CRONOGRAMA VALORIZADO DE OBRA

IOARR: REPARACION DE BOCATOMA - DESARENADOR Y CAMARA DE CONTROL; RENOVACION DE LÍNEA DE CONDUCCIÓN; EN EL(LA) SISTEMA DE RIEGO EN LOS SECTORES DE ALBAZUYOC BAJA Y TEREBINTO, EN LA ZONAL DE ECHARATE, DISTRITO DE ECHARATE, PROVINCIA LA CONVENCION, DEPARTAMENTO

PRESUPUESTO MES 1 MES 2 MES 3 MES4


ITEM DESCRIPCION TOTAL
UND CANT P.U. PARCIAL METRADO COSTO % METRADO COSTO % METRADO COSTO % METRADO COSTO %
01 OBRAS PROVISIONALES 2,343.85 41.00 2,343.85 0.00 0.00 2,343.85
01.01 CARTEL DE OBRA und 1.00 1,464.25 1,464.25 1.00 1,464.25 100% 0 0% 1,464.25
01.02 CAMPAMENTOS MOVIL m2 40.00 21.99 879.60 40.00 879.60 100% 0 0% 879.60
02 TRABAJOS PRELIMINARES 10,177.18 1,767.00 10,177.18 0.00 0.00 10,177.18
02.01 LIMPIEZA DEL TERRENO MANUAL m2 1,171.00 1.38 1,615.98 1,171.00 1,615.98 100% 0 0% 1,615.98
02.02 TRAZO NIVELACION Y REPLANTEO DE ESTRUC. m2 420.00 1.81 760.20 420.00 760.20 100% 0 0% 760.20
02.03 HABILITACIÓN DE CAMINOS DE ACCESO m2 175.00 1.72 301.00 175.00 301.00 100% 0 0% 301.00
02.04 MOVILIZACION Y DESMOVILIZACION DE EQUIPO glb 1.00 7,500.00 7,500.00 1.00 7,500.00 100% 0 0% 7,500.00
03 ACTIVO N°01:BOCATOMA-DESARENADOR 104,985.13 6,098.24 104,985.15 0.00 0.00 104,985.15
03.01 REHABILITACION BOCATOMA - DESARENADOR HUACAYOC 45,835.28 3,628.74 45,835.28 0.00 0.00 45,835.28
03.01.01 MOVIMIENTO DE TIERRAS 36,427.29 3,440.74 36,427.29 0.00 0.00 36,427.29
03.01.01.01 EXCAVACION CON MAQUINARIA EN CAUCE DE RIO m3 1,575.00 4.55 7,166.25 1,575.00 7,166.25 100% 0 0% 7,166.25
03.01.01.02 ENCAUSAMIENTO DE CURSO DE AGUA m3 994.50 5.32 5,290.74 994.50 5,290.74 100% 0 0% 5,290.74
03.01.01.03 ENROCADO EN TALUD MARGEN I-D m3 640.00 33.45 21,408.00 640.00 21,408.00 100% 0 0% 21,408.00
03.01.01.04 LIMPIEZA MANUAL EN ESTRUCTURA m3 19.24 41.39 796.34 19.24 796.34 100% 0 0% 796.34
03.01.01.05 ELIMINACION DE MATERIAL EXCEDENTE DISTANCIA 0.5KM m3 212.00 8.33 1,765.96 212.00 1,765.96 100% 0 0% 1,765.96
03.01.02 CANAL DE SALIDA 2,336.52 123.00 2,336.52 0.00 0.00 2,336.52
03.01.02.01 LIMPIEZA CAJA CANAL m3 78.00 23.44 1,828.32 78.00 1,828.32 100% 0 0% 1,828.32
03.01.02.02 REPARACION DE FISURAS GRIETAS Y JUNTAS m 40.00 10.55 422.00 40.00 422.00 100% 0 0% 422.00
03.01.02.03 ELIMINACION DE MATERIAL EXCEDENTE D:30M m3 5.00 17.24 86.20 5.00 86.20 100% 0 0% 86.20
03.01.03 CONFECCION, HABILITACION e INSTALACION DE ELEMENTOS METALICOS 7,071.47 65.00 7,071.47 0.00 0.00 7,071.47
03.01.03.01 SUMINISTRO E INSTALACION DE COMPUERTAS und 1.00 1,040.83 1,040.83 1.00 1,040.83 100% 0 0% 1,040.83
03.01.03.02 CONCRETO f'c=175 kg/cm2 m3 8.00 501.23 4,009.84 8.00 4,009.84 100% 0 0% 4,009.84
03.01.03.03 ACERO DE REFUERZO fy=4,200 kg/cm2 FIERRO CORRUG. kg 24.00 7.64 183.36 24.00 183.36 100% 0 0% 183.36
03.01.03.04 ENCOFRADO Y DESENCOFRADO MUROS m2 32.00 57.42 1,837.44 32.00 1,837.44 100% 0 0% 1,837.44
03.02 REHABILITACION BOCATOMA - DESARENADOR ALBAZUYOC BAJA 36,519.66 1,471.83 36,519.67 100% 0.00 0.00 36,519.67
03.02.01 MOVIMIENTO DE TIERRAS 20,232.64 1,109.24 20,232.64 0.00 0.00 20,232.64
03.02.01.01 EXCAVACION CON MAQUINARIA EN CAUCE DE RIO m3 450.00 4.55 2,047.50 450.00 2,047.50 100% 0 0% 2,047.50
03.02.01.02 ENROCADO EN TALUD MARGEN I-D m3 480.00 33.45 16,056.00 480.00 16,056.00 100% 0 0% 16,056.00
03.02.01.03 LIMPIEZA MANUAL EN ESTRUCTURA m3 19.24 41.39 796.34 19.24 796.34 100% 0 0% 796.34
03.02.01.04 ELIMINACION DE MATERIAL EXCEDENTE DISTANCIA 0.5KM m3 160.00 8.33 1,332.80 160.00 1,332.80 100% 0 0% 1,332.80
03.02.02 CANAL DE SALIDA 2,336.52 123.00 2,336.52 0.00 0.00 2,336.52
03.02.02.01 LIMPIEZA CAJA CANAL m3 78.00 23.44 1,828.32 78.00 1,828.32 100% 0 0% 1,828.32
03.02.02.02 REPARACION DE FISURAS GRIETAS Y JUNTAS m 40.00 10.55 422.00 40.00 422.00 100% 0 0% 422.00
03.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE D:30M m3 5.00 17.24 86.20 5.00 86.20 100% 0 0% 86.20
03.02.03 DESARENADOR 6,817.91 166.59 6,817.92 0.00 0.00 6,817.92
03.02.03.01 LIMPIEZA EN ESTRUCTURA m3 135.00 23.44 3,164.40 135.00 3,164.40 100% 0 0% 3,164.40
03.02.03.02 SUMINISTRO E INSTALACION DE COMPUERTAS TIPO TARGETA und 1.00 445.78 445.78 1.00 445.78 100% 0 0% 445.78
03.02.03.03 CONCRETO F'C=175 KG/CM2 m3 3.27 501.23 1,639.02 3.27 1,639.02 100% 0 0% 1,639.02
03.02.03.04 ENCOFRADO Y DESENCOFRADO m2 27.32 57.42 1,568.71 27.32 1,568.71 100% 0 0% 1,568.71
03.02.04 CONFECCION, HABILITACION e INSTALACION DE ELEMENTOS METALICOS 7,132.59 73.00 7,132.59 0.00 0.00 7,132.59
03.02.04.01 SUMINISTRO E INSTALACION DE COMPUERTAS und 1.00 1,040.83 1,040.83 1.00 1,040.83 100% 0 0% 1,040.83
03.02.04.02 CONCRETO f'c=175 kg/cm2 m3 8.00 501.23 4,009.84 8.00 4,009.84 100% 0 0% 4,009.84
03.02.04.03 ACERO DE REFUERZO fy=4,200 kg/cm2 FIERRO CORRUG. kg 32.00 7.64 244.48 32.00 244.48 100% 0 0% 244.48
03.02.04.04 ENCOFRADO Y DESENCOFRADO MUROS m2 32.00 57.42 1,837.44 32.00 1,837.44 100% 0 0% 1,837.44
03.03 REHABILITACION BOCATOMA - DESARENADOR TEREBINTO 22,630.19 997.67 22,630.19 0.00 0.00 22,630.19
03.03.01 MOVIMIENTO DE TIERRAS 16,989.13 869.88 16,989.13 0.00 0.00 16,989.13
03.03.01.01 EXCAVACION CON MAQUINARIA EN CAUCE DE RIO m3 300.00 4.55 1,365.00 300.00 1,365.00 100% 0 0% 1,365.00
03.03.01.02 ENROCADO EN TALUD MARGEN I-D m3 420.00 33.45 14,049.00 420.00 14,049.00 100% 0 0% 14,049.00
03.03.01.03 LIMPIEZA MANUAL EN ESTRUCTURA m3 9.88 41.39 408.93 9.88 408.93 100% 0 0% 408.93
03.03.01.04 ELIMINACION DE MATERIAL EXCEDENTE DISTANCIA 0.5KM m3 140.00 8.33 1,166.20 140.00 1,166.20 100% 0 0% 1,166.20
PRESUPUESTO MES 1 MES 2 MES 3 MES4
ITEM DESCRIPCION TOTAL
UND CANT P.U. PARCIAL METRADO COSTO % METRADO COSTO % METRADO COSTO % METRADO COSTO %
03.03.02 CANAL DE SALIDA 1,289.72 63.80 1,289.72 0.00 0.00 1,289.72
03.03.02.01 LIMPIEZA CAJA CANAL m3 46.80 23.44 1,096.99 46.80 1,096.99 100% 0 0% 1,096.99
03.03.02.02 REPARACION DE FISURAS GRIETAS Y JUNTAS m 15.00 10.55 158.25 15.00 158.25 100% 0 0% 158.25
03.03.02.03 ELIMINACION DE MATERIAL EXCEDENTE D:30M m3 2.00 17.24 34.48 2.00 34.48 100% 0 0% 34.48
03.03.03 DESARENADOR 3,310.51 62.99 3,310.51 0.00 0.00 3,310.51
03.03.03.01 LIMPIEZA EN ESTRUCTURA m3 45.00 23.44 1,054.80 45.00 1,054.80 100% 0 0% 1,054.80
03.03.03.02 SUMINISTRO E INSTALACION DE COMPUERTAS TIPO TARGETA und 1.00 445.78 445.78 1.00 445.78 100% 0 0% 445.78
03.03.03.03 CONCRETO F'C=175 KG/CM2 m3 1.88 501.23 942.31 1.88 942.31 100% 0 0% 942.31
03.03.03.04 ENCOFRADO Y DESENCOFRADO m2 15.11 57.42 867.62 15.11 867.62 100% 0 0% 867.62
03.03.04 CONFECCION, HABILITACION e INSTALACION DE ELEMENTOS METALICOS 1,040.83 1.00 1,040.83 100% 0.00 0.00 1,040.83
03.03.04.01 SUMINISTRO E INSTALACION DE COMPUERTAS und 1.00 1,040.83 1,040.83 1.00 1,040.83 100% 0 0% 1,040.83
04 ACTIVO N°02:CANAL DE CONDUCCIÓN 123,351.35 4,468.20 40,804.30 3,515.65 82,547.03 123,351.34
04.01 RENOVACIÓN CANAL DE RIEGO ALBAZUYOC BAJA 40,804.31 4,468.20 40,804.30 0.00 0.00 40,804.30
04.01.01 TRABAJOS PRELIMINARES 3,450.00 2,500.00 3,450.00 0.00 0.00 3,450.00
04.01.01.01 LIMPIEZA DEL TERRENO MANUAL m2 2,500.00 1.38 3,450.00 2,500.00 3,450.00 100% 0 0% 3,450.00
04.01.02 CONFORMACION DE PLATAFORMA 4,147.09 426.00 4,147.09 0.00 0.00 0% 4,147.09
04.01.02.01 LIMPIEZA DE DESLIZAMIENTO DE TALUDES m2 280.00 1.51 422.80 280.00 422.80 100% 0 0% 422.80
04.01.02.02 CONFORMACION MANUAL DE PLATAFORMA TERRENO NORMAL m3 137.50 26.02 3,577.75 137.50 3,577.75 100% 0 0% 3,577.75
04.01.02.03 ELIMINACION DE MATERIAL EXCEDENTE m3 8.50 17.24 146.54 8.50 146.54 100% 0 0% 146.54
04.01.03 CANAL DE RIEGO 33,207.22 1,542.20 33,207.21 0.00 0.00 33,207.21
04.01.03.01 EXCAVACION MASIVA Y CONFORMACION DE PLATAFORMA CANAL m3 845.00 7.37 6,227.65 845.00 6,227.65 100% 0 0% 6,227.65
04.01.03.02 RELLENO CON MATERIAL PROPIO m3 18.00 21.09 379.62 18.00 379.62 100% 0 0% 379.62
04.01.03.03 REFINE NIVELAC. Y COMPACT. TERRENO NATURAL m2 60.00 0.80 48.00 60.00 48.00 100% 0 0% 48.00
04.01.03.04 ENCOFRADO Y DESENCOFRADO MUROS m2 180.00 57.42 10,335.60 180.00 10,335.60 100% 0 0% 10,335.60
04.01.03.05 CONCRETO F'C=175 KG/CM2 m3 21.60 501.23 10,826.57 21.60 10,826.57 100% 0 0% 10,826.57
04.01.03.06 ACARREO DE CONCRETO m3 21.60 61.06 1,318.90 21.60 1,318.90 100% 0 0% 1,318.90
04.01.03.07 TARRAJEO MEZCLA 1.5 m2 198.00 16.39 3,245.22 198.00 3,245.22 100% 0 0% 3,245.22
04.01.03.08 CURADO DE CONCRETO m2 198.00 4.17 825.66 198.00 825.66 100% 0 0% 825.66
04.02 RENOVACIÓN CANAL DE RIEGO TEREBINTO 82,547.04 0.00 0.00 3,515.65 82,547.03 82,547.03
04.02.01 TRABAJOS PRELIMINARES 2,760.00 0.00 0.00 2,000.00 2,760.00 2,760.00
04.02.01.01 LIMPIEZA DEL TERRENO MANUAL m2 2,000.00 1.38 2,760.00 0.00 0% 2000.00 2760 2,760.00
04.02.02 OBRAS DE PROTECCION 63,541.20 0.00 0.00 635.88 63,541.20 63,541.20
04.02.02.01 ROCE Y LIMPIEZA MANUAL m2 130.00 1.38 179.40 0.00 0% 130.00 179.4 100% 179.40
04.02.02.02 TRAZO NIVELACION Y REPLANTEO m2 130.00 1.81 235.30 0.00 0% 130.00 235.3 100% 235.30
04.02.02.03 ENCAUSAMIENTO DE CURSO DE AGUA m3 150.00 5.32 798.00 0.00 0% 150.00 798 100% 798.00
04.02.02.04 EXCAVACION MANUAL BASE GAVION m3 82.88 23.44 1,942.71 0.00 0% 82.88 1942.7072 100% 1,942.71
04.02.02.05 TRASLADO DE PIEDRA DEL LUGAR m3 65.00 38.11 2,477.15 0.00 0% 65.00 2477.15 100% 2,477.15
04.02.02.06 ARMADO DE CAJA DE GAVION 1X1.5X5M und 18.00 1,184.52 21,321.36 0.00 0% 18.00 21321.36 100% 21,321.36
04.02.02.07 ARMADO DE CAJA DE GAVION 1X1X5M und 18.00 898.78 16,178.04 0.00 0% 18.00 16178.04 100% 16,178.04
04.02.02.08 RELLENO DE GAVION CAJA 1X1.5X5M m3 18.00 672.23 12,100.14 0.00 0% 18.00 12100.14 100% 12,100.14
04.02.02.09 RELLENO DE GAVION CAJA 1X1X5M m3 18.00 455.87 8,205.66 0.00 0% 18.00 8205.66 100% 8,205.66
04.02.02.10 ELIMINACION DE MATERIAL EXCEDENTE D:30M m3 6.00 17.24 103.44 0.00 0% 6.00 103.44 100% 103.44
04.02.03 CONFORMACION DE PLATAFORMA 5,199.04 0.00 0.00 441.00 5,199.04 5,199.04
04.02.03.01 LIMPIEZA DE DESLIZAMIENTO DE TALUDES m2 280.00 1.51 422.80 0.00 0% 280.00 422.8 100% 422.80
04.02.03.02 CONFORMACION MANUAL DE PLATAFORMA TERRENO NORMAL m3 137.50 26.02 3,577.75 0.00 0% 137.50 3577.75 100% 3,577.75
04.02.03.03 EXCAVACION MANUAL PLATAFORMA TERRENO ROCOSO m3 15.00 70.13 1,051.95 0.00 0% 15.00 1051.95 100% 1,051.95
04.02.03.04 ELIMINACION DE MATERIAL EXCEDENTE m3 8.50 17.24 146.54 0.00 0% 8.50 146.54 100% 146.54
04.02.04 CANAL DE CONDUCTO CERRADO 11,046.80 0.00 0.00 438.77 11,046.80 11,046.80
04.02.04.01 LIMPIEZA DEL TERRENO MANUAL m2 78.00 1.38 107.64 0.00 0% 78.00 107.64 100% 107.64
04.02.04.02 TRAZO NIVELACION Y REPLANTEO DE ESTRUC. m2 97.50 1.81 176.48 0.00 0% 97.50 176.475 100% 176.48
04.02.04.03 EXCAVACION MANUAL PLATAFORMA TERRENO NORMAL m3 29.57 26.02 769.41 0.00 0% 29.57 769.4114 100% 769.41
04.02.04.04 REFINE DEL TERRENO EXCAVADO m2 65.00 3.11 202.15 0.00 0% 65.00 202.15 100% 202.15
04.02.04.05 CAMA DE APOYO PARA TUBERIAS e= 10 cm m 65.00 7.01 455.65 0.00 0% 65.00 455.65 100% 455.65
04.02.04.06 SUMINISTRO Y TENDIDO TUBERIA PVC-UF NTPISO 1452 D=315MM PN8 m 65.00 127.89 8,312.85 0.00 0% 65.00 8312.85 100% 8,312.85
PRESUPUESTO MES 1 MES 2 MES 3 MES4
ITEM DESCRIPCION TOTAL
UND CANT P.U. PARCIAL METRADO COSTO % METRADO COSTO % METRADO COSTO % METRADO COSTO %
04.02.04.07 RELLENO CON MATERIAL PROPIO COMPACTADO SELECCIONADO m3 35.75 21.09 753.97 0.00 0% 35.75 753.9675 100% 753.97
04.02.04.08 CONCRETO f'c=175 kg/cm2 PARA ANCLAJES m3 0.45 501.23 225.55 0.00 0% 0.45 225.5535 100% 225.55
04.02.04.09 ELIMINACION DE MATERIAL EXCEDENTE m3 2.50 17.24 43.10 0.00 0% 2.50 43.1 100% 43.10
05 ACTIVO N°03: CAMARAS DE CONTROL Y CARGA 16,578.51 0.00 0.00 180.60 16,578.51 16,578.51
05.01 CAMARAS DE CONTROL Y CARGA ALBAZUYOC BAJA 5,487.55 0.00 0.00 74.80 5,487.55 5,487.55
05.01.01 LIMPIEZA EN CAMARA m3 46.80 23.44 1,096.99 0.00 0% 46.80 1096.992 100% 1,096.99
05.01.02 REPARACION DE FISURAS GRIETAS Y JUNTAS m2 15.00 10.55 158.25 0.00 0% 15.00 158.25 100% 158.25
05.01.03 ELIMINACION DE MATERIAL EXCEDENTE D:30M m 2.00 17.24 34.48 0.00 0% 2.00 34.48 100% 34.48
05.01.04 REPOSICION TAPA DE CONCRETO und 5.00 297.91 1,489.55 0.00 0% 5.00 1489.55 100% 1,489.55
05.01.05 REPOSICION DE COMPUERTA DE DISTRIBUCION und 6.00 451.38 2,708.28 0.00 0% 6.00 2708.28 100% 2,708.28
05.02 CAMARAS DE CONTROL Y CARGA TEREBINTO 11,090.96 0.00 0.00 105.80 11,090.96 11,090.96
05.02.01 LIMPIEZA EN CAMARA m3 46.80 23.44 1,096.99 0.00 0% 46.80 1096.992 100% 1,096.99
05.02.02 REPARACION DE JUNTAS, FISURAS Y GRIETAS m2 15.00 10.55 158.25 0.00 0% 15.00 158.25 100% 158.25
05.02.03 ELIMINACION DE MATERIAL EXCEDENTE D:30M m 2.00 17.24 34.48 0.00 0% 2.00 34.48 100% 34.48
05.02.04 SUMINIST E INSTALACION DE ACCESORIOS DE D=4" und 5.00 558.09 2,790.45 0.00 0% 5.00 2790.45 100% 2,790.45
05.02.05 SUMINIST E INSTALACION DE ACCESORIOS DE D=3" und 6.00 369.09 2,214.54 0.00 0% 6.00 2214.54 100% 2,214.54
05.02.06 SUMINIST E INSTALACION DE ACCESORIOS DE D=2" und 7.00 183.11 1,281.77 0.00 0% 7.00 1281.77 100% 1,281.77
05.02.07 SUMINIST E INSTALACION DE ACCESORIOS DE D=1" und 8.00 122.13 977.04 0.00 0% 8.00 977.04 100% 977.04
05.02.08 DESMONTAJE Y TAPAS METALICAS und 8.00 43.19 345.52 0.00 0% 8.00 345.52 100% 345.52
05.02.09 COLOCACION Y TAPAS METALICAS und 8.00 273.99 2,191.92 0.00 0% 8.00 2191.92 100% 2,191.92
06 SALUD Y SEGURIDAD 14,747.91 0.00 0.00 6.00 14,747.91 14,747.91
06.01 RECURSOS E IMPLENTOS DE SEGURIDAD (EPPs) glb 2.00 1,902.00 3,804.00 0.00 0% 2.00 3804 100% 3,804.00
06.02 RECURSOS SANITARIOS Y EMERGENCIAS glb 1.00 3,880.00 3,880.00 0.00 0% 1.00 3880 100% 3,880.00
06.03 SEÑALIZACION TEMPORAL EN OBRA glb 1.00 806.91 806.91 0.00 0% 1.00 806.91 100% 806.91
06.04 IMPLEMENTACION DE MEDIDAS DE PREVENCION CONTROL DE COVID-19 glb 1.00 3,368.00 3,368.00 0.00 0% 1.00 3368 100% 3,368.00
06.05 CONTROL Y MONITOREO SSOMA mes 1.00 2,889.00 2,889.00 0.00 0% 1.00 2889 100% 2,889.00
07 MITIGACION DE IMPACTO AMBIENTALES 18,263.66 0.00 0.00 12.00 18,263.66 18,263.66
07.01 REVEGETACION EN AREAS INTERVENIDAS Y AFECTADAS ha 4.00 3,743.91 14,975.64 0.00 0% 4.00 14975.64 100% 14,975.64
07.02 LIMPIEZA Y RECOJO DE RESIDUOS día 5.00 104.97 524.85 0.00 0% 5.00 524.85 100% 524.85
07.03 CAPACITACION Y SENSIBILIZACION AMBIENTAL glb 2.00 738.80 1,477.60 0.00 0% 2.00 1477.6 100% 1,477.60
07.04 REMOCION Y DISPOSICION FINAL DE RESIDUOS glb 1.00 1,285.57 1,285.57 0.00 0% 1.00 1285.57 100% 1,285.57
08 FLETE 22,780.48 13,524.08 9,256.40 22,780.47
08.01 FLETE TERRESTRE ECHARATI - TEREBINTO glb 1.00 4,267.68 4,267.68 1.00 4,267.68 100% 0.00 0 0% 4,267.68
08.02 ACARREO MATERIAL DISTANCIA 200 M m3 31,354.23 0.20 6,270.85 15,677.12 3,135.42 50% 15677.12 3135.423 50% 6,270.85
08.03 ACARREO AGREGADO DISTANCIA 200 M m3 61,209.74 0.20 12,241.95 30,604.87 6,120.97 50% 30604.87 6120.974 50% 12,241.95

COSTO DIRECTO 313,228.07 0.00 0% 171,834.56 55% 141,393.52 45% 0.00 0% 313,228.07
GASTOS GENERALES 16.71% 52,354.36 0% 26177.1796 50% 26,177.18 50% 0.00 0% 52,354.36
GASTOS SUPERVISION 4.38% 16,000.00 0% 8000.00 50% 8,000.00 50% 0.00 0% 16,000.00
GASTOS DE EXPEDIENTE + SUP. EST. 4.74% 14,831.42 14,831.42 100% 0.00 0% 0.00 0% 0.00 0% 14,831.42
GASTOS DE LIQUIDACION 2.95% 9,252.31 0.00 0% 0.00 0% 0.00 0% 9,252.31 100% 9,252.31
PRESUPUESTO TOTAL DE LA INFRAESTRUCTURA 405,666.16 14,831.42 4% 206,011.74 51% 175,570.70 43% 9,252.31 2% 405,666.16

4.38%