Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
Jump to content

Changping station (Guangzhou Metro)

From Wikipedia, the free encyclopedia
Changping

长平
Guangzhou Metro
Platform 2
Chinese name
Simplified Chinese长平站
Traditional Chinese长平站
Transcriptions
Standard Mandarin
Hanyu PinyinXīngǎngdōng Zhàn
Yue: Cantonese
Jyutpingsan1gong2dung1 zaam6
General information
LocationGuangshan Highway
Yongshun Dadao, Huangpu District, Guangzhou, Guangdong
China
Operated byGuangzhou Metro Co. Ltd.
Line(s)     Line 21
Platforms2 (2 side platforms)
Tracks2
Construction
Structure typeElevated
AccessibleYes
Other information
Station code2111
History
Opened20 December 2019; 4 years ago (2019-12-20)
Services
Preceding station Guangzhou Metro Following station
Shuixi
towards Tianhe Park
Line 21 Jinkeng

Changping Station (Chinese: 长平站; pinyin: chángpíng) is a station on Line 21 of the Guangzhou Metro that became operational on 20  December 2019.

Station layout

[edit]
F4 - Passageway between Platforms 1 & 2
F3
Platforms
North Lobby Customer Service, Vending machines
Side platform, doors will open on the right
Platform 2 arrow for L  21  towards Tianhe Park (Shuixi)
Platform 1  21  towards Zengcheng Square (Jinkeng) arrow for R
Side platform, doors will open on the right
South Lobby Customer Service, Vending machines
F2
Buffer Area
Buffer Area Buffer area of South Lobby, Station equipment
Pedestrian Overpass Passageway between North & South Lobbies
G
Concourse
- Exits, Station equipment, Shops, Toilet

Exits

[edit]
Exit number Exit location
Exit A Yongshun Dadao
Exit B1 Yongshun Dadao

THP1

Exit B2 Yongshun Dadao
Exit C1 Yongshun Dadao
Exit C2 Yongshun Dadao
Exit C3 Yongshun Dadao
Exit D Yongshun Dadao
[edit]

References

[edit]