Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
Jump to content

Rapid transit in the United Kingdom

From Wikipedia, the free encyclopedia

Operational rapid transit systems in the United Kingdom

Rapid transit in the United Kingdom consists of four systems: the London Underground and the Docklands Light Railway in London; the Tyne and Wear Metro in Tyne and Wear; and the Glasgow Subway. The term may also include commuter rail systems with aspects of rapid transit such as the London Overground and Elizabeth line in London, and Merseyrail in the Liverpool City Region. Rapid transit has also been proposed in other UK cities including Sheffield, Manchester, Leeds, Birmingham, Cardiff, Bristol, and Cambridge.

History

[edit]

The United Kingdom is the birthplace of rapid transit, with London and Liverpool hosting the world's first and second urban rail transit and Glasgow the fourth. From 1893 to 1956, the Liverpool Overhead Railway was the only elevated rapid transit in the country, however fell into disuse being demolished in 1957. In the 20th and 21st century, the United Kingdom has chosen to not prioritise investment in rapid transit schemes; instead cities like Manchester, Sheffield, and Edinburgh have opted for trams.

List of systems

[edit]
City System Start of operations System length Lines[a] Stations[b] Voltage Notes
London London Underground 10 January 1863 402 km 11 272 630 V DC fourth rail The oldest rapid transit system, incorporating the world's first underground railway.
London Docklands Light Railway 31 August 1987 34 km 7 (routes) 45 750 V DC third rail An automated light metro system opened in 1987 to serve the redeveloped Docklands area of London.
Tyne and Wear Tyne and Wear Metro 11 August 1980 74.5 km 2 60 1500 V DC OLE A rapid transit and light rail system in North East England, serving Newcastle upon Tyne, Gateshead, South Tyneside, North Tyneside and Sunderland in the Tyne and Wear region.
Glasgow Glasgow Subway 14 December 1896 10.5 km 1 15 600 V DC third rail An underground light metro line in Glasgow. It is the third-oldest underground metro system in the world after the London Underground and the Budapest Metro, and the only underground metro system in the British Isles outside England.

The following are usually referred to as commuter rail systems, but possess aspects of rapid transit:

City System Start of operations System length Lines[c] Stations[d] Voltage Notes
London London Overground 11 November 2007 123.6 km (official lines) 8 112 third-rail 750 V DC and 25 kV 50 Hz AC (overhead line) A suburban rail network in the United Kingdom, serving a large part of Greater London and parts of Hertfordshire. Contains the East London line, a former London Underground line.
London Elizabeth line 24 May 2022 136 km 1 41 25 kV 50 Hz AC (Overhead line) A railway line in London and its environs constructed under the Crossrail project, providing a new east-west route across Greater London. It provides a high-frequency commuter/suburban passenger service linking parts of Berkshire and Buckinghamshire, via central London, to Essex and South East London, relieving the pressure on other railway services.
Liverpool Merseyrail 1886 (Mersey Railway) 121 km (official lines) 2 official (and one unofficial line) 68 third-rail 750 V DC A commuter rail network, in the Liverpool City Region, England. The network has 68 stations running on 75 miles of route, of which 6.5 miles are underground, forming one of the most heavily used railway networks in the UK outside London.

Defunct systems

[edit]

Cancelled systems

[edit]

Proposed systems

[edit]

See also

[edit]

Notes

[edit]
  1. ^ Indicates lines that are in operation for operational systems, lines that are under construction for under construction systems and proposed lines for proposed systems.
  2. ^ Indicates stations that are in operation for operational systems, stations that are under construction for under construction systems and proposed stations for proposed systems.
  3. ^ Indicates lines that are in operation for operational systems, lines that are under construction for under construction systems and proposed lines for proposed systems.
  4. ^ Indicates stations that are in operation for operational systems, stations that are under construction for under construction systems and proposed stations for proposed systems.

References

[edit]
  1. ^ "'Compelling case' for Greater Cambridge metro". 19 March 2019 – via www.bbc.co.uk.
  2. ^ Young, Chris (10 November 2022). "Latest mass transit scheme consultation could see trams or light rail stops in Pudsey, Bramley and Wortley". West Leeds Dispatch. Retrieved 11 April 2023.
  3. ^ "Improving passenger transport - Hertfordshire Essex Rapid Transit". 28 January 2022 – via www.hertfordshire.gov.uk.