the United States federal government, a recognized trade corridor.
In the 1990s, the federal government listed the corridor as a priority for development. The primary development planned is infrastructure-related, specifically, a highway project hoped to spur economic development in northwestern Wisconsin and northeastern Minnesota by upgrading U.S. Highway 53 to full expressway standards from Chippewa Falls, Wisconsin to International Falls, Minnesota. Interstate Highway 535 forms the only section of the route that is part of the Interstate Highway System.
Wisconsin
With the exception of a 5-mile (8.0 km) stretch as a four-lane city surface street (East Second Street) in the city of Superior, the entire route within Wisconsin is completed to freeway or expressway standards. On the south end of the corridor, the connection to Interstate Highway 94 is a 7.5-mile (12.1 km) stretch through the Eau Claire-Chippewa Falls conurbation. After years of legal and political wrangling, the decision was made in the late 1990s to bypass the current route, rather than to upgrade the present highway to freeway standards. The northern half of this bypass, as far south as WIS 312 was opened to traffic in mid-2005. The southern half of the bypass, which includes a pair of multilane bridges over the Eau Claire River, goes mostly through Altoona and includes interchanges with WIS 312, U.S. Highway 12 and WIS 93. This project won multiple awards in 2005 and 2006.[3] This section of the bypass was opened mid-morning on August 21, 2006.
Minnesota
Federal funding for the project in northern Minnesota was $940,000 in 2003 and nearly $600,000 in 2004.[19] At present, with the exception of 3.5 miles (5.6 km) stretch within the city of Duluth (Piedmont Avenue and Trinity Road), the route is completed as an expressway as far north as the city of Cook, leaving approximately 73 miles (117 km) of the route to International Falls to be upgraded to expressway standards.
Major intersections
State | County/Division | Location | mi[1][20] | km | Exit[21] | Destinations | Notes |
---|---|---|---|---|---|---|---|
Wisconsin | La Crosse | La Crosse | 0.00 | 0.00 | WIS 16 east (Cameron Street) / US 14 east / US 61 / Great River Road south / Alt. I-90 west | Cameron St. is a one-way street; southern terminus of southbound US 53; I-90 Alt. follows US 14/WI 16 (Cameron St.); road continues as US 14 east/US 61/GRR south (3rd Street south) | |
WIS 16 (Cass Street) / US 14 west / US 61 north / Great River Road / Alt. I-90 east – La Crescent | Cass St. is a one-way street; southern terminus of northbound US 53; I-90 Alt. follows US 14/WI 16 west (Cass St.); road continues north from US 14/US 61/GRR (4th Street) | ||||||
WIS 35 south (George Street) | Southern end of WIS 35 overlap | ||||||
4 | 6.4 | I-90 west / WIS 35 north / Great River Road north – Minnesota, Onalaska | Northern end of WIS 35 overlap; southern end of I-90 overlap; I-90 exit 3 | ||||
Onalaska | I-90 east / WIS 157 east – Madison, LaCrosse | South end of expressway; northern end of I-90 overlap; southern end of WIS 157 overlap; I-90 exit 4 | |||||
6 | WIS 157 west / CTH-OS (Main Street) | Northern end of WIS 157 overlap | |||||
7 | CTH-S (Sand Lake Road) | ||||||
Holmen | 9 | CTH-OT – Midway | |||||
11 | WIS 35 south / CTH-HD / Great River Road (Holmen Drive) | Southern end of WIS 35 overlap | |||||
13 | CTH-MH (McHugh Road) | ||||||
15 | WIS 35 north / CTH-HD / Great River Road – Holmen, Trempealeau WIS 93 begins | North end of expressway; northern end of WIS 35 overlap; southern end of WIS 93 overlap | |||||
Trempealeau | Town of Gale | WIS 54 east – Melrose | Eastern end of WIS 54 overlap | ||||
Galesville | 23 | 37 | WIS 54 west / WIS 93 north – Centerville | Western end of WIS 54 overlap; northern end of WIS 93 overlap | |||
Blair | WIS 95 east – Blair, Hixton | Eastern end of WIS 95 overlap | |||||
Town of Preston | WIS 95 west – Arcadia | Western end of WIS 95 overlap | |||||
Whitehall | WIS 121 west – Independence | Southern end of WIS 121 overlap | |||||
Pigeon Falls | WIS 121 east – Northfield | Northern end of WIS 121 overlap | |||||
Osseo | 69 | 111 | US 10 east / Alt. I-94 east – Fairchild, Neillsville | Eastern end of US 10 and Alternate I-94 overlap | |||
Town of Sumner | 70 | 110 | US 10 west – Mondovi | Western end of US 10 overlap | |||
Eau Claire | Eau Claire | 86 | 138 | 84 | I-94 – Madison, St. Paul | Cloverleaf interchange; south end of freeway; southbound exits signed as 84A (east) and 84B (west); no exit numbers northbound | |
85 | CTH-AA / Golf Road | ||||||
86 | Bus. US 53 (Hastings Way) / WIS 93 south – La Crosse | US 53 Business only signed northbound | |||||
Altoona | 89 | 143 | 87 | US 12 (Clairemont Avenue) – Fairchild, Eau Claire | Wisconsin's first SPUI[3] | ||
89 | River Prairie Drive | ||||||
Eau Claire | 90 | WIS 312 / CTH-Q (North Crossing) | |||||
Chippewa | Lake Hallie | 92 | Melby Street | ||||
94 | Bus. US 53 / WIS 124 / CTH-OO / Alt. US 53 – Chippewa Falls, Lake Hallie | ||||||
95 | WIS 29 / Alt. I-94 west – Menomonie, Green Bay | Signed as exits 95A (east) and 95B (west), western end of Alternate I-94 overlap | |||||
Chippewa Falls | 96 | Bus. WIS 29 / CTH-X / Alt. US 53 – Menomonie, Chippewa Falls | |||||
Town of Tilden | 99 | CTH-S – Chippewa Falls, Jim Falls | |||||
102 | CTH-B – Tilden | ||||||
Bloomer | 110 | WIS 40 – Bloomer, Colfax | |||||
Town of Bloomer | 112 | WIS 64 – Cornell, New Richmond | |||||
New Auburn | 118 | CTH-M – New Auburn | |||||
Barron | Town of Chetek | 126 | CTH-I – Chetek | ||||
Cameron | 137 | 220 | 135 | US 8 – Barron, Cameron | |||
Rice Lake | 140 | CTH-O – Rice Lake | |||||
143 | WIS 48 – Rice Lake, Cumberland | ||||||
Oak Grove | 26th Avenue | At-grade intersection; north end of freeway | |||||
150 | CTH-V (28th Avenue) – Haugen | Interchange | |||||
Washburn | Town of Sarona | WIS 253 north – Spooner | |||||
Town of Spooner | 165 | WIS 70 – Spooner, Stone Lake | Interchange | ||||
167 | 269 | 168 | US 63 south – Spooner, Shell Lake | Interchange; southern end of US 63 overlap | |||
Town of Trego | 183 | 295 | US 63 north – Hayward, Ashland | Northern end of US 63 overlap | |||
Minong | Bus. US 53 north | ||||||
WIS 77 – Minong, Danbury | |||||||
Bus. US 53 south | |||||||
Douglas | Solon Springs | Bus. US 53 north | |||||
Bus. US 53 south | |||||||
Town of Amnicon | 226 | 364 | 222 | US 2 east – Ashland | Interchange; southern end of US 2 overlap; no southbound entrance | ||
CTH-C to US 53 south – Spooner, Eau Claire | Provides U-turn to US 53 south for travelers coming from US 2 west | ||||||
Town of Parkland | 227 | WIS 13 south / CTH-Z / LSCT east – Port Wing, Bayfield | Interchange | ||||
Superior | 237 | 381 | US 2 / LSCT west – Duluth | Northern end of US 2 overlap; southern end of US 2 Truck | |||
Truck US 2 west | Northern end of US 2 Truck overlap | ||||||
239 | 385 | I-535 begins / WIS 35 south – Duluth | South end of freeway; southern end of I-535 overlap | ||||
St. Louis Bay | 240 0.000 | 390 0.000 | John A. Blatnik Bridge | ||||
Minnesota | St. Louis | Duluth | 0.536– 0.705 | 0.863– 1.135 | — | Garfield Avenue | |
1.421– 1.675 | 2.287– 2.696 | — | I-35 / I-535 ends / LSCT – St. Paul, Minneapolis | Northern end of I-535 overlap | |||
— | W. Superior Street / 21st Avenue N. | ||||||
6th Street | At-grade intersection; north end of freeway | ||||||
MN 194 east (Central Entrance) | Southern end of MN 194 overlap | ||||||
Hermantown | 11.526 | 18.549 | MN 194 west to US 2 – Grand Rapids | Northern end of MN 194 overlap | |||
New Independence Township | 24.134 | 38.840 | MN 33 south – Cloquet | ||||
Fayal Township | 55.871 | 89.916 | MN 37 west – Hibbing | Interchange; southern end of MN 37 overlap | |||
Eveleth | 60.028– 60.530 | 96.606– 97.414 | MN 37 east – Gilbert | Interchange; northern end of MN 37 overlap | |||
Virginia | 63.054– 63.506 | 101.476– 102.203 | MN 135 north – Gilbert | Interchange | |||
64.144 | 103.230 | 2nd Avenue West | Former MN 135 / US 53 Bus. | ||||
65.716– 66.029 | 105.760– 106.263 | US 169 south – Mountain Iron, Hibbing, Grand Rapids | Interchange | ||||
66.753 | 107.429 | CSAH 102 (9th Street North) | Former MN 135 | ||||
Wuori Township | 68.648 | 110.478 | CSAH 103 – Virginia | Former US 53 Bus. | |||
70.387– 71.031 | 113.277– 114.313 | MN 169 north – Tower, Ely | Interchange | ||||
Sherman Corner | 87.140 | 140.238 | MN 1 east / CSAH 22 – Tower, Ely | Southern end of MN 1 overlap | |||
Field Township | 94.168 | 151.549 | MN 1 west / CSAH 115 – Effie, Northome | Northern end of MN 1 overlap | |||
101.030 | 162.592 | MN 73 south – Chisholm, Hibbing | |||||
Koochiching | Ray | 146.275 | 235.407 | MN 217 west – Littlefork | |||
Rainy Lake | 160.218 | 257.846 | CSAH 332 | Formerly MN 332 | |||
International Falls | 163.968 | 263.881 | MN 11 west (3rd Avenue) | Western end of MN 11 overlap | |||
164.040 | 263.997 | MN 11 east (4th Street) – Island View | Eastern end of MN 11 overlap | ||||
164.105 | 264.101 | US 71 south (3rd Street) – Bemidji | Southern end of US 71 overlap | ||||
United States–Canada border | Rainy River | 164.361 | 264.513 | Fort Frances–International Falls International Bridge[a] | |||
Highway 71 north – Fort Frances | Northern end of US 71 overlap; continuation into Canada | ||||||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
- ^ Canada-bound drivers pay US$7 to cross bridge. No toll for US-bound drivers.
See also
References
- ^ a b "U.S. Route Number Database". Transportation.org. American Association of State Highway and Transportation Officials. Retrieved August 5, 2018.
- ^ Chris Bessert. Wisconsin Highways - Highway 53 2006, URL accessed 2006 December 31
- ^ a b c "US 53 project". Wisconsin Department of Transportation. October 3, 2006. Archived from the original on October 7, 2006.
- ^ Wisconsin Department of Transportation. "Commemorative Highways & Bridges". Retrieved February 10, 2022.
- ^ "Overview Map and Aerial Photo of the Can of Worms" (Map). Google Maps. Retrieved June 8, 2009.
- ^ Jon Ellis (2009-04-16). "Pawlenty approves Irv Anderson Memorial Highway". FOX 21 Online. Archived from the original on July 11, 2011. Retrieved 2010-07-20.
- ^ "2021 Minnesota Statutes ch. 810.14". Office of the Revisor of Statutes. Retrieved February 10, 2022.
- ^ "Duluth to dedicate Mondale Drive". Duluth News Tribune. June 11, 2008. Retrieved February 10, 2022.
- ^ 1934 Map of Trunk Highway System, State of Minnesota (Map). Cartography by McGill-Warner Co. Minnesota Highway Department. May 1, 1934. § L-3 to O-10. Retrieved September 14, 2018.
- ^ 1935 Map of Trunk Highway System, State of Minnesota (Map). Cartography by McGill-Warner Co. Minnesota Highway Department. April 1, 1935. § L-3 to O-10. Retrieved September 14, 2018.
- ^ 1936 Map of Trunk Highway System, State of Minnesota (Map). Cartography by McGill-Warner Co. Minnesota Highway Department. April 1, 1936. § L-3 to O-10. Retrieved September 14, 2018.
- ^ Schumann, Lois; Biondich, Mary (December 1964). Buxton, Tom (ed.). "News from Central Offices and Districts - Maintenance Area 1-B". Minnesota Highways. Vol. 14, no. 2. Minnesota Department of Highways. p. 13. Retrieved December 5, 2018.
- ^ Construction Project Log Record, Control Section 6918 (PDF), Minnesota Highway Department, retrieved September 14, 2018
- ^ "U.S. Highway 53 from Virginia to Cook – Four-lane expansion improvement project". Minnesota Department of Transportation. 2009. Archived from the original on November 2, 2011. Retrieved August 3, 2011.
- ^ "U.S. Highway 53 Relocation between Eveleth and Virginia". Minnesota Department of Transportation. May 5, 2010. Archived from the original on December 22, 2017. Retrieved August 3, 2011.
- ^ "Highway 53 Realignment Study - United Taconite" (PDF). Short Elliot Hendrickson Inc. Archived from the original (PDF) on September 27, 2015 – via Minnesota Department of Transportation.
- ^ "MnDOT to relocate highway to make room for now-idled iron mine". St. Paul Pioneer Press. November 3, 2015. Retrieved September 15, 2018.
- ^ Slater, Brady (September 16, 2017). "Tallest bridge in Minnesota is dedicated. You can drive over it really soon". St. Paul Pioneer Press. Retrieved September 15, 2018.
- ^ "U.S. Transportation Secretary Mineta Announces $3.8 for Minnesota Transportation Projects". U.S. Department of Transportation. May 4, 2004. Retrieved September 18, 2010.
- ^ Minnesota Department of Transportation. "Statewide Trunk Logpoint Listing" (PDF). St. Paul: Minnesota Department of Transportation. Retrieved October 22, 2010.
- ^ Wisconsin Department of Transportation. "Exit numbers on US 53". Retrieved 2007-12-12.
External links
- Endpoints of U.S. Highway 53
- Details of Routes 51 to 75. Steve Riner's Unofficial Minnesota Highways Page
- U.S. Route 53
- United States Numbered Highway System
- U.S. Highways in Minnesota
- U.S. Highways in Wisconsin
- Transportation in La Crosse County, Wisconsin
- Transportation in Trempealeau County, Wisconsin
- Transportation in Eau Claire County, Wisconsin
- Transportation in Chippewa County, Wisconsin
- Transportation in Barron County, Wisconsin
- Transportation in Washburn County, Wisconsin
- Transportation in Douglas County, Wisconsin
- Transportation in St. Louis County, Minnesota
- Transportation in Koochiching County, Minnesota