4.02.06 COLUMNA RECTANGULAR SECCION 0.40x0.60 m CONCRETO f'c= 28 MPa m3 6.28 6.28 696,427.00 4,372,447.28
4.02.07 COLUMNA RECTANGULAR SECCION 0.85x0.70 m CONCRETO f'c= 28 MPa m3 40.61 40.61 696,427.00 28,281,029.94
4.02.08 COLUMNA REDONDA D. 0.75 m CONCRETO f'c= 28 MPa m3 57.98 57.98 696,427.00 40,375,799.68
0
4.03 LOSA ENTREPISO N+1.00 m 465,539,930.48
4.03.01 Concreto losa maciza e=0.35 m, f'c=21 Mpa m3 6.65 6.65 223,479.00 1,486,135.35
4.03.02 Concreto losa maciza e=0.30 m, f'c=21 Mpa m3 7.22 7.22 230,181.00 1,661,446.46
4.03.03 Concreto losa maciza e=0.15 m, f'c=21 Mpa m3 8.29 8.29 111,960.00 927,986.06
4.03.04 Concreto losa maciza e=0.10 m, f'c=21 Mpa m3 4.38 4.38 109,640.00 479,839.46
4.03.05 Concreto vigas aereas 50x75 m, f'c=21 Mpa m3 12.85 12.85 667,402.00 8,575,698.57
4.03.06 Concreto vigas aereas 16x40 m, f'c=21 Mpa m3 0.78 0.78 877,402.00 681,706.26
4.03.07 Concreto vigas aereas 30x60 m, f'c=21 Mpa m3 6.01 6.01 682,402.00 4,101,986.66
4.03.08 Concreto vigas aereas 30x40 m, f'c=21 Mpa m3 8.68 8.68 682,402.00 5,921,338.63
4.03.09 Concreto vigas aereas 25x50 m, f'c=21 Mpa m3 0.46 0.46 682,402.00 315,610.93
4.03.10 Concreto vigas aereas 25x60 m, f'c=21 Mpa m3 14.18 14.18 682,402.00 9,677,142.76
4.03.11 Concreto vigas aereas 50x60 m, f'c=21 Mpa m3 6.71 6.71 682,402.00 4,575,505.41
4.03.12 Concreto vigas aereas 55x60 m, f'c=21 Mpa m3 82.05 82.05 682,402.00 55,994,154.91
4.03.13 Concreto vigas aereas 65x75 m, f'c=21 Mpa m3 10.27 10.27 682,402.00 7,007,714.09
CALCULO DE CANTIDADES DE OBRA NUEVA SEDE CAMARA DE COMERCIO DE PALMIRA 8 de 100
1.01 DEMOLICIONES
MUROS EN LADRILLO e= 0.30 m
LARGO 58.24 m
ALTURA 4.00 m
AREA 232.96 m2
CZ2
CANTIDAD 2.00
con maquina hasta -2.80m, manual
ESPESOR DE EXCAVACION hasta -3.75 0.95 m2
area de cabezal 4.30 x 1.30 5.59 m2
VOLUMEN DE EXCAVACION A MANO 10.62 m3
CZ3
CALCULO DE CANTIDADES DE OBRA NUEVA SEDE CAMARA DE COMERCIO DE PALMIRA 16 de 100
CZ4
CANTIDAD 2.00
con maquina hasta -2.80m, manual
ESPESOR DE EXCAVACION hasta -4.50m 1.70 m2
area de cabezal 1.30x3.80 4.94 m2
VOLUMEN DE EXCAVACION A MANO 16.80 m3
CZ5
CANTIDAD 6.00
con maquina hasta -2.80m, manual
ESPESOR DE EXCAVACION hasta -4.05m 1.25 m2
area de cabezal 3.10x3.10 9.61 m2
VOLUMEN DE EXCAVACION A MANO 72.08 m3
CZ6
CANTIDAD 1.00
con maquina hasta -2.80m, manual
ESPESOR DE EXCAVACION hasta -3.75m 0.95 m2
area de cabezal 3.10x1.10 3.41 m2
VOLUMEN DE EXCAVACION A MANO 3.24 m3
CZ7
CANTIDAD 1.00
con maquina hasta -2.80m, manual
ESPESOR DE EXCAVACION hasta -4.55m 1.75 m2
area de cabezal 3.80x1.30 4.94 m2
VOLUMEN DE EXCAVACION A MANO 8.65 m3
CZ8
CALCULO DE CANTIDADES DE OBRA NUEVA SEDE CAMARA DE COMERCIO DE PALMIRA 17 de 100
VIGAS DE CIMENTACION
VIGA EJE B 60x60
CANTIDAD 1
LONGITUD 42.59 m
ANCHO DE EXCAVACION 0.60 m
con maquina hasta -2.80m, manual
ESPESOR DE EXCAVACION hasta -3.40 m 0.60 m
VOLUMEN DE EXCAVACION VIGA EJE B 60x60 15.33 m3
CORRESPONDE A LA ZONA DE
VIGA VC 20-1 ASCENSORES
CANTIDAD
LONGITUD m
ANCHO DE EXCAVACION m
con maquina hasta -2.80m, manual
ESPESOR DE EXCAVACION hasta -3.30 m m
VOLUMEN DE EXCAVACION VIGA VC 20-1 m3
2.02 PILOTES
CONCRETO
PILOTE DIAMETRO 60 cm REFUERZO EN ESPIRAL REFUERZO LONGTUDINAL
DIAMETRO 0.6 m RADIO 0.22 REFERENCIA CANTIDAD DIAMETRO LONGITUD PESO TOTAL/PILOTE TOTAL
CANTIDAD 17 un PASO 0.072 7#691.5 7 6.00 9.15 2.25 144.11 2,449.91
COTA SUPERIOR 2.75 CANTIDAD 8 ESPIRAL 1 3.00 67.13 0.56 37.76 641.95
COTA INFERIOR 11.9 L 11.07 m 181.87 3,091.86 kg 70.30 kg/m3
LONGITUD 9.15 m PASO 0.077
VOLUMEN DE CONCRETO 43.98 m3 CANTIDAD 16
LONGITUD TOTAL 155.55 m L 22.15 m
Descabece de pilote H = 0.50 m 2.88 m3 PASO 0.292
CANTIDAD 24
L 33.91 m
2.02 PILOTES
CANTIDAD 18
L 59.20 m
CABEZALES CZ5 EN ZONA DE TANQUES REFERENCIA CANTIDAD DIAMETRO LONGITUD PESO TOTAL DENSIDAD
CANTIDAD 3.00 64#837.5 64 8 3.75 4.00 960 2,880.00
ESPESOR DE CABEZAL 6.00-4.70 1.30 96#432.5 96 4 3.25 1.00 312 936.00
AREA DE CABEZAL 3.10 X 3.10 m 9.61 196#414 196 4 1.4 1.00 274.4 823.20
CALCULO DE CANTIDADES DE OBRA NUEVA SEDE CAMARA DE COMERCIO DE PALMIRA 27 de 100
CZ6
CANTIDAD 1.00
ESPESOR DE CABEZAL 3.75-2.75 1.00 m2
area de cabezal 3.10 X 1.10 m 3.41 m2
VOLUMEN CZ6 3.41 m3
2.04 BARRETES
CONCRETO REFUERZO
BARRETE EJE 1-E REFUERZO LONGTUDINAL
SECCION 4.60x0.60+4.00x0.60 m REFERENCIA CANTIDAD DIAMETRO LONGITUD PESO TOTAL/PILOTE TOTAL
CANTIDAD 1 un 52#870 52 8 7 4.00 1,456.00 1,456.00
COTA SUPERIOR 5.05 1008#406.4 1008 4 0.64 1.00 645.12 645.12
COTA INFERIOR 11.90 192#450.8 192 4 5.08 1.00 975.36 975.36
LONGITUD 6.85 m 4#839.6 4 8 3.96 4.00 63.36 63.36
VOLUMEN DE CONCRETO 35.35 m3 3,139.84 3,139.84 kg 88.83 kg/m3
LONGITUD TOTAL 6.85 m
DESCABECE DE BARRETE 2.58 m3
REFUERZO LONGTUDINAL
BARRETE EJE 3B, 4B, 6B y 3A REFERENCIA CANTIDAD DIAMETRO LONGITUD PESO TOTAL/PILOTE TOTAL
SECCION 4.60x0.60 m 28#893 28 8 9.3 4.00 1,041.60 4,166.40
CANTIDAD 4 un 636#406.4 636 4 0.64 1.00 407.04 1,628.16
COTA SUPERIOR 2.75 106#450.8 106 4 5.08 1.00 538.48 2,153.92
COTA INFERIOR 11.90 1,987.12 7,948.48 kg 78.69 kg/m3
LONGITUD 9.15 m
VOLUMEN DE CONCRETO 101.02 m3
LONGITUD TOTAL 36.60 m
DESCABECE DE BARRETE 5.52 m3 REFUERZO LONGTUDINAL
REFERENCIA CANTIDAD DIAMETRO LONGITUD PESO TOTAL/PILOTE TOTAL
BARRETE EJE 6A y 6D 28#893 28 8 9.3 4.00 1,041.60 2,083.20
SECCION 4.00x0.60 m 636#406.4 636 4 0.64 1.00 407.04 814.08
CANTIDAD 2 un 106#450.8 106 4 5.08 1.00 538.48 1,076.96
COTA SUPERIOR 2.75 1,987.12 3,974.24 kg 90.49 kg/m3
COTA INFERIOR 11.90
LONGITUD 9.15 m
VOLUMEN DE CONCRETO 43.92 m3
LONGITUD TOTAL 18.30 m TOTAL REFUERZO 15,062.56 kg
DESCABECE DE BARRETE 2.76 m3
CABEZAL BARRETE A-3 REFERENCIA CANTIDAD DIAMETRO LONGITUD PESO TOTAL DENSIDAD
CANTIDAD 1.00 8#655.5 8 6 5.55 2.25 99.90 99.90
ESPESOR DE CABEZAL 1.25 m2 4#555.5 4 5 5.55 1.56 34.69 34.69
area de cabezal 4.90x0.75 3.68 m2 16#435E 16 4 3.50 1.00 56.00 56.00
VOLUMEN CABEZAL BARRETE A-3 4.59 m3 32#309E 32 3 0.90 0.56 16.20 16.20
32#804 32 8 0.40 4.00 51.20 51.20
257.99 257.99 kg 56.16 kg/m3
CABEZAL BARRETE A-6 REFERENCIA CANTIDAD DIAMETRO LONGITUD PESO TOTAL DENSIDAD
CANTIDAD 1.00 8#649.5 8 6 4.95 2.25 89.10 89.10
ESPESOR DE CABEZAL 1.25 m2 4#549.5 4 5 4.95 1.56 30.94 30.94
area de cabezal 4.30x0.75 3.23 m2 14#435E 14 4 3.50 1.00 49.00 49.00
VOLUMEN CABEZAL BARRETE A-6 4.03 m3 28#309E 28 3 0.90 0.56 14.18 14.18
28#804 28 8 0.40 4.00 44.80 44.80
228.01 228.01 kg 56.56 kg/m3
CABEZAL BARRETE E-6 REFERENCIA CANTIDAD DIAMETRO LONGITUD PESO TOTAL DENSIDAD
CANTIDAD 1.00 4#849.5 4 8 4.95 4.00 79.20 79.20
ESPESOR DE CABEZAL 1.25 m2 6#449.5 6 4 4.95 1.00 29.70 29.70
area de cabezal 4.30x0.9 3.87 m2 14#438E 14 4 3.80 1.00 53.20 53.20
VOLUMEN CABEZAL BARRETE E-6 4.84 m3 28#310.5E 28 3 1.05 0.56 16.54 16.54
178.64 178.64 kg 36.93 kg/m3
CABEZAL BARRETE B-3, B-4, B-6 REFERENCIA CANTIDAD DIAMETRO LONGITUD PESO TOTAL DENSIDAD
CANTIDAD 3.00 4#855.5 4 8 5.55 4.00 88.80 266.40
ESPESOR DE CABEZAL 1.25 m2 6#455.5 6 4 5.55 1.00 33.30 99.90
area de cabezal 4.90x0.9 4.41 m2 16#438E 16 4 3.80 1.00 60.80 182.40
VOLUMEN CABEZAL BARRETE B-3, B-4, B-6 16.54 m3 32#310.5E 32 3 1.05 0.56 18.90 56.70
201.80 605.40 kg 36.61 kg/m3
VOLUMEN DE CONCRETO 39.26 m3 TOTAL REFUERZO 2,095.24 kg
RAMPA DE ACCESO
PERFILES METALICOS
TIPO ESPECIFICACION CANTIDAD PESO kg/m LONGITUD PESO TOTAL
VM12 IPE500 6 90.70 7.55 4,108.71
Area de rampa
En metal deck 7.55 m 10.25 m 77.39 m2
Concreto cimentacion y losa maciza 7.55 m 0.44 m2 3.32 m3
Malla electrosoldada 6.0mm cada 15
Cantidad 7 un 98.7 m2
Peso unitario 42.20 kg
Peso total 295.40 kg
Metaldeck 2", calibre 22 (0.75 mm), con conector de cortante D. 1" en cada
valle cada 30 cm 77.39 m2
Concreto de recubrimiento metaldeck f'c=21 Mpa 7.12 m3
4.02 COLUMNAS
COLUMNA C-1
CANTIDAD 2
CONCRETO REFUERZO
SECCION RECTANGULAR 0.85x0.70 m 0.85 x 0.70 m REFERENCIA CANTIDAD DIAMETRO LONGITUD PESO TOTAL/COLUMNA TOTAL
COTA SUPERIOR 9.40 COLUMNA C-1
COTA INFERIOR - 4.25 8#635 8 6 3.50 2.25 63.00 126.00
ALTURA 13.65 2#735 2 7 3.50 3.06 21.44 42.88
VOLUMEN 8.12 m3 8#674 8 6 7.40 2.25 133.20 266.40
SECCION 0.60 x 0.60 m 2#774 2 7 7.40 3.06 45.33 90.65
COTA SUPERIOR 18.51 8#695 8 6 9.50 2.25 171.00 342.00
COTA INFERIOR 9.40 2#795 2 7 9.50 3.06 58.19 116.38
ALTURA 9.11 4#580 4 5 8.00 1.56 50.00 100.00
VOLUMEN 3.28 m3 8#680 8 6 8.00 2.25 144.00 288.00
2#780 2 7 8.00 3.06 49.00 98.00
VOLUMEN DE CONCRETO COLUMNA C-1 22.80 m3 8#637 8 6 3.70 2.25 66.60 133.20
2#737 2 7 3.70 3.06 22.66 45.33
10#580 10 5 8.00 1.56 125.00 250.00
10#540 10 5 4.00 1.56 62.50 125.00
10#582.8 10 5 8.28 1.56 129.38 258.75
10#543.8 10 5 4.38 1.56 68.44 136.88
204#325E 204 3 2.50 0.56 286.88 573.75
204#308.2E 204 3 0.82 0.56 94.10 188.19
306#309.7E 306 3 0.97 0.56 166.96 333.92
144#319.2E 144 3 1.92 0.56 155.52 311.04
144#307.2E 144 3 0.72 0.56 58.32 116.64
1,971.50 3,942.99 kg 172.92 kg/m3
4.02 COLUMNAS
SECCION CUADRADA 0.60x0.60 m 0.60 x 0.60 m 10#5105 10 5 10.50 1.56 164.06 164.06
COTA SUPERIOR 13.35 10#550 10 5 5.00 1.56 78.13 78.13
COTA INFERIOR - 4.25 10#5100 10 5 10.00 1.56 156.25 156.25
ALTURA 17.60 10#578 10 5 7.80 1.56 121.88 121.88
VOLUMEN 6.34 m3 10#537 10 5 3.70 1.56 57.81 57.81
m 260#319.2E 260 3 1.92 0.56 280.80 280.80
VOLUMEN DE CONCRETO COLUMNA C-3 6.34 m3 260#307.2E 260 3 0.72 0.56 105.30 105.30
1,135.23 1,135.23 kg 179.17 kg/m3
4.02 COLUMNAS
VOLUMEN 7.09 m3 302#319.2E 302 3 1.92 0.56 326.16 652.32
302#307.2E 302 3 0.72 0.56 122.31 244.62
VOLUMEN DE CONCRETO COLUMNA C-5 14.18 m3 1,162.53 2,325.07 kg 164.00 kg/m3
4.02 COLUMNAS
4#662.4 4 6 6.24 2.25 56.16 56.16
VOLUMEN DE CONCRETO SECCION REDONDA D. 0.75 m 2.32 m3 ESP 3/8" 40P 1 3 84.36 0.56 47.45 47.45
202#320.4E 202 3 2.04 0.56 231.80 231.80
SECCION CUADRADA 0.60 x 0.60 m 0.60 x 0.60 202#307.2E 202 3 0.72 0.56 81.81 81.81
COTA SUPERIOR 14.34 1,247.01 1,247.01 kg 175.10 kg/m3
COTA INFERIOR 1.00
ALTURA 13.34
VOLUMEN 4.80 m3
4.02 COLUMNAS
COLUMNA C-12 REFERENCIA CANTIDAD DIAMETRO LONGITUD PESO TOTAL/COLUMNA TOTAL
CANTIDAD 1 COLUMNA C-12
CONCRETO 16#659 16 6 5.90 2.25 212.40 212.40
SECCION REDONDA D. 0.75 m 0.75 m 16#655 16 6 5.50 2.25 198.00 198.00
COTA SUPERIOR 4.95 16#639 16 6 3.90 2.25 140.40 140.40
COTA INFERIOR 1.00 16#784 16 7 8.40 3.06 411.60 411.60
ALTURA 3.95 -
VOLUMEN 1.75 m3 -
ESP 3/8" 45P 1 3 94.90 0.56 53.38 53.38
SECCION REDONDA D. 0.75 m 0.75 m ESP 3/8" 63P 1 3 132.86 0.56 74.73 74.73
COTA SUPERIOR 14.34 158#320.4E 158 3 2.04 0.56 181.31 181.31
COTA INFERIOR 9.40 158#307.2E 158 3 0.72 0.56 63.99 63.99
ALTURA 4.94 1,335.81 1,335.81 kg 180.04 kg/m3
VOLUMEN 2.18 m3
4.02 COLUMNAS
ALTURA 8.40
VOLUMEN 3.02 m3
4.02 COLUMNAS
VOLUMEN DE CONCRETO COLUMNA C-17 3.14 m3
COLUMNAS ZONA ARCHIVO DESDE NIVEL +1.00 AL NIVEL +4.95 m REFERENCIA CANTIDAD DIAMETRO LONGITUD PESO TOTAL/COLUMNA TOTAL
COLUMNA ARCHIVO 40x40 CA1 COLUMNA ARCHIVO 40x40 CA1
CANTIDAD 3 4#546.5 4 5 4.65 1.56 29.06 87.19
CONCRETO 19#314.8E 19 3 1.48 0.56 15.82 47.45
SECCION CUADRADA 0.40x0.40 m 0.40 x 0.40 m 44.88 134.64 kg 72.86 kg/m3
COTA SUPERIOR 4.85
COTA INFERIOR 1.00
ALTURA 3.85
VOLUMEN 1.85 m3
COLUMNA ARCHIVO 16x40 CA2 REFERENCIA CANTIDAD DIAMETRO LONGITUD PESO TOTAL/COLUMNA TOTAL
CANTIDAD 11 COLUMNA ARCHIVO 16x40 CA2
CONCRETO 4#446.5 4 4 4.65 1.00 18.60 204.60
CALCULO DE CANTIDADES DE OBRA NUEVA SEDE CAMARA DE COMERCIO DE PALMIRA 47 de 100
4.02 COLUMNAS
SECCION CUADRADA 0.16x0.40 m 0.16 x 0.40 m 25#210E 25 2 1.00 0.25 6.25 68.75
COTA SUPERIOR 4.85 24.85 273.35 kg 100.85 kg/m3
COTA INFERIOR 1.00
ALTURA 3.85
VOLUMEN 2.71 m3
COLUMNA ARCHIVO 16x40 CA4 REFERENCIA CANTIDAD DIAMETRO LONGITUD PESO TOTAL/COLUMNA TOTAL
CANTIDAD 10 COLUMNA ARCHIVO 16x40 CA4
CONCRETO 4#451.5 4 4 5.15 1.00 20.60 206.00
SECCION CUADRADA 0.16x0.40 m 0.16 x 0.40 m 29#210E 29 2 1.00 0.25 7.25 72.50
COTA SUPERIOR 9.30 27.85 278.50 kg 100.04 kg/m3
COTA INFERIOR 4.95
ALTURA 4.35
VOLUMEN 2.78 m3
4.02 COLUMNAS
Acero de refuerzo fy= 420 MPa para COLUMNAS kg 1,207.54 - 1,207.54
COLUMNA C-5 - -
4.02 COLUMNAS
COLUMNA RECTANGULAR SECCION 0.40x0.60 m CONCRETO f'c= 28
MPa m3 3.14 3.14 -
Acero de refuerzo fy= 420 MPa para COLUMNAS kg 517.14 - 517.14
COLUMNA C-18 - -
COLUMNA RECTANGULAR SECCION 0.40x0.60 m CONCRETO f'c= 28
MPa m3 3.14 3.14 -
Acero de refuerzo fy= 420 MPa para COLUMNAS kg 576.72 - 576.72
COLUMNA C-19 - -
LOSA MACIZA EJE E ENTRE 2-3 LOSA MACIZA EJE E ENTRE 2-3
CONCRETO 37#221 10.00 2.00 2.10 0.25 5.25
LOSA MACIZA 3.58 m2 11#379.3 3.00 3.00 7.93 0.56 13.38 18.63 kg
CANTIDAD 1.00 4mm@15 0.40 18.81 7.52 7.52 kg
ESPESOR 0.15 m 26.16
VOLUMEN DE CONCRETO LOSA MACIZA 0.54 m3
LOSA MACIZA EJE C y D ENTRE 3 y 4
LOSA MACIZA EJE C y D ENTRE 3 y 4 37#221 31.00 2.00 2.10 0.25 16.28
CONCRETO 11#379.3 10.00 3.00 7.93 0.56 44.61 60.88 kg
LOSA MACIZA 12.06 m2 4mm@15 1.20 18.81 22.57 22.57 kg
CANTIDAD 1.00 83.45
ESPESOR 0.15 m
VOLUMEN DE CONCRETO LOSA MACIZA 1.81 m3 LOSA MACIZA ZONA ASCENSORES
24#221 24.00 2.00 2.10 0.25 12.60
LOSA MACIZA ZONA ASCENSORES 8#379.3 8.00 3.00 7.93 0.56 35.69 48.29 kg
CONCRETO 4mm@15 1.00 18.81 18.81 18.81 kg
LOSA MACIZA 9.38 m2 67.10
CANTIDAD 1.00
ESPESOR 0.15 m LOSA MACIZA EJES 6 y 7 CON EJE D
VOLUMEN DE CONCRETO LOSA MACIZA 1.41 m3 24#221 114.00 2.00 2.10 0.25 59.85
8#379.3 34.00 3.00 7.93 0.56 151.66 211.51 kg
LOSA MACIZA EJES 6 y 7 CON EJE D 4mm@15 4.50 18.81 84.65 84.65 kg
CONCRETO 296.16
LOSA MACIZA 43.97 m2
CANTIDAD 1.00 LOSA MACIZA EJES 2 y 2' CON EJE B
ESPESOR 0.15 m 24#221 14.00 2.00 2.10 0.25 7.35
VOLUMEN DE CONCRETO LOSA MACIZA 6.60 m3 8#379.3 5.00 3.00 7.93 0.56 22.30 29.65 kg
4mm@15 0.70 18.81 13.17 13.17 kg
LOSA MACIZA EJES 2 y 2' CON EJE B 42.82
CONCRETO
LOSA MACIZA 5.34 m2 V12
CANTIDAD 1.00 1#630 1.00 6.00 3.00 2.25 6.75 6.75
ESPESOR 0.15 m 21#690 21.00 6.00 9.00 2.25 425.25 425.25
VOLUMEN DE CONCRETO LOSA MACIZA 0.80 m3 3#545 3.00 5.00 4.50 1.56 21.09 21.09
2#560 2.00 5.00 6.00 1.56 18.75 18.75
V12 4#681.5 4.00 6.00 8.15 2.25 73.35 73.35
CANTIDAD 1.00 4#635 4.00 6.00 3.50 2.25 31.50 31.50
SECCION 0.55x0.60 m 0.55 x 0.60 m 1#540 1.00 5.00 4.00 1.56 6.25 6.25
LONGITUD 41.18 m 4#688 4.00 6.00 8.80 2.25 79.20 79.20
VOLUMEN 13.59 m3 4#6105 4.00 6.00 10.50 2.25 94.50 94.50
4#660 4.00 6.00 6.00 2.25 54.00 54.00
V13 4#6120 4.00 6.00 12.00 2.25 108.00 108.00
CANTIDAD 1.00 134#211 134.00 2.00 1.10 0.25 36.85 36.85
SECCION 0.50x0.75 m 0.50 x 0.75 m 291#326.8 291.00 3.00 2.68 0.56 438.68 438.68
LONGITUD 13.08 m 1,394.18 1,394.18 kg
CALCULO DE CANTIDADES DE OBRA NUEVA SEDE CAMARA DE COMERCIO DE PALMIRA 59 de 100
V18 V15
CANTIDAD 1.00 1#550 1.00 5.00 5.00 1.56 7.81 7.81
SECCION 0.30x0.60 m 0.30 x 0.60 m 3#887 3.00 8.00 8.70 4.00 104.40 104.40
LONGITUD 7.80 m 3#645 3.00 6.00 4.50 2.25 30.38 30.38
VOLUMEN 1.40 m3 1#760 1.00 7.00 6.00 3.06 18.38 18.38
1#560 1.00 5.00 6.00 1.56 9.38 9.38
VIGA V19 10#845 10.00 8.00 4.50 4.00 180.00 180.00
CANTIDAD 1.00 4#650 4.00 6.00 5.00 2.25 45.00 45.00
CALCULO DE CANTIDADES DE OBRA NUEVA SEDE CAMARA DE COMERCIO DE PALMIRA 60 de 100
VTA29 VTA9
CANTIDAD 1.00 4#633.7 4.00 6.00 3.37 2.25 30.33 60.66
SECCION 0.16x0.60 m 0.16 x 0.60 m 10#315.8E 10.00 3.00 1.58 0.56 8.89 17.78
LONGITUD 2.55 m 39.22 78.44 kg
VOLUMEN 0.24 m3
VTA2
VTA30 2#692.2 2.00 6.00 9.22 2.25 41.49 41.49
CANTIDAD 1.00 1#770 1.00 7.00 7.00 3.06 21.44 21.44
SECCION 0.16x0.60 m 0.16 x 0.60 m 4#792.2 4.00 7.00 9.22 3.06 112.95 112.95
LONGITUD 2.00 m 3#870 3.00 8.00 7.00 4.00 84.00 84.00
VOLUMEN 0.19 m3 45#320.8E 45.00 3.00 2.08 0.56 52.65 52.65
312.52 312.52 kg
VIGA V26
CANTIDAD 1.00 VTA2'
SECCION 0.55x0.75 m 0.55 x 0.75 m 4#527 4.00 5.00 2.70 1.56 16.88 67.50
LONGITUD 8.80 m 8#314.8E 8.00 3.00 1.48 0.56 6.66 26.64
VOLUMEN 3.63 m3 23.54 94.14 kg
SECCION 0.55x0.60 m 0.55 x 0.60 m
LONGITUD 15.20 m VTA3
VOLUMEN 5.02 m3 2#334 2.00 3.00 3.40 0.56 3.83 3.83
2#423.5 2.00 4.00 2.35 1.00 4.70 4.70
VIGA V27 3#534 3.00 5.00 3.40 1.56 15.94 15.94
CANTIDAD 1.00 20#315.8E 20.00 3.00 1.58 0.56 17.78 17.78
SECCION 0.45x0.50 m 0.45 x 0.50 m 42.24 42.24 kg
CALCULO DE CANTIDADES DE OBRA NUEVA SEDE CAMARA DE COMERCIO DE PALMIRA 70 de 100
VTA33 V26
CANTIDAD 2.00 5#850 5.00 8.00 5.00 4.00 100.00 100.00
SECCION 0.16x0.60 m 0.16 x 0.60 m 7#890 7.00 8.00 9.00 4.00 252.00 252.00
LONGITUD 1.75 m 8#660 8.00 6.00 6.00 2.25 108.00 108.00
VOLUMEN 0.34 m3 4#759.2 4.00 7.00 5.92 3.06 72.52 72.52
1#860 1.00 8.00 6.00 4.00 24.00 24.00
losa recubrimiento metal deck 1#630 1.00 6.00 3.00 2.25 6.75 6.75
Area total 1,061.55 m2 4#743.2 4.00 7.00 4.32 3.06 52.92 52.92
Area h= 0.10 m, consumo 0.072 m3/m2 1,061.55 m2 5#859 5.00 8.00 5.90 4.00 118.00 118.00
Area h= 0.15 m, consumo 0.122 m3/m2 0.00 m2 3#790 3.00 7.00 9.00 3.06 82.69 82.69
Volumen de concreto de recubrimiento 76.43 m3 3#7120 3.00 7.00 12.00 3.06 110.25 110.25
124#211 124.00 2.00 1.10 0.25 34.10 34.10
PERFILES METALICOS 50#324.8E 50.00 3.00 2.48 0.56 69.75 69.75
TIPO ESPECIFICACIO CANTIDAD PESO kg/m LONGITUD PESO TOTAL 103#321.8 103.00 3.00 2.18 0.56 126.30 126.30
VM1 IPE330 6.00 49.10 7.43 2188.878 1,157.28 1,157.28 kg
VM2 IPE360 6.00 57.10 8.42 2884.692
VM10 IPE240 3.00 30.70 5.27 485.367 V27
VM12 IPE360 4.00 57.10 7.55 1724.42 4#890 4.00 8.00 9.00 4.00 144.00 144.00
VM17 IPE270 3.00 36.10 6.30 682.29 4#660 4.00 6.00 6.00 2.25 54.00 54.00
VM18 IPE270 12.00 36.10 6.45 2794.14 2#650 2.00 6.00 5.00 2.25 22.50 22.50
VM21 IPE330 23.00 49.10 7.45 8413.285 11#847.2 11.00 8.00 4.72 4.00 207.68 207.68
VM22 IPE140 6.00 12.90 2.75 212.85 4#770 4.00 7.00 7.00 3.06 85.75 85.75
VM23 IPE240 1.00 30.70 2.01 61.707 1#750 1.00 7.00 5.00 3.06 15.31 15.31
VM27 IPE330 1.00 49.10 7.16 351.556 4#843.2 4.00 8.00 4.32 4.00 69.12 69.12
VM28 IPE300 1.00 42.20 6.92 292.024 11#860 11.00 8.00 6.00 4.00 264.00 264.00
VM29 IPE300 1.00 42.20 6.69 282.318 4#640 4.00 6.00 4.00 2.25 36.00 36.00
VM31 IPE400 1.00 66.30 4.14 274.482 2#690 2.00 6.00 9.00 2.25 40.50 40.50
VM34 IPE200 4.00 22.40 4.06 363.776 5#850 5.00 8.00 5.00 4.00 100.00 100.00
VM35 IPE160 1.00 15.80 3.09 48.822 6#790 6.00 7.00 9.00 3.06 165.38 165.38
VM36 IPE140 1.00 12.90 3.00 38.7 3#7120 3.00 7.00 12.00 3.06 110.25 110.25
VM37 IPE180 1.00 18.80 3.78 71.064 124#213.5 124.00 2.00 1.35 0.25 41.85 41.85
VM38 IPE180 1.00 18.80 3.95 74.26 17#324.8E 17.00 3.00 2.48 0.56 23.72 23.72
VM39 IPE120 6.00 10.40 1.64 102.336 49#321.8 49.00 3.00 2.18 0.56 60.09 60.09
VM40 IPE160 4.00 15.80 3.18 200.976 96#321 96.00 3.00 2.10 0.56 113.40 113.40
PESO TOTAL PERFILES METALICOS 21547.943 42#327 42.00 3.00 2.70 0.56 63.79 63.79
CALCULO DE CANTIDADES DE OBRA NUEVA SEDE CAMARA DE COMERCIO DE PALMIRA 72 de 100
LOSA MACIZA EJES 2 y 2' CON EJE B LOSA MACIZA EJES 2 y 2' CON EJE B
CONCRETO 24#221 24.00 2.00 2.10 0.25 12.60 12.29
LOSA MACIZA 9.07 m2 8#379.3 7.00 3.00 7.93 0.56 31.22 43.82 kg 31.03
CANTIDAD 1.00 4mm@15 1.00 18.81 18.81 18.81 kg 26.13
ESPESOR 0.15 m 62.63 69.45 kg/m2
VOLUMEN DE CONCRETO LOSA MACIZA 1.36 m3
V34
V34 1#511.5 1.00 5.00 11.50 1.56 17.97 17.97
CANTIDAD 1.00 1#611.5 1.00 6.00 11.50 2.25 25.88 25.88
SECCION 0.30x0.50 m 0.30 x 0.50 m 1#580 1.00 5.00 8.00 1.56 12.50 12.50
LONGITUD 41.18 m 3#540 3.00 5.00 4.00 1.56 18.75 18.75
VOLUMEN 6.18 m3 3#590 3.00 5.00 9.00 1.56 42.19 42.19
7#690 7.00 6.00 9.00 2.25 141.75 141.75
V35 1#550 1.00 5.00 5.00 1.56 7.81 7.81
CANTIDAD 1.00 1#5100 1.00 5.00 10.00 1.56 15.63 15.63
SECCION 0.30x0.50 m 0.30 x 0.50 m 5#6100 5.00 6.00 10.00 2.25 112.50 112.50
LONGITUD 41.80 m 1#575 1.00 5.00 7.50 1.56 11.72 11.72
VOLUMEN 6.27 m3 1#581 1.00 5.00 8.10 1.56 12.66 12.66
1#681 1.00 6.00 8.10 2.25 18.23 18.23
V36 1#5120 1.00 5.00 12.00 1.56 18.75 18.75
CANTIDAD 1.00 1#6120 1.00 6.00 12.00 2.25 27.00 27.00
SECCION 0.30x0.50 m 0.30 x 0.50 m 1#733 1.00 7.00 3.30 3.06 10.11 10.11
LONGITUD 41.80 m 1#560 1.00 5.00 6.00 1.56 9.38 9.38
VOLUMEN 6.27 m3 1#660 1.00 6.00 6.00 2.25 13.50 13.50
1#5105 1.00 5.00 10.50 1.56 16.41 16.41
V37 1#6105 1.00 6.00 10.50 2.25 23.63 23.63
CANTIDAD 1.00 4#6115 4.00 6.00 11.50 2.25 103.50 103.50
SECCION 0.30x0.50 m 0.30 x 0.50 m 303#314.8 303.00 3.00 1.48 0.56 252.25 252.25
LONGITUD 8.30 m 120#304.2 120.00 3.00 0.42 0.56 28.35 28.35
VOLUMEN 1.25 m3 940.43 940.43 kg
V38 V35
CANTIDAD 1.00 2#545 2.00 5.00 4.50 1.56 14.06 14.06
SECCION 0.30x0.50 m 0.30 x 0.50 m 1#645 1.00 6.00 4.50 2.25 10.13 10.13
LONGITUD 11.80 m 1#520 1.00 5.00 2.00 1.56 3.13 3.13
VOLUMEN 1.77 m3 2#530 2.00 5.00 3.00 1.56 9.38 9.38
3#590 3.00 5.00 9.00 1.56 42.19 42.19
V38' 3#690 3.00 6.00 9.00 2.25 60.75 60.75
CANTIDAD 1.00 1#550 1.00 5.00 5.00 1.56 7.81 7.81
SECCION 0.30x0.50 m 0.30 x 0.50 m 1#5110 1.00 5.00 11.00 1.56 17.19 17.19
LONGITUD 5.80 m 1#575 1.00 5.00 7.50 1.56 11.72 11.72
VOLUMEN 0.87 m3 1#675 1.00 6.00 7.50 2.25 16.88 16.88
1#6110 1.00 6.00 11.00 2.25 24.75 24.75
V39 4#5120 4.00 5.00 12.00 1.56 75.00 75.00
CANTIDAD 1.00 8#6120 8.00 6.00 12.00 2.25 216.00 216.00
SECCION 0.30x0.50 m 0.30 x 0.50 m 286#314.8 286.00 3.00 1.48 0.56 238.10 238.10
LONGITUD 10.85 m 82#304.2 82.00 3.00 0.42 0.56 19.37 19.37
VOLUMEN 1.63 m3 766.44 766.44 kg
SECCION 0.58x0.50 m 0.58 x 0.50 m
LONGITUD 1.00 m V36
CALCULO DE CANTIDADES DE OBRA NUEVA SEDE CAMARA DE COMERCIO DE PALMIRA 76 de 100
V45 V40
CANTIDAD 1.00 4#549 4.00 5.00 4.90 1.56 30.63 30.63
SECCION 0.30x0.50 m 0.30 x 0.50 m 29#314.8 29.00 3.00 1.48 0.56 24.14 24.14
LONGITUD 16.45 m 54.77 54.77 kg
VOLUMEN 2.47 m3
V41
V46 3#780 3.00 7.00 8.00 3.06 73.50 73.50
CALCULO DE CANTIDADES DE OBRA NUEVA SEDE CAMARA DE COMERCIO DE PALMIRA 77 de 100
VTA45 V50
CANTIDAD 1.00 4#684 4.00 6.00 8.40 2.25 75.60 75.60
SECCION 0.16x0.50 m 0.16 x 0.50 m 2#640 2.00 6.00 4.00 2.25 18.00 18.00
LONGITUD 3.00 m 4#674 4.00 6.00 7.40 2.25 66.60 66.60
VOLUMEN 0.24 m3 93#314.8E 93.00 3.00 1.48 0.56 77.42 77.42
237.62 237.62 kg
VTA46
CALCULO DE CANTIDADES DE OBRA NUEVA SEDE CAMARA DE COMERCIO DE PALMIRA 79 de 100
ANGULO 3/4"x1/4"
V38
<3"x1/4" 1.00 14.80 7.25 107.25 107.25
V39
<3"x1/4" 1.00 7.40 7.25 53.63 53.63
V36
<3"x1/4" 1.00 15.60 7.25 113.05 113.05
V44
<3"x1/4" 1.00 7.85 7.25 56.89 56.89
CALCULO DE CANTIDADES DE OBRA NUEVA SEDE CAMARA DE COMERCIO DE PALMIRA 81 de 100
LOSA MACIZA EJES 6 y 7 CON EJE D LOSA MACIZA EJES 6 y 7 CON EJE D
CONCRETO 24#221 114.00 2.00 2.10 0.25 59.85
LOSA MACIZA 43.97 m2 8#379.3 34.00 3.00 7.93 0.56 151.66 211.51 kg
CANTIDAD 1.00 4mm@15 4.50 18.81 84.65 84.65 kg
ESPESOR 0.15 m 296.16 kg/m2
VOLUMEN DE CONCRETO LOSA MACIZA 6.60 m3
V52
VIGA V52 1#545 1.00 5.00 4.50 1.56 7.03 7.03
CANTIDAD 1.00 1#645 1.00 6.00 4.50 2.25 10.13 10.13
SECCION 0.30x0.50 m 0.30 x 0.50 m 1#5120 1.00 5.00 12.00 1.56 18.75 18.75
LONGITUD 14.70 m 1#6120 1.00 6.00 12.00 2.25 27.00 27.00
VOLUMEN 2.21 m3 1#690 1.00 6.00 9.00 2.25 20.25 20.25
1#590 1.00 5.00 9.00 1.56 14.06 14.06
VIGA V53 1#580 1.00 5.00 8.00 1.56 12.50 12.50
CANTIDAD 1.00 1#680 1.00 6.00 8.00 2.25 18.00 18.00
SECCION 0.30x0.45 m 0.30 x 0.45 m 79#313.8E 79.00 3.00 1.38 0.56 61.32 61.32
LONGITUD 41.20 m 189.04 189.04 kg
VOLUMEN 5.56 m3
V53
VIGA V54 3#570 3.00 5.00 7.00 1.56 32.81 32.81
CANTIDAD 1.00 8#6110 8.00 6.00 11.00 2.25 198.00 198.00
SECCION 0.30x0.45 m 0.30 x 0.45 m 2#780 2.00 7.00 8.00 3.06 49.00 49.00
LONGITUD 20.45 m 5#690 5.00 6.00 9.00 2.25 101.25 101.25
VOLUMEN 2.76 m3 1#630 1.00 6.00 3.00 2.25 6.75 6.75
SECCION 0.40x0.75 m 0.40 x 0.75 m 3#680 3.00 6.00 8.00 2.25 54.00 54.00
LONGITUD 3.60 m 2#6120 2.00 6.00 12.00 2.25 54.00 54.00
VOLUMEN 1.08 m3 1#7120 1.00 7.00 12.00 3.06 36.75 36.75
2#660 2.00 6.00 6.00 2.25 27.00 27.00
VIGA V55 3#580 3.00 5.00 8.00 1.56 37.50 37.50
CANTIDAD 1.00 342#313.8 342.00 3.00 1.38 0.56 265.48 265.48
SECCION 0.50x0.45 m 0.50 x 0.45 m 862.54 862.54 kg
LONGITUD 24.05 m
VOLUMEN 5.41 m3 V54
6#590 6.00 5.00 9.00 1.56 84.38 84.38
VIGA V56 2#470 2.00 4.00 7.00 1.00 14.00 14.00
CANTIDAD 1.00 2#5120 2.00 5.00 12.00 1.56 37.50 37.50
SECCION 0.30x0.45 m 0.30 x 0.45 m 1#640 1.00 6.00 4.00 2.25 9.00 9.00
LONGITUD 12.05 m 2#770 2.00 7.00 7.00 3.06 42.88 42.88
VOLUMEN 1.63 m3 2#850 2.00 8.00 5.00 4.00 40.00 40.00
2#580 2.00 5.00 8.00 1.56 25.00 25.00
VIGA V57 4#643 4.00 6.00 4.30 2.25 38.70 38.70
CANTIDAD 1.00 159#313.8 159.00 3.00 1.38 0.56 123.42 123.42
SECCION 0.35x0.45 m 0.35 x 0.45 m 21#321.8 21.00 3.00 2.18 0.56 25.75 25.75
LONGITUD 7.90 m 440.63 440.63 kg
VOLUMEN 1.24 m3
SECCION 0.50x0.45 m 0.50 x 0.45 m V55
LONGITUD 3.70 m 2#790 2.00 7.00 9.00 3.06 55.13 55.13
VOLUMEN 0.83 m3 2#860 2.00 8.00 6.00 4.00 48.00 48.00
2#7120 2.00 7.00 12.00 3.06 73.50 73.50
VIGA V58 2#7105 2.00 7.00 10.50 3.06 64.31 64.31
CALCULO DE CANTIDADES DE OBRA NUEVA SEDE CAMARA DE COMERCIO DE PALMIRA 83 de 100
VTA50 V68
CALCULO DE CANTIDADES DE OBRA NUEVA SEDE CAMARA DE COMERCIO DE PALMIRA 85 de 100
VTA53 V70
CANTIDAD 1.00 2#760 2.00 7.00 6.00 3.06 36.75 73.50
SECCION 0.25x0.45 m 0.25 x 0.45 m 2#750 2.00 7.00 5.00 3.06 30.63 61.25
LONGITUD 11.50 m 2#730 2.00 7.00 3.00 3.06 18.38 36.75
VOLUMEN 1.29 m3 2#7103 2.00 7.00 10.30 3.06 63.09 126.18
1#860 1.00 8.00 6.00 4.00 24.00 48.00
VTA54 56#312.8E 56.00 3.00 1.28 0.56 40.32 80.64
CANTIDAD 1.00 213.16 426.32 kg
SECCION 0.16x0.45 m 0.16 x 0.45 m
LONGITUD 2.50 m V18
VOLUMEN 0.18 m3 4#697.2 4.00 6.00 9.72 2.25 87.48 87.48
1#797.2 1.00 7.00 9.72 3.06 29.77 29.77
VTA55 2#835 2.00 8.00 3.50 4.00 28.00 28.00
CANTIDAD 1.00 39#316.8E 39.00 3.00 1.68 0.56 36.86 36.86
SECCION 0.16x0.45 m 0.16 x 0.45 m 182.10 182.10 kg
LONGITUD 3.00 m
VOLUMEN 0.22 m3 V41
3#780 3.00 7.00 8.00 3.06 73.50 73.50
VTA56 1#770 1.00 7.00 7.00 3.06 21.44 21.44
CANTIDAD 2.00 4#543 4.00 5.00 4.30 1.56 26.88 26.88
SECCION 0.30x0.45 m 0.30 x 0.45 m 2#7115 2.00 7.00 11.50 3.06 70.44 70.44
LONGITUD 1.20 m 2#737 2.00 7.00 3.70 3.06 22.66 22.66
VOLUMEN 0.32 m3 84#317.8 84.00 3.00 1.78 0.56 84.11 84.11
15#313.8 15.00 3.00 1.38 0.56 11.64 11.64
VTA57 310.66 310.66 kg
CANTIDAD 2.00
SECCION 0.16x0.45 m 0.16 x 0.45 m VTA47
LONGITUD 1.20 m 4#643 3.00 7.00 8.00 3.06 73.50 147.00
VOLUMEN 0.17 m3 28#211E 15.00 3.00 1.38 0.56 11.64 23.29
85.14 170.29 kg
VTA15x40
CANTIDAD 3.00 VTA48
SECCION 0.15x0.40 m 0.15 x 0.40 m 4#441.7 4.00 4.00 4.17 1.00 16.68 16.68
LONGITUD 5.90 m 24#211E 24.00 2.00 1.10 0.25 6.60 6.60
VOLUMEN 1.06 m3 23.28 23.28 kg
VOLUMEN MUROS TANQUE CONTRAINCENDIO 33.66 m3 REFUERZO MUROS TANQUE CONTRAINCENDIO 3,600.12 kg
VIGA CIMIENTO NERVIO V3 25x90 REFERENCIA CANTIDAD DIAMETRO LONGITUD PESO TOTAL
CANTIDAD 7.00 2#790 2 7 9.00 3.06 55.13 385.88
SECCCION 0.25X0.90 m 0.18 m2 1#590 1 5 9.00 1.56 14.06 98.44
LONGITUD 7.50 m 3#890 3 8 9.00 4.00 108.00 756.00
VOLUMEN VIGA CIMIENTO NERVIO V3 25x90 9.19 m3 4#490 4 4 9.00 1.00 36.00 252.00
38#320E 38 3 2.00 0.56 42.75 299.25
255.94 1,791.56 kg 195.00 kg/m3
VIGA CIMIENTO NERVIO V4 20x90 REFERENCIA CANTIDAD DIAMETRO LONGITUD PESO TOTAL
CANTIDAD 2.00 2#790 2 7 9.00 3.06 55.13 110.25
SECCCION 0.20X0.90 m 0.14 m2 2#890 2 8 9.00 4.00 72.00 144.00
LONGITUD 12.04 m 4#490 4 4 9.00 1.00 36.00 72.00
VOLUMEN VIGA CIMIENTO NERVIO V4 20x90 3.37 m3 60#319E 60 3 1.90 0.56 64.13 128.25
227.25 454.50 kg 134.82 kg/m3
VOLUMEN DE VIGAS DE CIMENTACION TANQUE CONTRAINCENDIO 32.74 m3 REFUERZO VIGAS DE CIMENTACION TANQUE CONTRAINCENDIO 5,037.86 kg
VIGA LOSA SUPERIOR SOBRE MURO V-2 REFERENCIA CANTIDAD DIAMETRO LONGITUD PESO TOTAL
CANTIDAD 2.00 12#490 12 4 9.00 1.00 108.00 216.00
SECCCION 0.50X0.60 m 0.30 m2 38#319.2E 38 3 1.92 0.56 41.04 82.08
LONGITUD 9.00 m 149.04 298.08 kg 55.20 kg/m3
VOLUMEN VIGA LOSA SUPERIOR SOBRE MURO V-2 5.40 m3
VIGA LOSA SUPERIOR TANQUE NERVIO V-5 25x60 REFERENCIA CANTIDAD DIAMETRO LONGITUD PESO TOTAL
CANTIDAD 11.00 4#390 4 3 9.00 0.56 20.25 222.75
SECCCION 0.25X0.60 m 0.10 m2 38#314E 38 3 1.40 0.56 29.93 329.18
LONGITUD 7.50 m 50.18 551.93 kg 66.90 kg/m3
VOLUMEN VIGA LOSA SUPERIOR TANQUE NERVIO V-5 25x60 8.25 m3
VIGA LOSA SUPERIOR TANQUE NERVIO V-6 25x60 REFERENCIA CANTIDAD DIAMETRO LONGITUD PESO TOTAL
CANTIDAD 3.00 4#390 4 3 9.00 0.56 20.25 60.75
SECCCION 0.25X0.60 m 0.10 m2 4#363 4 3 6.30 0.56 14.18 42.53
LONGITUD 12.04 m 60#314E 60 3 1.40 0.56 47.25 141.75
VOLUMEN VIGA LOSA SUPERIOR TANQUE NERVIO V-6 25x60 3.61 m3 81.68 245.03 kg 67.84 kg/m3
TRAMO 3 N+1.00 AL N+2.97 REFERENCIA CANTIDAD DIAMETRO LONGITUD PESO TOTAL/TRAMO TOTAL
LOSETAS Y PELDAÑOS TRAMO 3 N+1.00 AL N+2.97
ANCHO DE ESCALERA 0.50 m 8#250 8.00 2.00 5.00 0.25 10.00
AREA TRANSVERSAL 0.87 m2 27#214 27.00 2.00 1.40 0.25 9.45
VOLUMEN DE CONCRETO LOSETAS Y PELDAÑOS 0.44 m3 27#209.5 27.00 2.00 0.95 0.25 6.41
VIGAS DE CARGA 4#515.5 4.00 5.00 1.55 1.56 9.69
AREA TRANSVERSAL 1.63 m2 4#538 4.00 5.00 3.80 1.56 23.75
CALCULO DE CANTIDADES DE OBRA NUEVA SEDE CAMARA DE COMERCIO DE PALMIRA 93 de 100
TRAMO 4 N+2.97 AL N+4.95 REFERENCIA CANTIDAD DIAMETRO LONGITUD PESO TOTAL/TRAMO TOTAL
LOSETAS Y PELDAÑOS TRAMO 4 N+2.97 AL N+4.95
ANCHO DE ESCALERA 0.50 m 8#250 8.00 2.00 5.00 0.25 10.00
AREA TRANSVERSAL 0.86 m2 27#214 27.00 2.00 1.40 0.25 9.45
VOLUMEN DE CONCRETO LOSETAS Y PELDAÑOS 0.43 m3 27#209.5 27.00 2.00 0.95 0.25 6.41
VIGAS DE CARGA 4#519.5 4.00 5.00 1.95 1.56 12.19
AREA TRANSVERSAL 1.66 m2 4#638 4.00 5.00 3.80 1.56 23.75
ANCHO DE VIGAS 0.32 m 4#629 4.00 6.00 2.90 2.25 26.10
VOLUMEN DE CONCRETO VIGAS DE CARGA 0.53 m3 4#627 4.00 6.00 2.70 2.25 24.30
VOLADO DE 6 cm 4#534 4.00 5.00 3.40 1.56 21.25
AREA TRANSVERSAL 0.33 m2 56#310 56.00 3.00 1.00 0.56 31.50
ANCHO LOSETA 0.30 m 16#306 16.00 3.00 0.60 0.56 5.40
VOLUMEN DE CONCRETO VOLADO DE 6 cm 0.10 m3 170.35 170.35 kg
VOLUMEN DE CONCRETO TRAMO 4 N+2.97 AL N+4.95 1.06 m3
TRAMO 5 N+4.95 AL N+7.09 REFERENCIA CANTIDAD DIAMETRO LONGITUD PESO TOTAL/TRAMO TOTAL
LOSETAS Y PELDAÑOS TRAMO 5 N+4.95 AL N+7.09
ANCHO DE ESCALERA 0.50 m 8#255 8.00 2.00 5.50 0.25 11.00
AREA TRANSVERSAL 1.01 m2 30#214 30.00 2.00 1.40 0.25 10.50
VOLUMEN DE CONCRETO LOSETAS Y PELDAÑOS 0.51 m3 30#209.5 30.00 2.00 0.95 0.25 7.13
VIGAS DE CARGA 4#539.5 4.00 5.00 3.95 1.56 24.69
AREA TRANSVERSAL 1.92 m2 4#632 4.00 6.00 3.20 2.25 28.80
ANCHO DE VIGAS 0.32 m 4#625 4.00 6.00 2.50 2.25 22.50
VOLUMEN DE CONCRETO VIGAS DE CARGA 0.61 m3 4#539 4.00 5.00 3.90 1.56 24.38
VOLADO DE 6 cm 4#515 4.00 5.00 1.50 1.56 9.38
AREA TRANSVERSAL 0.35 m2 56#310 56.00 3.00 1.00 0.56 31.50
ANCHO LOSETA 0.30 m 16#306 16.00 3.00 0.60 0.56 5.40
VOLUMEN DE CONCRETO VOLADO DE 6 cm 0.10 m3 18#211 18.00 2.00 1.10 0.25 4.95
RELLENO 8#224 8.00 2.00 2.40 0.25 4.80
AREA TRANSVERSAL 0.31 m2 8#221.5 8.00 2.00 2.15 0.25 4.30
CALCULO DE CANTIDADES DE OBRA NUEVA SEDE CAMARA DE COMERCIO DE PALMIRA 94 de 100
TRAMO 6 N+7.26 AL N+9.40 REFERENCIA CANTIDAD DIAMETRO LONGITUD PESO TOTAL/TRAMO TOTAL
LOSETAS Y PELDAÑOS TRAMO 6 N+7.26 AL N+9.40
ANCHO DE ESCALERA 0.50 m 8#260 8.00 2.00 6.00 0.25 12.00
AREA TRANSVERSAL 1.20 m2 37#214 37.00 2.00 1.40 0.25 12.95
VOLUMEN DE CONCRETO LOSETAS Y PELDAÑOS 0.60 m3 37#209.5 37.00 2.00 0.95 0.25 8.79
VIGAS DE CARGA 4#630 4.00 6.00 3.00 2.25 27.00
AREA TRANSVERSAL 2.18 m2 4#629 4.00 6.00 2.90 2.25 26.10
ANCHO DE VIGAS 0.32 m 4#627 4.00 6.00 2.70 2.25 24.30
VOLUMEN DE CONCRETO VIGAS DE CARGA 0.70 m3 4#534 4.00 5.00 3.40 1.56 21.25
VOLADO DE 6 cm 8#516 8.00 5.00 1.60 1.56 20.00
AREA TRANSVERSAL 0.35 m2 8#527.5 8.00 5.00 2.75 1.56 34.38
ANCHO LOSETA 0.30 m 48#310 48.00 3.00 1.00 0.56 27.00
VOLUMEN DE CONCRETO VOLADO DE 6 cm 0.11 m3 22#306 22.00 3.00 0.60 0.56 7.43
VOLUMEN DE CONCRETO TRAMO 6 N+7.26 AL N+9.40 1.40 m3 221.19 221.19 kg
TRAMO 7 N+9.40 AL N+11.37 REFERENCIA CANTIDAD DIAMETRO LONGITUD PESO TOTAL/TRAMO TOTAL
LOSETAS Y PELDAÑOS TRAMO 7 N+9.40 AL N+11.37
ANCHO DE ESCALERA 0.50 m 8#255 8.00 2.00 5.50 0.25 11.00
AREA TRANSVERSAL 0.93 m2 30#214 30.00 2.00 1.40 0.25 10.50
VOLUMEN DE CONCRETO LOSETAS Y PELDAÑOS 0.46 m3 30#209.5 30.00 2.00 0.95 0.25 7.13
VIGAS DE CARGA 4#539.5 4.00 5.00 3.95 1.56 24.69
AREA TRANSVERSAL 1.77 m2 4#632 4.00 6.00 3.20 2.25 28.80
ANCHO DE VIGAS 0.32 m 4#625 4.00 6.00 2.50 2.25 22.50
VOLUMEN DE CONCRETO VIGAS DE CARGA 0.57 m3 4#539 4.00 5.00 3.90 1.56 24.38
VOLADO DE 6 cm 4#515 4.00 5.00 1.50 1.56 9.38
AREA TRANSVERSAL 0.34 m2 66#310 66.00 3.00 1.00 0.56 37.13
ANCHO LOSETA 0.30 m 16#306 16.00 3.00 0.60 0.56 5.40
VOLUMEN DE CONCRETO VOLADO DE 6 cm 0.10 m3 18#211 18.00 2.00 1.10 0.25 4.95
VOLUMEN DE CONCRETO TRAMO 7 N+9.40 AL N+11.37 1.13 m3 8#224 8.00 2.00 2.40 0.25 4.80
8#221.5 8.00 2.00 2.15 0.25 4.30
28#207 28.00 2.00 0.70 0.25 4.90
199.84 199.84 kg
TRAMO 8 N+11.37 AL N+13.35 REFERENCIA CANTIDAD DIAMETRO LONGITUD PESO TOTAL/TRAMO TOTAL
LOSETAS Y PELDAÑOS TRAMO 8 N+11.37 AL N+13.35
ANCHO DE ESCALERA 0.50 m 8#250 8.00 2.00 5.00 0.25 10.00
CALCULO DE CANTIDADES DE OBRA NUEVA SEDE CAMARA DE COMERCIO DE PALMIRA 95 de 100