Billingham Biomass Power Station
Appearance
This article needs to be updated.(November 2015) |
Billingham Biomass Power Station | |
---|---|
Country | England |
Location | Billingham |
Coordinates | 54°35′13″N 1°15′40″W / 54.587°N 1.261°W |
Status | Planned |
Owner | Gaia Power |
Thermal power station | |
Primary fuel | Biomass |
Power generation | |
Nameplate capacity | 45 MW |
Billingham Biomass Power Station is a planned biomass power station, that is to be built on the River Tees at Billingham. It is to be built on the site of the former coal-fired North Tees Power Station.[1] The station will have a generating capacity of 45 megawatts (MW).[2]
The station was granted planning permission in October 2009.[2] The construction of the power station will cost £200 million, and is expected to be completed by 2012. The project was initiated by Gaia Power, who chose Aker Solutions to develop the project.[3]
As at September 2024 the old power station site remains undeveloped.
References
[edit]- ^ "£200 million biomass plant wins planning approval". New Energy Focus. 16 October 2009.
- ^ a b Blackburn, Mike (16 October 2009). "Billingham biomass power station to go ahead". nebusiness.com. Retrieved 23 December 2010.
- ^ "Latest News". Gaia Power. Archived from the original (PHP) on 16 October 2011. Retrieved 27 August 2011.