07.01.04 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQ. 10M3, D=10KM m3 299.98 37.35 11,204.25 0.00 100% 11,204.25 0.00
07.01.05 CONFORMACION Y COMPACTACION A NIVEL DE SUBRASANTE m2 223.61 7.48 1,672.60 0.00 100% 1,672.60 0.00
07.01.06 BASE DE AFIRMADO H=0.15 m m2 223.61 15.38 3,439.12 0.00 100% 3,439.12 0.00
07.02 LOSAS VEREDAS Y RAMPAS DE CONCRETO 4,405.61
07.02.01 VEREDA DE CONC. PREMEZALDO f'c=175 kg/cm2 E=0.10, INC. ENC. DES. m3 8.17 420.78 3,437.77 0.00 100% 3,437.77 0.00
07.02.02 ACABADO SEMI PULIDO EN VEREDAS Y RAMPAS m2 81.74 8.24 673.54 0.00 100% 673.54 0.00
07.02.03 CURADO DE CONCRETO m2 81.74 1.55 126.70 0.00 100% 126.70 0.00
07.02.04 JUNTAS DE DILATACION EN VEREDAS m 20.82 8.05 167.60 0.00 100% 167.60 0.00
07.03 SARDINELES DE CONCRETO 252,357.71
07.03.01 SARDINELES DE CONCRETO SUMERGIDO FC=175 KG/CM2 (0.30X0.15) INC. m 161.04 28.98 4,666.94 0.00 100% 4,666.94 0.00
07.03.02 SARDINELES PERALTADO DE CONCRETO SUMERGIDO FC=175 KG/CM2 m 3,004.52 57.73 173,450.94 0.00 94% 162,762.88 6% 10,688.06
07.03.03 SARDINELES PERALTADO DDE CONCRETO SUMERGIDO FC=175 KG/CM2 m 1,012.67 68.05 68,912.19 0.00 0.00 100% 68,912.19
07.03.04 CURADO DE CONCRETO CON ADITIVO m2 1,229.31 2.00 2,458.62 0.00 0.00 100% 2,458.62
07.03.05 JUNTA DE DILATACION PARA SARDINELES m 415.80 6.90 2,869.02 0.00 0.00 100% 2,869.02
07.04 VEREDAS DE ADOQUINES DE CONCRETO 14,619.84
07.04.01 CONFORMACION Y COMPACTACION A NIVEL DE SUBRASANTE m2 141.83 7.48 1,060.89 0.00 0.00 100% 1,060.89
07.04.02 BASE DE AFIRMADO H=0.15 m m2 141.83 15.38 2,181.35 0.00 0.00 100% 2,181.35
07.04.03 CAMA DE ARENA h=0.05 M m2 141.83 17.45 2,474.93 0.00 0.00 100% 2,474.93
07.04.04 COLOCACION DE ADOQUINES DE CONCRETO INC. SELLO DE ARENA FINA m2 141.83 62.77 8,902.67 0.00 0.00 100% 8,902.67
08 SEÑALIZACION VIAL - CICLOVIA 134,145.24
08.01 PINTURA TRAFICO (SIN MICROESFERAS) 68,719.81
08.01.01 PINTURA EN SARDINELES PERALTADO C/EQUIPO m2 1,984.95 21.41 42,497.78 0.00 75% 31,907.35 25% 10,590.43
08.01.02 PINTURA EN PAVIMENTOS (FLECHAS Y SIMBOLOS) SIN MICROESFERAS m2 545.27 48.09 26,222.03 0.00 0.00 100% 26,222.03
08.02 PINTURA ANTIDERRAPANTE (CON MICROESFERAS) 22,037.65
08.02.01 PINTURA ROJA EN SUPERFICIE DE CRUCES CICLISTAS m2 303.67 33.86 10,282.27 0.00 100% 10,282.27 0.00
08.02.02 PINTURA DE PATAS DE ELEFANTE EN CRUCES CICLISTAS m2 181.75 48.09 8,740.36 0.00 58% 5,044.18 42% 3,696.18
08.02.03 PINTURA DE SIMBOLOS DE BICICLETA EN CRUCES CICLISTAS m2 54.62 55.20 3,015.02 0.00 0.00 100% 3,015.02
08.03 ELEMENTOS SEGREGADORES Y DE SEGURIDAD 27,634.34
08.03.01 TACHAS REFLECTIVAS DE 0.10X0.09X1.6CM. COLOR BLANCO und 74.00 12.89 953.86 0.00 0.00 100% 953.86
08.03.02 TACHAS REFLECTIVAS DE 0.20X0.11X5CM. COLOR ROJO und 460.00 33.26 15,299.60 0.00 0.00 100% 15,299.60
08.03.03 SUMINISTRO E INSTALACION DE BOLARDOS DE CONCRETO INC. ACABADO und 34.00 183.38 6,234.92 0.00 0.00 100% 6,234.92
08.03.04 SUMINISTRO E INST. DE REDUCTOR DE VELOCIDAD CON ASFALTO EL m2 74.00 69.54 5,145.96 0.00 0.00 100% 5,145.96
08.04 SEÑALIZACION VERTICAL 15,753.44
08.04.01 SEÑAL REGLAMENTARIA R-42 0.90x0.60 m CON POSTE und 12.00 333.34 4,000.08 0.00 0.00 100% 4,000.08
08.04.02 SEÑAL REGLAMENTARIA P-46A, 0.60x0.60 m CON POSTE und 4.00 373.13 1,492.52 0.00 0.00 100% 1,492.52
08.04.03 SEÑAL PREVENTIVA P-46B 0.60x0.60m CON POSTE und 13.00 349.70 4,546.10 0.00 0.00 100% 4,546.10
08.04.04 SEÑAL INFORMATIVA 0.90x0.60m CON POSTE und 1.00 333.34 333.34 0.00 0.00 100% 333.34
08.04.05 SEÑAL PREVENTIVA P-48B 0.60x0.60m CON POSTE und 15.00 358.76 5,381.40 0.00 0.00 100% 5,381.40
09 EQUIPAMIENTO Y MOBILIARIO URBANO 18,276.49
09.01 MODULO PARA RECICLAJE INC. ESTRUCTURA MET. TACHOS Y DADOS und 14.00 772.38 10,813.32 0.00 0.00 100% 10,813.32
09.02 EQUIPOS DE MINI GIMNASIO glb 1.00 1,508.23 1,510.99 0.00 0.00 100% 1,510.99
CRONOGRAMA VALORIZADO
CREACION DE LA CICLOVIA EN LA AV. PRINCIPAL, SURQUILLO DEL DISTRITO DE SURQUILLO-PROVINCIA DE LIMA-
Proyecto:
DEPARTAMENTO DE LIMA-C.U.I. N° 2525692
09.03 SUMINISTRO E INSTALACION DE BARANDA PARA FIJACION DE BICICLETA und 5.00 406.68 2,033.40 0.00 0.00 100% 2,033.40
09.04 SUMINISTRO E INSTALACION DE ESTACION PARA REPARACION DE und 1.00 419.94 419.94 0.00 0.00 100% 419.94
09.05 SUMINISTRO E INSTALACION DE REJA METALICA DE PROTECCION m 8.37 290.00 2,427.30 0.00 0.00 100% 2,427.30
09.06 SUMINISTRO E INSTALACION DE BANCA DE CONCRETO INC. ACAB. und 1.00 1,071.54 1,071.54 0.00 0.00 100% 1,071.54
10 TRATAMIENTO DE AREAS VERDES 257,824.92
10.01 MOVIMIENTO DE TIERRAS 61,372.45
10.01.01 CORTE DE TERRENO MANUAL A NIV. DE SUB RASANTE m3 545.35 46.15 25,167.90 8% 2,095.14 92% 23,072.76 0.00
10.01.02 ACARREO DE MATERIAL EXCEDENTE CON EQUIPO m3 681.69 15.76 10,743.43 0.00 87% 9,397.70 13% 1,345.73
10.01.03 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQ. 10M3, D=10KM m3 681.69 37.35 25,461.12 0.00 0.00 100% 25,461.12
10.02 JARDINERIA 169,783.22
10.02.01 PREPARACION DE TERRENO m2 5,453.51 14.41 78,585.08 0.00 95% 74,764.70 5% 3,820.38
10.02.02 PODA DE ARBOLES glb 1.00 1,009.70 1,009.70 0.00 0.00 100% 1,009.70
10.02.03 TRATAMIENTO DE RAICES glb 1.00 1,666.92 1,666.92 0.00 0.00 100% 1,666.92
10.02.04 SEMBRADO DE GRASS EN CHAMPA m2 5,453.00 16.11 87,847.83 0.00 0.00 100% 87,847.83
10.02.05 SEMBRADO DE ARBOLES FICUS und 5.00 101.98 509.90 0.00 0.00 100% 509.90
10.02.06 MACISO DE FLORES m2 1.50 109.19 163.79 0.00 0.00 100% 163.79
10.03 PROTECCION Y MANTENIMIENTO DE AREAS VERDE 26,669.25
CRONOGRAMA VALORIZADO
CREACION DE LA CICLOVIA EN LA AV. PRINCIPAL, SURQUILLO DEL DISTRITO DE SURQUILLO-PROVINCIA DE LIMA-
Proyecto:
DEPARTAMENTO DE LIMA-C.U.I. N° 2525692
10.03.01 RIEGO Y PROTECCION PARA MANTENIMIENTO DE ARBOLES DURANTE LA m2 337.50 79.02 26,669.25 100% 26,669.25 0.00 0.00
11 VARIOS 13,092.49
11.01 NIVELACION DE TAPAS DE CAJA DE VALVULAS DE AGUA und 2.00 39.82 79.64 0.00 100% 79.64 0.00
11.02 NIVELACION DE TAPA DE POZO A TIERRA und 1.00 39.82 39.82 0.00 100% 39.82 0.00
11.03 REHUBICACION DE CAJUELA DE VALVULAS-AGUA glb 1.00 59.63 59.63 0.00 100% 59.63 0.00
11.04 PLACA RECORDATORIA, INC. MURETE und 1.00 1,307.65 1,307.65 0.00 0.00 100% 1,307.65
11.05 SUMNISTRO E INST. DE CAJA DE REGISTRO 0.90X0.90X0.80, CONC. F¨C=210 und 9.00 391.01 3,519.09 0.00 100% 3,519.09 0.00
11.06 LIMPIEZA GENERAL DE OBRA m2 8,512.27 0.95 8,086.66 0.00 0.00 100% 8,086.66
12 MITIGACION AMBIENTAL 5,147.03
12.01 PLAN DE MITIGACION AMBIENTAL glb 1.00 5,147.03 5,147.03 33% 1,715.68 33% 1,715.68 33% 1,715.68