JP Nagar 4th Phase metro station

Coordinates: 12°54′35″N 77°36′01″E / 12.909841°N 77.600237°E / 12.909841; 77.600237
From Wikipedia, the free encyclopedia

JP Nagar 4th Phase
Namma Metro station
Under Construction of JP Nagar 4th Phase station under Pink Line and upcoming Orange Line as of November 2024
General information
LocationOuter Ring Road, JP Nagar 4th Phase, Bengaluru, Karnataka 560078
Coordinates12°54′35″N 77°36′01″E / 12.909841°N 77.600237°E / 12.909841; 77.600237
Owned byBangalore Metro Rail Corporation Ltd (BMRCL)
Operated byNamma Metro
Line(s)Pink Line Orange Line
Platforms  Side platform
Platform-1 → Kalena Agrahara
Platform-2 → Nagawara
Platform Numbers (TBC)
  (TBC)
Tracks2 (TBC)
Construction
Structure typeElevated, Double track
Platform levels2 (TBC)
Parking(TBC)
Accessible(TBC)
Other information
StatusUnder Construction
Station code(TBC)
History
Opening  December 2025; 12 months' time (December 2025)
Electrified750 V DC third rail (Pink Line)
(TBC) (Orange Line)
Services
Preceding station Namma Metro Following station
Jayadeva Hospital
towards Nagawara
Pink Line
(Operational around December 2025)
IIMB
JP Nagar 5th Phase
towards Kempapura
Orange Line
(Proposed)
Terminus
Location
Map

JP Nagar 4th Phase is an upcoming elevated interchange metro station on the North-South corridor of the Pink Line and the ORR-West corridor of the Orange Line[1] of Namma Metro in Bengaluru, India. This station is located near the popular Vega City Mall and serves the residential areas of BTM Layout and JP Nagar 3rd & 4th Phase. This metro station will also act as the terminal station of the proposed Orange Line under Namma Metro Phase 3.

As per the latest updates, this metro station, under the first phase (Pink Line), covering a total distance of 7.5km stretch (Kalena Agrahara - Tavarekere), is expected to be operational around December 2025 [2] instead of September 2025. [3][4][5][6][7]

History

[edit]

Pink Line

[edit]

In March 2017, the Bangalore Metro Rail Corporation Limited (BMRCL) sought bids for building the JP Nagar 4th Phase metro station on the 7.5 km Kalena Agrahara - South Ramp section of the 21.25 km Pink Line of Namma Metro. This section comprises 5 stations, excluding Jayadeva Hospital, which was part of a joint venture between HCC - URC Constructions. Initially, Simplex Infrastructures won the tender in September 2017 but due to slow progress, their contract was terminated. [8] In July 2021, GR Infraprojects became the lowest bidder and was awarded the Rs 364.87 Crore contract for this section. They commenced the construction of this metro station as per the agreement. [9]

Station layout

[edit]

Pink Line - To Be Confirmed

[edit]
JP Nagar 4th Phase track layout (TBC)
P#
P#
to IIMB
Station with two tracks and two side platforms
**Under Construction
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Southbound
Towards → Kalena Agrahara
Next Station: IIMB
Platform #
Northbound
Towards ← Nagawara
Next Station: Jayadeva Hospital Change at the next station for Yellow Line
Side platform | Doors will open on the left Disabled access

Orange Line (Proposed) - To Be Confirmed

[edit]
JP Nagar 4th Phase track layout (TBC)
to JP Nagar 5th Phase
P#
P#
to Train Terminates Here
Station with two tracks and two side platforms
**Proposed
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform #
Southbound
Towards → Train Terminates Here
Platform #
Northbound
Towards ← Kempapura
Next Station: JP Nagar 5th Phase
Side platform | Doors will open on the left Disabled access
L2

Connections

[edit]

Entry/Exit

[edit]

See also

[edit]

References

[edit]
  1. ^ "Namma Metro Pink Line: Route, Status, Completion Date & More". timesproperty. Retrieved 15 December 2023.
  2. ^ "Bengaluru: Namma Metro pushes Pink Line deadline to December 2026". Deccan Herald. Retrieved 4 November 2024.
  3. ^ Bureau, The Hindu (4 August 2024). "Namma Metro's Pink line likely to open in phases". The Hindu. ISSN 0971-751X. Retrieved 7 August 2024. {{cite news}}: |last= has generic name (help)
  4. ^ "Namma Metro's Pink Line: This Upcoming Corridor Is Set To Redefine The City Commute". TimesNow. 25 June 2023. Retrieved 15 December 2023.
  5. ^ "Namma Metro Phase 2 In Bengaluru To Be Operational By 2025, Announces Karnataka Deputy CM". TimesNow. 10 February 2024. Retrieved 12 February 2024.
  6. ^ Staff Reporter (27 September 2023). "Good News! Pink Line of Bengaluru Metro to be 90% Ready by Second-half of 2024". Metro Rail News. Retrieved 15 December 2023.
  7. ^ "Namma Metro: Bengaluru's Under-Construction Pink Line Slated To Achieve 2 Milestones In a Week". TimesNow. 31 January 2024. Retrieved 1 February 2024.
  8. ^ "Bangalore Metro Terminates Simplex Infra's Pink Line Contract". The Metro Rail Guy. 4 February 2021. Retrieved 29 March 2024.
  9. ^ "GR Infra Wins Bangalore Metro Pink Line's Pending Work". The Metro Rail Guy. 16 July 2021. Retrieved 29 March 2024.