Resumen IEEE- 1410

Esta guía This guide is limited to the protection of distribution-line insulation for system voltages 69 kV and
below. Distribution

Propósito

El propósito de la guía es presentar alternativas para redicir flameos caisados por rayos en líneas de
distribución

3.2 basic impulse insulation level (BIL) (rated impulse withstand voltage)
(surge arresters): El valor pico de un impulso de rayo estándar en el cual el nivel de
aislamiento muestra 90% de probabilidad de resistir el flameo, o un 10% de
probabilidad de falla a condiciones especificadas

critical impulse flashover voltage (CFO) (insulators): El valor pico de una onda
de la onda de impulso que a condiciones especificadas causa flameo a través del
medio circundante en 50% de las aplicaciones.

Ground flash density (GFD)(Ng): El número promedio de impulsos de rayos por


unidad de área por unidad de tiempo en una ubicación particular.

3.14 lightning first return stroke: Una descarga de rayo a tierra, iniciada cuando la
punta de un líder descendente se encuentra con un líder ascendente desde tierra.

3.15 lightning flash: La descarga completa de rayo, generalmente compuesta de


uno o más lideres desde una nube seguidos por uno o más descargas retornantes.

3.16 lightning subsequent stroke: Una descarga de rayo a la cual que puede seguir
un camino ya establecido por una primera descarga.

Line lightning performance: El desempeño de una línea en términos del número


anual de rayos en un circuito de un kilómetro o línea torre de un kilómetro.

La desidad de rayos a tierra Ng para áreas templadas puede ser estimada de Td, el nivel ceraumico con la
siguiente ecuación de Anderson et al. [B6]:

Donde Td son los días en los que caen rayos al año


Para Colombia se usa

Los Flacheos directos de rayos a conductores de líneas de distribución desprotegidos causa flameos en el
aislamiento en la mayoría de casos. Por ejemplo un a descarga tan pequeña como 10kA puede producir una
sobretensión de cerca de 2000kV, lo cual excede bastante los valores de aislamiento de una línea de
transmisión operando hasta 69KV.
Estimación de rayos en 100Km por año.

Ng= densidad de rayos a tierra


h: altura del conductor más alto de la línea
b: ancho de la línea
N: número de impactos en la línea

La influencia de objetos cercanos en el numero directo de impactos de rayo (N) en una línea de distribución
es expresado usando un factor de apantallamiento, Sf está definido como la porción por unidad de la línea de
transmisión que esta apantallada por objetos próximos

Ns: número de impactos directos a parte de la línea apantallada (rayos/km/año)


N: número de impactos directos en la línea en terreno despejado
Sf: factor de apantallamiento (0-1)

Para sacar Sf (shielding factor)

La grafica anterior es para una línea de distribución con altura de 10m

Induced-voltage calculations should be carried out in the following way:


⎯ A prospective flash location, first and subsequent stroke peak magnitudes are established, for
Example using a Monte Carlo method in combination with the attractive radius expression in
Equation (7).
⎯ the lightning current where it contacts the ground at channel base, is assumed, for example using
the wave shape in Figure 3 or a ramp with equivalent front time tm from Table 1.
⎯ A lightning return-stroke model, which specifies the spatial-temporal distribution of the current
along the channel is selected, as in Nucci et al. [B79]. Normally, the radiated field from this
current dominates electrostatic or induction fields for the short times of interest in calculating
induced overvoltage, see Uman et al. [B111].
⎯ The electromagnetic field associated with the current is calculated everywhere along the line,
taking into account if needed the effect of the soil conductivity, see Cooray [B34] and Rubinstein
[B99]. Normally, the electric field is resolved into its vertical and horizontal components, but other
combinations of field components are equivalent since they are all related by Maxwell’s equations.
⎯ The computed electromagnetic field is used to calculate the induced transients using a field-to transmission
line coupling model based on the source terms, as in Agrawal et al. [B1].
⎯ The response of the power system components to the induced transients is calculated using an
EMTP-based modeling program that includes the possibility of computing line responses to
external excitation electromagnetic fields.
⎯ The calculation is repeated many times with different flash locations and peak stroke magnitudes to
simulate a large number of years of service.
⎯ The calculation results are normalized to the local ground flash density.

DPS
The proximity of surge arresters can mitigate the effects of lightning-induced voltages. The results of
Borghetti et al. [B22] and Paolone et al. [B84] show that a significant improvement of the lightning
performance of the considered distribution line can be obtained by reducing the spacing between the surge
arresters below few hundreds of meters. Again, for a precise evaluation of the need to protect every phase
with a surge arrester and of the optimal arresters spacing, the use of available software is needed along with
the knowledge of the non-linear characteristics of the protection devices.

Clearly, a refined evaluation of the indirect lightning performance should take into account the real
topology and geometry of distribution networks, which are in general constituted by short lines terminated
to power system components (e.g., loads and transformers), in general protected by surge arresters. To this
purpose, adequate EMTP-based computational tools are available, see Nucci and Rachidi [B83].

The CFO is defined as the voltage level at which statistically there is a 50% chance of flashover
and a 50% chance of withstand.

Guy Wire (viento): los vientos pueden reducir el CFO total de la línea, ya que estos proporcionan un camino
eléctrico a tierra

Fusibles: Las posiciones de los fusibles y los suiches es una línea pueden disminuir el CFO dependiendo de
como estén montados en la línea.

Altura y posición del neutro: Entre más cerca esté el neutro de los conductores de fase en postes de madera,
menor será el CFO.

El uso de estructuras de concreto o acero reducen bastante el CFO, cualquier elemento metálico puesto a
tierra en una estructura reduce el CFO, En estructuras metálicas el CFO total está dado por el aislador
principal.
Espaciadores: Las líneas con espaciadores presentan niveles de CFO altos, debido a que en configuraciones
con espaciadores un cable tiende a actuar como cable de guarda, lo cual puede reducir los flameos de impacto
directo, los espaciadores son instalados en áreas donde el contacto con árboles puede ser un factor de riesgo
de falla, también pueden ser instalados en líneas ya instaladas en las que se quiere ahorrar espacio.

Uso de Cables de guarda:

El uso de cables de guarda es efectivo solo si:


-Se usan buenas prácticas de aislamiento para brindar suficiente CFO entre el camino que va a tierra y los
conductores de fase
-Bajas resistencias de poste a tierra son obtenidas

- a menor distancia este el cable de guarda de las fases menor serán los voltajes inducidos, sin embargo se
reducirá el CFO.

-AL añadir un cable de guarda debajo de los conductores de fase tendrá un efecto de acoplamiento mutuo
aproximadamente igual a un cable de guarda arriba de las fases

-usar cable de guarda y neutro tendrá beneficios en el desempeño de la línea contra rayos ya que el factor de
acoplamiento será mayor.
-El angulo del cable de guarda debe ser de 45 o menos, esto para líneas de menos de 15m y con distancia
entre conductores menor a 2m

Se debe lograr un CFO de 250 – 300Kv para poder lograr efectividad en la aplicación de cables de guarda,
para esto se usan conectores de baja impedancia (ground lead standoffs) cuyo fin es aislar apropiadamente el
camino a tierra con la torre.

La efectividad de los cables de guarda depende en gran manera de ala aterrización, para una implementación
de cables de guarda las resistencias a tierra deben ser menos de 10ohm si el CFO es menos de 210kV, si el
CFO está entre 300 y 350 la resistencia debe ser de 30ohm. EL cable de guarda debe estar aterrizado en cada
poste

DPS-Descargadores de sobretensión- surge arresters:


Los DPS proveen protección contra sobrevoltaje para trafos y reguladores. Estos funcionan a impedancias
grandes en operación normal de tensión y a baja impedancia durante impactos de rayos o tensiones inducidas
por rayos. Estos pueden ser usados para reducir el número de flameos en el aislamiento de distribución

-Arresters may be even more effective at reducing induced flashovers if they are used to protect poles with
poor insulation levels. These “weak links” may include cut-outs, dead-end poles, or crossover poles.
Placing arresters on these poles may be more cost-effective than improving the insulation level.

-If the top-phase conductor is situated such that it will intercept all lightning strokes, arresters may be
applied to the top phase which makes it act like an OHGW.