Estudio Hidrogeologico
Estudio Hidrogeologico
Estudio Hidrogeologico
INFORME
HIDROGEOLOGICO
"MEJORAMIENTO DEL SISTEMA DE EVACUACIN, TRATAMIENTO Y
DISPOSICION FINAL DE LAS AGUAS SERVIDAS DE LAS CIUDADES DE
SULLANA Y BELLAVISTA - PROVINCIA DE SULLANA - PIURA"
2015
EXPEDIENTE TECNICO: "MEJORAMIENTO DEL SISTEMA DE EVACUACIN, TRATAMIENTO Y DISPOSICION FINAL DE LAS AGUAS SERVIDAS DE
LAS CIUDADES DE SULLANA Y BELLAVISTA - PROVINCIA DE SULLANA - PIURA"
____________________________________________________________________________________
I.
Generalidades.3
II.
Caractersticas
2.2
Zonificacin
del
Superficial..12
2.3
Generacin
de
Anuales...........15
2.4
Generacin
de
Diarios15
Escurrimiento
Caudales
Medios
Caudales
Mximos
2.5
Clculos
Distribuciones..17
de
Ajuste
para
la
Distribucin
Mximas
EXPEDIENTE TECNICO: "MEJORAMIENTO DEL SISTEMA DE EVACUACIN, TRATAMIENTO Y DISPOSICION FINAL DE LAS AGUAS SERVIDAS DE
LAS CIUDADES DE SULLANA Y BELLAVISTA - PROVINCIA DE SULLANA - PIURA"
____________________________________________________________________________________
GENERALIDADES
Para el desarrollo de la hidrologa del rea de estudio, se ha utilizado la
metodologa:
siguiente
EXPEDIENTE TECNICO: "MEJORAMIENTO DEL SISTEMA DE EVACUACIN, TRATAMIENTO Y DISPOSICION FINAL DE LAS AGUAS SERVIDAS DE
LAS CIUDADES DE SULLANA Y BELLAVISTA - PROVINCIA DE SULLANA - PIURA"
____________________________________________________________________________________
Para el anlisis de los caudales que caracterizan el comportamiento de las aguas que
fluyen por las quebradas y ros, se ha tomado los datos de la estacin hidromtrica
Puente Sullana que registra los caudales de estos del ro Chira.
En este captulo se explica y se presentan los resultados de los diferentes mtodos de
anlisis utilizados. Todos los anlisis se han aplicado tanto a los caudales anuales como
mensuales, y sus resultados se presentan en forma de Cuadros y grficos.
II.
EXPEDIENTE TECNICO: "MEJORAMIENTO DEL SISTEMA DE EVACUACIN, TRATAMIENTO Y DISPOSICION FINAL DE LAS AGUAS SERVIDAS DE
LAS CIUDADES DE SULLANA Y BELLAVISTA - PROVINCIA DE SULLANA - PIURA"
____________________________________________________________________________________
territorio peruano hasta su desembocadura en el mar despus de haber recorrido
aproximadamente 300km.
c)
Quebrada El Cieneguillo.- Recolecta las aguas de la zona del Cieneguillo
convergiendo en el punto denominado La Selva. All se une con la quebrada Cola del
Alacrn entre las urbanizaciones Sullana y Salaverry. Desde esta zona corre de
Sureste a Noroeste y se une a la Quebrada de Bellavista, hasta desembocar en el ro
Chira (detrs del cementerio). En la Lmina N II.5.2, se muestra el trazo de la cuenca
de la Quebrada Cieneguillo.
d) Quebrada Cola del Alacrn.Recolecta las aguas de la zona ms elevada al Oeste de la ciudad (lado derecho de la
Carretera Panamericana con direccin a Piura), paulatinamente ensancha su cauce
hasta llegar al canal transversal de regado, y siguiendo la trayectoria de una curva de
90 con direccin Este, pasa detrs del colegio Chanel, atraviesa la Carretera
Panamericana y la Urbanizacin FONAVI hasta unirse a la Quebrada Cieneguillo.
e) Quebrada de Bellavista.Drena las aguas de las partes altas desde Sureste y Este, atraviesa el distrito de
Bellavista por el lado Norte del Cuartel del Ejrcito (calle Canchaque) desembocando
en la Quebrada Cieneguillo por el sector denominado: el Mercadillo. En su cauce se
ubica el AA.HH. Basadre destruido en las inundaciones de los Fenmenos El Nio de
1983 y 1998.
f) Quebrada El Boquern.Ubicada en el extremo Este de la ciudad, formada por una erosin fluvial debido a la
construccin de un dique de defensa para evitar las inundaciones de la quebrada de
Bellavista y sus afluentes. Tiene casi 30 m de profundidad y 100 m de ancho en su
desembocadura.
En el Grfico 2.1.4.1, se muestra el diagrama fluvial de la cuenca en estudio.
EXPEDIENTE TECNICO: "MEJORAMIENTO DEL SISTEMA DE EVACUACIN, TRATAMIENTO Y DISPOSICION FINAL DE LAS AGUAS SERVIDAS DE
LAS CIUDADES DE SULLANA Y BELLAVISTA - PROVINCIA DE SULLANA - PIURA"
____________________________________________________________________________________
EXPEDIENTE TECNICO: "MEJORAMIENTO DEL SISTEMA DE EVACUACIN, TRATAMIENTO Y DISPOSICION FINAL DE LAS AGUAS SERVIDAS DE
LAS CIUDADES DE SULLANA Y BELLAVISTA - PROVINCIA DE SULLANA - PIURA"
____________________________________________________________________________________
Cuenca
Baja
del
Ro Chira
55,054.40
113.67
36.30
200
50
0.41
125
0.14
0.53
EXPEDIENTE TECNICO: "MEJORAMIENTO DEL SISTEMA DE EVACUACIN, TRATAMIENTO Y DISPOSICION FINAL DE LAS AGUAS SERVIDAS DE
LAS CIUDADES DE SULLANA Y BELLAVISTA - PROVINCIA DE SULLANA - PIURA"
____________________________________________________________________________________
Para estos puntos de control, se han analizado los caudales medios mensuales
correspondientes a la estacin Puente Sullana (periodo 1937-1995)
En el Cuadro 2.1.4.3, se presenta la ubicacin geogrfica, poltica y el perodo de
registro de la data hidromtrica de la estacin hidromtrica de estudio.
Cuadro 2.2: Caractersticas de la Estacin Hidromtrica Puente Sullana
Coordenadas
UTM
Estac
in
Tipo
Este
Coordenadas
Geogrficas
Norte
Longi
tud
Puent
e
Sullan
a
Hidrol
gica
534,2
47
Ubicacin Poltica
9459,
334
80
41'
28" W
Lati
tud
04
53'
29"
S
Alti
tud
32.3
Distr
ito
Sulla
na
Provi
ncia
Sullan
a
Perod
o
de
Inform
acin
Depa
rta
ment
o
Piura
19371995
(Datos
de
caudal
es
medios
)
19722008
(Datos
de
caudal
es
mxim
os)
EXPEDIENTE TECNICO: "MEJORAMIENTO DEL SISTEMA DE EVACUACIN, TRATAMIENTO Y DISPOSICION FINAL DE LAS AGUAS SERVIDAS DE LAS CIUDADES DE SULLANA Y BELLAVISTA - PROVINCIA DE SULLANA - PIURA"
____________________________________________________________________________________
Cuadro 2.3: Caudales Mensuales de la Estacin Hidromtrica del Puente Sullana (m 3/s)
Ao
1937
1938
1939
1940
Ene
45.94
19.16
69.71
92.06
Feb
66.82
58.07
323.82
117.64
Mar
81.06
237.90
473.81
242.19
Abr
78.87
302.83
700.13
145.83
May
40.06
116.90
330.13
119.74
Jun
49.43
88.83
239.40
90.87
Jul
41.45
53.29
136.00
72.10
Ago
15.94
31.94
121.19
66.94
Set
21.03
30.53
67.53
57.77
Oct
16.71
26.77
40.90
49.32
Nov
7.40
18.30
20.80
38.37
Dic
20.65
14.90
52.03
56.10
Anual
40.38
83.29
214.84
95.59
1941
176.74
877.71
667.16
537.17
388.16
128.77
57.55
27.52
27.17
23.65
13.77
36.42
248.04
1942
86.35
50.89
144.52
87.80
91.61
27.77
20.94
24.90
25.80
18.84
6.07
6.06
49.26
1943
104.45
774.07
801.10
721.80
390.98
204.90
67.02
42.00
42.21
31.81
22.53
26.51
269.91
1944
74.13
150.00
182.68
151.40
115.16
42.33
37.42
18.39
24.83
13.94
5.77
26.84
70.37
1945
81.39
294.79
154.77
179.23
60.45
39.70
37.71
36.77
27.87
9.65
16.00
23.48
80.59
1946
38.26
128.75
196.45
151.00
49.77
70.10
31.87
38.42
40.27
25.29
27.73
19.97
68.07
1947
35.52
64.89
64.81
62.13
55.39
32.63
24.26
24.42
20.03
37.13
52.37
54.19
44.11
1948
70.68
62.11
83.03
133.93
42.55
39.23
28.74
15.52
12.73
18.74
16.53
12.87
44.73
1949
25.42
125.99
727.00
364.51
45.94
41.23
33.00
17.23
26.90
33.42
18.98
33.00
124.23
1950
22.81
57.07
26.81
51.20
35.51
34.80
29.20
37.48
17.43
24.81
16.97
62.29
34.77
1951
164.94
179.25
166.74
176.17
99.06
54.53
46.35
18.39
8.53
18.00
29.50
44.42
83.97
1952
101.23
160.82
235.10
154.93
90.13
52.73
27.58
23.81
11.33
18.45
11.97
17.77
75.40
1953
87.65
378.71
696.39
936.73
253.35
220.57
130.65
41.68
34.50
33.06
63.73
68.84
246.03
1954
46.74
105.79
102.84
78.90
42.06
26.20
19.45
14.81
16.63
43.00
16.40
41.71
46.31
1955
133.29
89.21
150.29
193.13
88.55
49.57
48.58
24.65
13.87
14.84
16.57
29.26
71.05
1956
21.26
88.54
279.58
125.40
72.65
62.70
63.55
42.90
36.73
40.77
22.30
12.58
72.21
1957
17.84
80.79
291.77
433.30
202.35
46.03
26.71
20.97
15.87
14.00
36.27
13.71
100.56
1958
60.26
112.96
295.61
233.70
162.35
47.57
33.42
28.29
25.27
24.77
18.07
9.94
87.85
1959
13.87
36.75
197.23
114.73
62.81
26.67
45.90
17.42
15.37
12.77
19.87
23.58
48.97
1960
32.48
126.68
160.61
111.73
47.94
44.70
16.74
15.10
14.67
12.13
9.00
8.65
50.01
EXPEDIENTE TECNICO: "MEJORAMIENTO DEL SISTEMA DE EVACUACIN, TRATAMIENTO Y DISPOSICION FINAL DE LAS AGUAS SERVIDAS DE LAS CIUDADES DE SULLANA Y BELLAVISTA - PROVINCIA DE SULLANA - PIURA"
____________________________________________________________________________________
Ao
Ene
Feb
Mar
Abr
May
Jun
Jul
Ago
Set
Oct
Nov
Dic
Anual
1961
21.74
45.43
90.74
99.00
87.00
40.87
23.23
15.39
9.27
15.23
8.03
12.52
39.06
1962
63.94
140.39
218.35
141.00
97.74
37.50
23.55
27.35
21.47
12.61
12.70
13.71
67.63
1963
29.00
56.04
96.26
66.23
38.61
27.70
14.52
9.06
5.60
5.35
11.37
30.74
32.55
1964
25.77
40.71
34.90
71.10
51.26
31.83
14.16
24.35
35.80
22.32
14.37
6.48
31.13
1965
10.77
26.68
562.00
643.37
283.61
114.93
56.65
23.74
22.33
13.71
23.90
11.45
149.68
1966
48.26
58.18
104.97
83.73
48.19
14.17
18.26
10.48
6.60
9.55
4.37
4.52
34.34
1967
23.16
77.82
87.29
52.43
21.23
18.90
31.19
24.65
12.53
9.87
8.00
11.19
31.57
1968
28.90
11.57
53.10
37.57
11.55
9.57
35.87
14.71
11.47
15.26
8.07
4.13
20.12
1969
20.55
42.54
89.48
161.20
42.06
22.93
15.39
23.03
15.60
9.87
21.73
41.19
42.36
1970
90.55
159.89
169.84
74.10
80.48
95.67
25.61
24.68
13.60
19.35
20.40
41.71
67.67
1971
49.35
109.36
476.94
279.47
72.32
81.80
59.48
40.42
27.70
24.26
19.03
26.13
105.25
1972
65.35
85.07
925.65
329.67
150.81
94.00
84.94
31.94
38.63
22.16
30.50
67.10
159.75
1973
130.61
336.93
363.74
411.13
168.94
78.40
55.74
43.94
29.27
15.32
17.90
32.39
140.89
1974
41.81
138.00
149.13
67.63
46.45
30.57
64.06
22.19
13.33
26.06
23.67
62.58
57.31
1975
61.84
128.21
379.87
283.33
98.77
152.70
65.94
54.58
35.50
28.77
28.10
14.74
110.46
1976
83.48
273.29
494.52
384.30
187.74
167.10
124.26
104.58
59.13
36.10
49.80
67.74
169.24
1977
66.84
193.57
290.13
279.40
131.13
99.77
77.97
49.52
38.83
42.48
27.47
39.03
111.43
1978
39.03
49.14
84.23
87.03
55.52
56.07
36.35
43.35
26.43
40.45
18.43
31.29
47.16
1979
39.23
39.61
167.87
103.07
59.16
42.13
38.10
29.48
30.27
27.42
16.23
29.03
51.72
1980
36.10
93.79
93.90
148.27
60.29
52.67
47.45
25.71
23.23
33.42
28.20
46.52
57.60
1981
42.06
59.68
277.13
105.57
61.13
45.30
34.45
18.71
17.67
19.06
11.50
29.10
59.92
1982
39.03
54.18
32.97
23.32
16.00
27.77
41.70
179.32
52.29
750.26
753.57
602.80
168.19
86.90
74.83
109.16
60.87
74.19
506.85
1984
91.03
450.39
76.07
41.77
1,417.2
928.16
7
462.33 180.71
33.13
1983
58.45
1,064.7
4
716.74
164.40
128.06
81.19
49.90
68.55
52.00
86.84
210.96
1985
99.45
82.71
101.13
69.57
64.93
39.77
41.45
25.03
29.06
18.27
35.55
55.49
10
61.45
EXPEDIENTE TECNICO: "MEJORAMIENTO DEL SISTEMA DE EVACUACIN, TRATAMIENTO Y DISPOSICION FINAL DE LAS AGUAS SERVIDAS DE LAS CIUDADES DE SULLANA Y BELLAVISTA - PROVINCIA DE SULLANA - PIURA"
____________________________________________________________________________________
Ao
Ene
Feb
Mar
Abr
May
Jun
Jul
Ago
Set
Oct
Nov
Dic
Anual
1986
65.81
135.75
107.26
137.87
83.58
41.27
45.35
26.48
27.87
22.03
28.23
42.97
63.98
1987
83.42
213.64
374.00
259.00
184.00
74.50
69.26
39.26
32.40
28.55
17.80
30.03
117.35
1988
52.45
127.41
79.74
102.78
51.03
23.63
29.41
10.81
8.44
17.54
18.81
18.37
45.21
1989
108.09
305.18
422.45
307.33
133.70
92.79
58.77
33.30
25.39
47.79
20.22
8.51
130.35
1990
39.54
86.68
95.80
140.97
86.47
83.87
41.93
25.72
15.16
11.20
20.14
33.86
56.71
1991
33.38
91.27
227.64
123.77
78.18
48.03
44.58
30.24
19.21
16.50
25.15
16.80
62.86
1992
25.75
83.79
471.48
869.25
212.33
98.46
45.96
24.49
20.06
9.89
15.74
27.59
159.34
1993
36.44
150.92
685.37
561.03
168.68
98.50
74.30
40.96
28.36
35.47
35.54
81.77
166.64
1994
151.55
384.76
329.64
372.38
139.49
110.15
76.43
61.60
57.06
47.23
40.39
59.10
152.88
1995
Caudal
Mximo
Caudal
Promedio
Caudal Mnimo
Desviacin
Estndar
59.70
84.78
43.25
27.07
6.38
8.87
9.37
28.55
26.21
750.26
877.71
98.79
107.29 71.83
1,064.7 1,417.2
928.16
4
7
602.80
168.19
121.19
74.83
109.16
63.73
179.32
47.76
1,417.
27
72.48
164.12
283.10
256.65
123.37
78.91
50.15
33.23
26.06
25.96
22.92
34.92
97.66
10.77
11.57
26.81
37.57
11.55
9.57
14.16
6.38
5.60
5.35
4.37
4.13
4.13
97.57
178.28
242.84
260.26
135.89
85.81
32.43
22.08
15.16
16.74
13.28
28.20
94.05
Fuente: SENAMHI
n el Grfico 2.1, se muestra la distribucin temporal de los caudales mximos, medios y mnimos del ro Chira.
11
EXPEDIENTE TECNICO: "MEJORAMIENTO DEL SISTEMA DE EVACUACIN, TRATAMIENTO Y DISPOSICION FINAL DE LAS AGUAS SERVIDAS DE LAS CIUDADES DE SULLANA Y BELLAVISTA - PROVINCIA DE SULLANA - PIURA"
____________________________________________________________________________________
12
EXPEDIENTE TECNICO: "MEJORAMIENTO DEL SISTEMA DE EVACUACIN, TRATAMIENTO Y DISPOSICION FINAL DE LAS AGUAS SERVIDAS DE LAS CIUDADES DE SULLANA Y BELLAVISTA - PROVINCIA DE SULLANA - PIURA"
____________________________________________________________________________________
Para el presente estudio, el rea de estudio ha sido zonificada en franjas homogneas de igual cantidad de escurrimiento superficial, tal
como se muestra en el Mapa de Zonas de Escurrimiento Superficial. El escurrimiento superficial se calcula a partir de los datos de
precipitacin y coeficientes de escurrimiento identificados para cada una de dichas Zonas.
El parmetro de precipitacin anual ha sido tomado de la base de datos del SENAMHI, para un anlisis de la zona del proyecto.
La relacin de la precipitacin media anual se cita las datas de las estaciones meteorolgicas presentadas en el item 4.1.1, con respecto a
la altitud, muestra una correspondencia positiva entre la precipitacin y la altitud; es decir, a mayor altitud, mayor precipitacin; y la
ecuacin generada para esta relacin es:
Cuadro 2.3: Precipitacin Media Mensual (mm)
Estacin
Mallares
La Esperanza
Altitud
(msnm)
29
06
Ene
Feb
Mar
Abr
May
Jun
Jul
Ago
Set
Oct
Nov
Dic
Anual
12.53
5.11
55.81
17.47
30.43
14.43
6.76
7.48
1.65
0.73
0.40
0.67
0.24
0.77
0.09
0.00
0.03
0.03
0.40
0.49
1.81
1.42
2.6
3.19
112.75
51.79
13
Estacin
Pluviomtrica
Mallares
La Esperanza
Altitud
(msnm)
29
06
Precipitacin
Anual (mm)
112.75
51.79
EXPEDIENTE TECNICO: "MEJORAMIENTO DEL SISTEMA DE EVACUACIN, TRATAMIENTO Y DISPOSICION FINAL DE LAS AGUAS SERVIDAS DE LAS CIUDADES DE SULLANA Y BELLAVISTA - PROVINCIA DE SULLANA - PIURA"
____________________________________________________________________________________
14
EXPEDIENTE TECNICO: "MEJORAMIENTO DEL SISTEMA DE EVACUACIN, TRATAMIENTO Y DISPOSICION FINAL DE LAS AGUAS SERVIDAS DE LAS CIUDADES DE SULLANA Y BELLAVISTA - PROVINCIA DE SULLANA - PIURA"
____________________________________________________________________________________
Fuente:
Elaboracin Propia
Dnde:
Y
=
H=
R=
Como
de
1.0
lo
precipitacin anual y la altitud (msnm) de las estaciones donde se registran dichas
En el Cuadro 2.1.4.7 se presenta las caractersticas principales para la Zona de Escurrimiento Superficial correspondiente al rea de
estudio. En dicha Cuadro se aprecia tambin la distribucin altitudinal de la precipitacin, asociada a cada formacin ecolgica (zonas de
escurrimiento).
Cuadro 2.5: Caracterizacin de las Zonas de Escurrimiento Superficial
15
Smbolo
Zona
de
Superficial
Escurrimiento Altitud
(msnm)
ds T
0 1,800
Precipitacin
(mm)*
Escurrimiento
Coeficiente
de
Superficial
Escurrimiento (k)*
(mm)
112.8
0.50
56.4
EXPEDIENTE TECNICO: "MEJORAMIENTO DEL SISTEMA DE EVACUACIN, TRATAMIENTO Y DISPOSICION FINAL DE LAS AGUAS SERVIDAS DE LAS CIUDADES DE SULLANA Y BELLAVISTA - PROVINCIA DE SULLANA - PIURA"
____________________________________________________________________________________
Fuente: Adaptado del Inventario y Evaluacin de los Recursos Naturales de la Zona Alto Andina del Per, Dpto. de Cusco. ONERN, 1985.
*Ajustado a las condiciones de la cuenca
16
EXPEDIENTE TECNICO: "MEJORAMIENTO DEL SISTEMA DE EVACUACIN, TRATAMIENTO Y DISPOSICION FINAL DE LAS AGUAS SERVIDAS DE LAS CIUDADES DE SULLANA Y BELLAVISTA - PROVINCIA DE SULLANA - PIURA"
____________________________________________________________________________________
Cuadro 2.6 Leyenda de Zona de Escurrimiento
Zona de Escurrimiento Superficial
ds T
0.50
56.4
Coeficiente
de
Escurrimiento Escurrimiento Superficial (mm)
Superficial, ajustado
Fuente: Inventario y Evaluacin de los Recursos naturales de la Zona Alto Andina del Per. Dpto. de Cusco. ONERN 1985
Incluye la parte alta de la cuenca del rio Apurmac, donde se ubica parte del proyecto.
II.2.5 Generacin de Caudales Mximos Diarios
Para la generacin de los caudales mximos diarios en el ro Chira, se realiz el anlisis con la data de la estacin Puente Sullana para
diferentes perodos de retorno, lo cual es de suma importancia, principalmente para conocer la magnitud de los caudales mximos que
podran presentarse en los diferentes ros y quebradas.
En el Cuadro 2.1.4.9, se presenta la data de los caudales mximos de la estacin hidromtrica Puente Sullana.
Cuadro 2.7: Caudales Mensuales de la Estacin Hidromtrica del Puente Sullana (m 3/s)
Ao
Ene
Feb
Mar
1972
106.6
203.7
1973
514.8
1974
May
Jun
2640.3 604.4
228.7
281.8
902.9
1208.6 893.9
241.8
111.8
140.4
347.9
266.1
106.2
95.6
43.1
1975
172.2
558.8
816.9
642.8
162.9
347.5
1976
230.1
436.3
872.0
346.1
269.5
1977
1978
1979
1980
42.8
45.0
24.7
31.0
273.6
43.4
24.2
25.2
385.5
28.7
34.9
53.8
145.0
20.9
27.2
26.2
149.7
15.2
11.8
18.9
17
1,249.
5
921.5
51.1
175.5
25.1
Abr
Jul
161.
3
120.
8
255.
9
220.
8
184.
4
80.6
8.2
14.2
10.6
Ago
Sep
138.
0
Oct
Nov
51.7
72.4
112.
8
58.2
24.4
31.6
53.1
22.1
73.4
64.2
108.
5
103.
4
77.4
46.1
38.2
47.3
8.8
17.3
12.4
44.3
6.9
10.5
16.5
72.2
Dic
164.
4
161.
0
193.
4
Anual
57.7
18.9
273.16
28.7
32.5
52.8
314.97
39.5
7.8
10.2
13.4
51.9
14.2
20.1
23.0
47.6
27.6
20.8
27.0
185.23
23.16
32.52
23.65
390.86
366.20
139.29
EXPEDIENTE TECNICO: "MEJORAMIENTO DEL SISTEMA DE EVACUACIN, TRATAMIENTO Y DISPOSICION FINAL DE LAS AGUAS SERVIDAS DE LAS CIUDADES DE SULLANA Y BELLAVISTA - PROVINCIA DE SULLANA - PIURA"
____________________________________________________________________________________
Ao
1981
Ene
32.5
Feb
30.3
Mar
693.7
Abr
163.8
May
52.8
Jun
30.8
Jul
13.7
Ago
22.0
Sep
15.5
Oct
12.3
Nov
13.0
1982
21.4
21.5
17.5
20.3
15.6
11.0
11.5
9.3
7.2
5.4
40.7
1983
1,181.
9
1,422.
0
2,221
2,498
2,702
3,025
92.0
76.0
191.
0
176.
0
53.0
1,157.8
1
1984
168.0
977.0
483.0
126.0
186.0
70.0
50.0
37.0
43.0
37.0
288.82
1985
1986
1987
1988
1989
1990
1991
85.0
27.0
31.7
37.0
26.5
45.0
31.0
54.0
28.0
451.7
35.0
215.0
35.0
26.0
1,059.
0
76.0
30.0
540.0
37.3
545.0
30.0
29.0
42.0
40.0
518.3
27.8
215.0
30.0
31.3
33.0
25.0
69.0
17.8
87.2
21.0
28.4
25.0
32.0
48.3
13.0
32.0
15.0
19.4
15.0
23.0
60.0
11.7
24.7
15.0
21.0
17.0
25.0
64.0
12.0
49.0
20.4
23.0
18.0
22.0
33.8
13.0
49.0
20.3
18.0
30.0
22.5
42.0
16.0
58.0
19.0
22.0
38.07
27.81
206.39
22.36
141.47
24.81
24.77
1992
24.2
130.0
995.0
324.0
118.0
31.0
26.0
35.0
27.0
20.0
20.0
344.18
1993
16.0
27.0
1,400.
0
31.0
35.0
536.0
33.0
360.0
30.0
30.3
2,355.
5
1,100.
0
406.
0
229.
0
32.0
24.0
64.0
14.8
33.8
17.0
18.3
230.0
164.0
210.
0
49.0
36.0
34.0
38.0
38.0
278.39
1994
283.0
560.0
950.0
270.0
76.0
50.0
38.0
55.0
52.0
56.0
53.0
297.73
1995
1996
50.0
11.5
1,100.
0
58.0
15.0
55.0
140.0
58.0
22.0
50.0
19.0
51.0
17.0
44.0
16.0
31.0
15.0
6.0
12.0
6.0
11.0
6.6
10.0
34.97
24.70
1997
10.0
10.0
18.0
12.0
10.0
60.0
48.0
10.0
10.0
63.0
9.0
5.7
10.0
925.
0
1998
1,714.
3
1,406.
0
231.7
71.2
59.6
39.6
40.2
66.3
25.8
917.26
35.5
462.6
398.2
532.5
51.6
30.0
35.0
30.0
20.0
25.0
330.31
2000
30.0
542.4
763.2
450.0
450.0
43.0
52.0
45.4
30.5
23.5
24.1
296.16
2001
26.3
135.5
181.8
519.4
131.
6
66.9
40.0
37.1
22.3
16.0
435.08
2002
17.2
98.7
309.7
115.2
80.0
82.4
35.0
35.0
35.0
61.3
423.17
2003
84.8
80.1
2,204.
3
1,195.
2
1,111.
0
2,252.
9
1,665.
7
45.2
3,005.
0
1999
2,088.
0
1,166.
7
167.7
84.6
32.9
27.7
29.6
30.0
29.2
20.6
60.88
18
1,820.
0
2,516.
5
98.6
Dic
19.5
299.
0
Anual
91.08
40.56
99.87
EXPEDIENTE TECNICO: "MEJORAMIENTO DEL SISTEMA DE EVACUACIN, TRATAMIENTO Y DISPOSICION FINAL DE LAS AGUAS SERVIDAS DE LAS CIUDADES DE SULLANA Y BELLAVISTA - PROVINCIA DE SULLANA - PIURA"
____________________________________________________________________________________
Ao
2004
2005
2006
2007
Ene
38.2
58.9
19.8
61.8
2008
39.5
Prom
149.1
1,714.
Max
3
Min
10.0
S/Nios 90.3
Feb
20.0
22.8
677.1
36.6
2,000.
4
387.0
2,088.
0
10.0
91.3
Mar
19.1
462.1
812.0
40.7
2,012.
5
746.5
2,640.
3
17.5
685.1
Abr
25.3
295.5
802.6
216.7
2,594.
0
674.1
3,005.
0
12.0
559.7
May
23.5
38.2
55.4
57.8
Jun
20.2
36.2
29.3
196.4
647.6
233.8
263.1
2,702.
0
10.0
170.3
208.6
3,025.
0
11.0
126.4
Jul
19.9
26.4
33.4
35.0
128.
2
80.4
406.
0
8.2
74.6
Ago
18.9
28.4
26.1
23.7
Sep
19.6
29.7
50.0
28.4
Oct
17.2
26.4
29.8
24.1
Nov
20.1
24.4
29.7
23.7
Dic
16.8
18.6
67.5
23.7
Anual
21.55
88.80
220.93
63.25
74.0
36.6
29.6
39.9
30.1
659.10
41.0
112.
8
8.8
42.5
35.1
138.
0
6.0
33.8
35.3
191.
0
5.4
30.8
34.8
176.
0
6.6
29.9
73.3
925.
0
5.7
75.3
227.3
3,025.0
5.4
167.5
Rango:
Se define:
Cuadro 2.8: Caudales Mximos Diario en m3/s Distribucin Normal
T(aos)
2
19
P
0.50000
w
1.17741
z
0.00000
Caudal
924.7350
EXPEDIENTE TECNICO: "MEJORAMIENTO DEL SISTEMA DE EVACUACIN, TRATAMIENTO Y DISPOSICION FINAL DE LAS AGUAS SERVIDAS DE LAS CIUDADES DE SULLANA Y BELLAVISTA - PROVINCIA DE SULLANA - PIURA"
____________________________________________________________________________________
T(aos)
5
10
20
50
100
200
500
1,000
P
0.20000
0.10000
0.05000
0.02000
0.01000
0.00500
0.00200
0.00100
w
1.79412
2.14597
2.44775
2.79715
3.03485
3.25525
3.52551
3.71692
z
0.84146
1.28173
1.64521
2.05419
2.32679
2.57624
2.87851
3.09052
Caudal
1,716.1812
2,130.2864
2,472.1660
2,856.8363
3,113.2317
3,347.8567
3,632.1618
3,831.5771
Rango:
Variables:
Se define:
20
P
0.50000
0.20000
0.10000
0.05000
0.02000
0.01000
0.00500
w
1.17741
1.79412
2.14597
2.44775
2.79715
3.03485
3.25525
z
0.00000
0.84146
1.28173
1.64521
2.05419
2.32679
2.57624
Log. Normal
2.62611
3.17411
3.46084
3.69756
3.96391
4.14144
4.30390
EXPEDIENTE TECNICO: "MEJORAMIENTO DEL SISTEMA DE EVACUACIN, TRATAMIENTO Y DISPOSICION FINAL DE LAS AGUAS SERVIDAS DE LAS CIUDADES DE SULLANA Y BELLAVISTA - PROVINCIA DE SULLANA - PIURA"
____________________________________________________________________________________
500
1,000
0.00200
0.00100
3.52551
3.71692
2.87851
3.09052
4.50075
4.63883
Se define:
;
Cuadro 2.10: Caudales Mximos Diario en m3/s - Distribucin de Gumbel
21
T(aos)
-0.15242
0.83353
10
1.48631
20
2.11248
50
2.92299
100
3.53035
Caudal
m3/s
781.37019
1,708.7218
7
2,322.7093
8
2,911.6609
3
3,673.9983
1
4,245.2629
EXPEDIENTE TECNICO: "MEJORAMIENTO DEL SISTEMA DE EVACUACIN, TRATAMIENTO Y DISPOSICION FINAL DE LAS AGUAS SERVIDAS DE LAS CIUDADES DE SULLANA Y BELLAVISTA - PROVINCIA DE SULLANA - PIURA"
____________________________________________________________________________________
Coeficiente de Sesgo
22
T(aos)
200
4.13549
500
4.93387
1,000
5.53726
Caudal
m3/s
0
4,814.4430
3
5,565.3681
5
6,132.8995
6
EXPEDIENTE TECNICO: "MEJORAMIENTO DEL SISTEMA DE EVACUACIN, TRATAMIENTO Y DISPOSICION FINAL DE LAS AGUAS SERVIDAS DE LAS CIUDADES DE SULLANA Y BELLAVISTA - PROVINCIA DE SULLANA - PIURA"
____________________________________________________________________________________
Cuadro 2.11: Caudales Mximos Diario en m3/s Distribucin de Pearson Tipo III
T(aos)
2
5
10
20
50
100
200
500
1,000
P
0.50000
0.20000
0.10000
0.05000
0.02000
0.01000
0.00500
0.00200
0.00100
= Funcin Gamma
23
w
1.17741
1.79412
2.14597
2.44775
2.79715
3.03485
3.25525
3.52551
3.71692
Z
0.00000
0.84146
1.28173
1.64521
2.05419
2.32679
2.57624
2.87851
3.09052
k
-0.16590
0.75040
1.33515
1.87711
2.55466
3.04801
3.52990
4.15415
4.61917
Caudal
768.69792
1,630.53931
2,180.53263
2,690.28557
3,327.56657
3,791.59209
4,244.84365
4,831.98628
5,269.37061
EXPEDIENTE TECNICO: "MEJORAMIENTO DEL SISTEMA DE EVACUACIN, TRATAMIENTO Y DISPOSICION FINAL DE LAS AGUAS SERVIDAS DE LAS CIUDADES DE SULLANA Y BELLAVISTA - PROVINCIA DE SULLANA - PIURA"
____________________________________________________________________________________
P
0.50000
0.20000
0.10000
0.05000
0.02000
0.01000
0.00500
0.00200
0.00100
w
1.17741
1.79412
2.14597
2.44775
2.79715
3.03485
3.25525
3.52551
3.71692
Z
0.00000
0.84146
1.28173
1.64521
2.05419
2.32679
2.57624
2.87851
3.09052
k
0.07408
0.85487
1.22381
1.50880
1.80896
1.99733
2.16174
2.35100
2.47740
Caudal
472.45032
1,523.52616
2,649.25549
4,061.82803
6,370.92737
8,450.49211
10,813.17434
14,361.94227
17,359.25559
24
acumulada
EXPEDIENTE TECNICO: "MEJORAMIENTO DEL SISTEMA DE EVACUACIN, TRATAMIENTO Y DISPOSICION FINAL DE LAS AGUAS SERVIDAS DE LAS CIUDADES DE SULLANA Y BELLAVISTA - PROVINCIA DE SULLANA - PIURA"
____________________________________________________________________________________
II.2.8 Prueba de Bondad
Distribucin Normal
W
k
P
1.794
1
0.200
1.354
2
0.400
1.011
3
0.600
0.668
4
0.800
5
1.000
MX D
Prueba de Bondad y Ajuste
Normal
W
k
P
1.794
1
0.200
1.354
2
0.400
1.011
3
0.600
0.668
4
0.800
5
1.000
MX D
Ajuste
Z
-0.841
-0.253
0.252
0.829
LC-Superior
133.2891
686.8346
1,161.8133
1,704.2148
3,025.0000
Z
-0.841
-0.253
0.252
0.829
LC-Superior
119.7030
289.3241
616.9695
1,464.9636
3,025.0000
N Datos
9
9
8
4
7
Fre-Rango
0.2432
0.2432
0.2162
0.1081
0.1892
N Datos
9
4
5
12
7
Fre-Rango
0.2432
0.1081
0.1351
0.3243
0.1892
Fre-Acumu
0.2432
0.2432
0.2162
0.1081
0.1892
k
1
2
3
4
5
P
0.200
0.400
0.600
0.800
1.000
MX D
t
1
2
3
5
2
1
1
1
Ym
-0.4759
0.0874
0.6717
1.4999
0.0432
0.2919
0.4649
0.4757
0.8108
0.8108
y
ajuste
para
Valor Extremo Tipo I
k
-0.8852
-0.3952
0.1131
0.8335
LC-Superior
92.1338
553.0222
1,031.0914
1,708.7219
0.0000
0.0000
0.0000
0.0000
N Datos
9
9
5
7
Fre-Rango
0.2432
0.0000
0.2432
0.0000
0.1351
0.0000
0.1892
0.0000
Fre-Acumu
0.2432
0.4865
0.6216
0.8108
0,0432
0,0865
0,0216
0,0108
0.229
3025
0.0000
1.0000
0.1892
2.2.10 Prueba de bondad y ajuste para la distribucin Pearson Tipo III o Gamma 3 Parmetros
25
la
0.0432
0.1568
0.3838
0.6919
0.8108
0.8108
para la Distribucin Log-
Fre-Acumu
0.2432
0.1081
0.1351
0.3243
0.1892
para
0.0865
la
EXPEDIENTE TECNICO: "MEJORAMIENTO DEL SISTEMA DE EVACUACIN, TRATAMIENTO Y DISPOSICION FINAL DE LAS AGUAS SERVIDAS DE LAS CIUDADES DE SULLANA Y BELLAVISTA - PROVINCIA DE SULLANA - PIURA"
____________________________________________________________________________________
k P
1 0.200
2 0.400
3 0.600
4 0.800
5 1.000
MX D
2.2.11
W
1.794
1.354
1.011
0.668
Z
-0.841
-0.253
0.252
0.829
kT
-0.8472
-0.3938
0.0823
0.7346
LC-Superior
127.8855
554.3347
1,002.1867
1,615.7015
0
N Datos
9
9
5
7
0
Fre-Rango
0.2432
0.4865
0.2432
0.6216
0.1351
0.1892
0.0000
Fre-Acumu
0.2432
0.0865
0.0216
0.8108
0.8108
0.043243
0,086486
0,021621
0.189189
0.086486
0.0814
W
1.794
1.354
1.011
0.668
Z
-0.841
-0.253
0.252
0.829
kT
-0.8116
-0.3938
0.0823
0.7346
LC-Superior
125.1811
234.2290
478.3402
1,272.1535
3,025
0
N Datos
9
4
3
13
8
26
Fre-Rango
0.2432
0.1081
0.0811
0.3514
0.2712
0.0000
0.0000
0.0000
0.0000
Fre-Acumu
0.2432
0.3729
0.4324
0.7838
0.0000
0.0432
0.0486
0.1676
0.0162
0.0000
0.1676
EXPEDIENTE TECNICO: "MEJORAMIENTO DEL SISTEMA DE EVACUACIN, TRATAMIENTO Y DISPOSICION FINAL DE LAS AGUAS SERVIDAS DE LAS CIUDADES DE SULLANA Y BELLAVISTA - PROVINCIA DE SULLANA - PIURA"
____________________________________________________________________________________
Pearson Tipo III
Empleando la prueba de Smirnov - Kolmogorov para cada una de las metodologas empleadas se determin que la distribucin ajustada
Pearson Tipo III se ajusta ms a la serie de datos analizada.
Niveles de Inundacin del Ro Chira
Los niveles de agua en el ro Chira, en las inmediaciones de la posible ubicacin de la PTAR de Sullana, estn controlados por el remanso
que genera la Presa Sullana, a fin de desarrollar un anlisis de los niveles correspondientes a las mximas avenidas del ro Chira, durante
los eventos extraordinarios. Se ha recogido informacin de los niveles de agua mximos registrados en la presa de Sullana y de los
caudales correspondientes. Estos registros se muestran en los Cuadros 2.13 Y 2.14
Cuadro 2.13: Nivel de agua mximo en la Presa Sullana en m.s.n.m.
Elaborado por: Estudio Mapa de Peligros, Plan de Usos del Suelo ante Desastres y Medidas de Mitigacin de la ciudad de
Sullana.
Ao
1998
1999
2000
2001
2002
2003
2004
2005
27
Ene
38.2
7
36.5
1
35.8
6
36.6
6
36.5
9
36.8
6
36.9
8
37.0
0
Feb
38.5
2
36.9
9
36.5
6
36.8
0
36.6
7
36.9
7
36.9
4
37.0
0
Mar
38.7
7
37.2
2
36.6
3
37.0
1
36.9
0
36.8
9
36.9
5
37.0
0
Abr
39.3
1
36.5
9
36.5
5
36.7
3
38.4
5
36.9
8
36.9
6
36.9
1
May
37.1
2
36.5
9
36.5
6
36.5
5
36.8
2
36.9
4
36.9
6
36.9
1
Jun
36.5
2
36.5
2
37.0
8
36.5
4
36.5
3
36.9
9
36.9
6
36.9
0
Jul
36.5
1
36.5
1
37.1
9
36.5
3
36.8
0
36.9
9
36.9
8
36.7
2
Ago
Sep
36.56 36.5
6
2
36.5
31.40
4
36.7
37.19
3
36.5
36.54
2
36.9
36.83
4
37.0
36.99
0
36.9
36.97
9
36.8
36.74
0
Oct
36.5
5
36.3
2
37.0
7
36.5
8
37.0
1
36.9
7
36.7
9
36.9
1
Nov
36.6
7
35.3
5
36.5
8
36.6
1
36.9
4
36.9
8
36.9
4
37.0
0
Dic
36.4
3
35.9
3
36.5
8
36.3
7
36.9
6
36.9
9
36.9
8
36.9
9
EXPEDIENTE TECNICO: "MEJORAMIENTO DEL SISTEMA DE EVACUACIN, TRATAMIENTO Y DISPOSICION FINAL DE LAS AGUAS SERVIDAS DE LAS CIUDADES DE SULLANA Y BELLAVISTA - PROVINCIA DE SULLANA - PIURA"
____________________________________________________________________________________
Ao
2006
2007
2008
2009
Ene
36.9
9
37.2
8
36.9
2
36.9
4
Feb
37.0
0
37.1
6
37.4
1
36.7
5
Mar
36.6
1
37.0
2
37.1
1
36.9
9
Abr
36.7
1
37.0
3
38.0
0
36.9
9
May
36.9
3
36.9
6
36.9
7
36.9
1
Jun
36.9
6
36.9
8
36.9
6
36.9
6
Jul
37.0
0
36.9
3
36.9
2
36.7
9
Ago
36.97
36.94
36.65
36.95
Sep
37.0
0
36.8
3
36.8
7
36.9
6
Oct
37.0
1
36.9
3
36.9
7
36.9
9
Nov
36.8
3
36.9
6
37.0
0
Dic
37.0
0
36.7
2
36.9
9
Ene
Feb
Mar
Abr
May
Jun
Jul
Ago
Sep
Oct
Nov
Dic
2004
40.0
25.0
29.0
29.0
31.0
20.0
34.0
21.0
20.0
15.0
19.0
21.0
2005
250.0
30.0
498.0
321.0
51.0
44.0
30.0
35.0
27.0
20.0
25.0
16.0
2006
28.0
710.0
830.0
815.0
100.0
45.0
45.0
45.0
50.0
45.0
45.0
64.0
2007
54.1
32.6
27.6
203.8
50.3
186.3
35.0
15.0
15.0
10.0
10.0
12.5
2008
36.9
1896.4
1995.8
2577.8
632.3
219.9
124.4
34.6
18.6
13.0
20.4
24.6
2009
630.5
841.2
1448.0
694.5
487.3
72.9
180.1
154.0
11.9
12.3
Elaborado por: Estudio Mapa de Peligros, Plan de Usos del Suelo ante Desastres y Medidas de Mitigacin de la ciudad de
Sullana.
Sobre los Cuadros 4.1.4.15 y 4.1.4.16 se ha confeccionado el grfico Niveles de agua vs. Caudal Vertido, para observar la capacidad de
evacuacin de la presa y para ver la curva de gasto correspondiente, as se obtiene el Grfico 2.1.4.4.
Grfico 2.1.4.4: Nivel del Agua Vs Caudal
28
EXPEDIENTE TECNICO: "MEJORAMIENTO DEL SISTEMA DE EVACUACIN, TRATAMIENTO Y DISPOSICION FINAL DE LAS AGUAS SERVIDAS DE LAS CIUDADES DE SULLANA Y BELLAVISTA - PROVINCIA DE SULLANA - PIURA"
____________________________________________________________________________________
Considerando el caudal de mxima avenida para un perodo de retorno de 100 aos, de 4,684m 3/s, el mismo que fue estimado en el
captulo de Hidrologa, se tiene un nivel de agua en la presa Derivadora de Sullana, aproximadamente igual a 39.0msnm. En el siguiente
cuadro se establece en forma aproximada los niveles de agua alcanzados en el ro Chira para diferentes avenidas extraordinarias (ver
Cuadro 2.1.4-17).
29
de
Caudal
(m3/s)
Nivel de Agua
(m.s.n.m.)
EXPEDIENTE TECNICO: "MEJORAMIENTO DEL SISTEMA DE EVACUACIN, TRATAMIENTO Y DISPOSICION FINAL DE LAS AGUAS SERVIDAS DE LAS CIUDADES DE SULLANA Y BELLAVISTA - PROVINCIA DE SULLANA - PIURA"
____________________________________________________________________________________
10
25
50
100
2,598
3,440
4,064
4,684
37.8
38.4
38.8
39.0
De acuerdo a lo descrito, se tiene que los niveles de agua en el ro Chira alcanzan a la cota 39.0msnm, por otro lado considerando que los
niveles topogrficos de la posible ubicacin de la PTAR se encuentran en la cota 38msnm.; la posibilidad de inundacin de la ciudad por
desborde del ro Chira es mnima.
Fotografa 01. Se observa al fondo la terraza donde se ubicar la posible PTAR, muy por encima de los niveles de agua en el ro Chira.
30
EXPEDIENTE TECNICO: "MEJORAMIENTO DEL SISTEMA DE EVACUACIN, TRATAMIENTO Y DISPOSICION FINAL DE LAS AGUAS SERVIDAS DE LAS CIUDADES DE SULLANA Y BELLAVISTA - PROVINCIA DE SULLANA - PIURA"
____________________________________________________________________________________
Log Normal
2
5
10
20
50
100
200
500
1,000
37.57
93.44
150.52
223.11
347.43
466.73
611.48
848.28
1,067.21
42.40
125.20
180.01
232.60
300.66
351.66
402.48
469.52
520.19
Pearson
Tipo
III o Gamma 3
Parmetros
46.69
109.07
152.65
195.01
250.14
291.56
332.93
387.69
429.25
Log-Pearson
Tipo III
35.68
91.71
154.88
242.55
408.94
585.35
818.82
1,241.73
1,673.56
31
0.20
0.70
0.20
0.10
EXPEDIENTE TECNICO: "MEJORAMIENTO DEL SISTEMA DE EVACUACIN, TRATAMIENTO Y DISPOSICION FINAL DE LAS AGUAS SERVIDAS DE LAS CIUDADES DE SULLANA Y BELLAVISTA - PROVINCIA DE SULLANA - PIURA"
____________________________________________________________________________________
Empleando la prueba de Smirnov-Kolmogorov para cada una de las metodologas empleadas se determin que la distribucin ajustada
Log-Pearson Tipo III se ajusta ms a la serie de datos analizada.
I=P/t
I = K / tm (K y m son factores caractersticos de la Zona)
Ln (KT) = 3.1382 Ln (Pmx. 24) 2.1382 Ln (Pmx. mes), donde T es el periodo de retorno
m = Ln (30 * P24/Pmes)/Ln 30
En el Cuadro 2.1.4.19, se muestra los valores de las intensidades de la precipitacin para diferentes tiempos de duracin y proyectados
para distintos periodos de retorno.
Cuadro 2.1.4.19: Intensidades mximas (Estacin Mallares)
32
EXPEDIENTE TECNICO: "MEJORAMIENTO DEL SISTEMA DE EVACUACIN, TRATAMIENTO Y DISPOSICION FINAL DE LAS AGUAS SERVIDAS DE LAS CIUDADES DE SULLANA Y BELLAVISTA - PROVINCIA DE SULLANA - PIURA"
____________________________________________________________________________________
Periodo Intensidad Mxima (mm/hora)
Duracin (minutos)
de
Retorno 5
10
20
30
2
5
10
20
50
100
25.88
76.29
141.23
239.56
441.94
670.73
19.37
57.10
105.70
179.29
330.77
502.00
13.51
39.82
73.71
125.03
230.67
350.08
33
10.72
31.59
58.47
99.17
182.96
277.68
60
7.04
20.74
38.39
65.11
120.12
182.30
90
5.44
16.03
29.68
50.35
92.88
140.97
120
4.52
13.31
24.63
41.79
77.09
117.00
EXPEDIENTE TECNICO: "MEJORAMIENTO DEL SISTEMA DE EVACUACIN, TRATAMIENTO Y DISPOSICION FINAL DE LAS AGUAS SERVIDAS DE LAS CIUDADES DE SULLANA Y BELLAVISTA - PROVINCIA DE SULLANA - PIURA"
____________________________________________________________________________________
Tiempo de Concentracin
El tiempo de concentracin "Tc", es el tiempo que demora el agua en su viaje desde el punto ms distante de una cuenca hasta el punto
de inters. Se ha determinado segn el mtodo del Kirpich, que considera como caractersticas fsicas principales de las microcuencas a la
longitud y pendiente del curso principal. Utilizando el concepto de tiempo de retraso como un ndice del tiempo de concentracin de la
escorrenta de las subcuenca, se ha obtenido el tiempo de concentracin.
La frmula emprica que estima el tiempo de concentracin (Tc) es la siguiente:
34
EXPEDIENTE TECNICO: "MEJORAMIENTO DEL SISTEMA DE EVACUACIN, TRATAMIENTO Y DISPOSICION FINAL DE LAS AGUAS SERVIDAS DE LAS CIUDADES DE SULLANA Y BELLAVISTA - PROVINCIA DE SULLANA - PIURA"
____________________________________________________________________________________
Dnde:
Tc
Diferencia de elevacin entre los puntos extremos del cauce principal (m).
Unidad
Cuenca Baja
Chira
rea
Ha
Longitud
de M
curso
Cota ms Alta
(msnm)
Cota ms Baja (msnm)
121.33
TConcentracin
8.72
Horas
36,296
200
50
35
EXPEDIENTE TECNICO: "MEJORAMIENTO DEL SISTEMA DE EVACUACIN, TRATAMIENTO Y DISPOSICION FINAL DE LAS AGUAS SERVIDAS DE LAS CIUDADES DE SULLANA Y BELLAVISTA - PROVINCIA DE SULLANA - PIURA"
____________________________________________________________________________________
El agua para consumo de la poblacin de los diferentes centros poblados encontrados dentro del distrito de Sullana procede del mismo ro
Chira, la cual es bombeada por una tubera para distribuirlas a los diferentes centros poblados.
El uso del agua cerca de la zona dentro proyecto es agrcola, para lo cual en tiempos anteriores se tom en cuenta las pocas de estiaje
que disminua en algunos meses hasta un 98% (Informacin obtenida del proyecto Chira- Piura). El agua para la gran parte del rea
irrigable se efecta por bombeo.
III. Conclusiones
-
Despus del estudio realizado se obtiene que la posibilidad de inundacin del rea donde se ubica la PTAR por desborde del ro Chira,
es mnima. Por tanto se acepta la ubicacin de la PTAR.
Se ingres la carta N 008-2015-CPTARMW, a la Municipalidad Provincial de Sullana, solicitando informacin sobre el estado del
estudio hidrogeolgico a nivel de factibilidad.
El clculo de mximas avenidas se realizar mediante el mtodo estadstico, empleando el registro de descargas de la estacin
Puente Sullana. El registro de descargas mximas instantneas fue obtenido de la oficina de Hidrometeorologa del Proyecto Especial
Chira Piura - PECHP.
36