Calendario de Insumos
Calendario de Insumos
Calendario de Insumos
CREACION DE LOS SERVICIOS DE RECREACION Y ESPARCIMIENTO EN EL PARQUE N°1 DE LA ASOCIACION PRO VIVIENDA LOS LIBERTADORES DISTRITO DE SAN MARTIN DE PORRES - PROVINCIA DE LIMA -
PROYECTO: DEPARTAMENTO DE LIMA: CUI 2532238
FECHA BASE: dic-21
MONEDA: SOLES
MATERIALES
8 CLAVOS C/C PROMEDIO KG 480.12 6.90 3,312.83 4.83 0.00 3,283.44 24.56
9 PIEDRA MEDIANA DE 6" M3 0.13 33.05 4.28 4.28 0.00 0.00 0.00
10 HORMIGON M3 27.40 32.70 895.87 16.20 682.31 197.36 0.00
11 CEMENTO PORTLAND TIPO I (42.5KG) BLS 331.41 20.60 6,827.04 5,622.77 213.21 711.97 279.09
12 MADERA TORNILLO P2 6,794.97 5.80 39,410.84 14,766.34 24,244.73 164.71 235.06
13 TRIPLAY LUPUNA 1.20 x 2.40m x 12mm PLN 6.00 52.00 312.00 312.00 0.00 0.00 0.00
14 LIJA PARA MADERA UND 3.00 1.10 3.30 3.30 0.00 0.00 0.00
15 PERNO 5/8" x 10" CON TUERCA UND 20.00 3.50 70.00 70.00 0.00 0.00 0.00
16 ARANDELA 5/8" UND 20.00 0.65 13.00 13.00 0.00 0.00 0.00
17 GIGANTOGRAFIA M2 17.28 20.00 345.60 345.60 0.00 0.00 0.00
18 AGUA M3 1,060.78 11.93 12,655.13 3,905.82 214.21 492.89 8,042.21
19 TRIPLAY LUPUNA 1.20 x 2.40m x 4mm PLN 14.60 20.50 299.30 299.30 0.00 0.00 0.00
20 PERFIL 4MM DE 2.44 x 1.10m PZA 18.00 40.36 726.48 726.48 0.00 0.00 0.00
21 PLANCHA FIBROCEMENTO CANALON 6.5 mm 0.96 x 6.20 m PZA 0.68 153.50 104.38 104.38 0.00 0.00 0.00
22 BISAGRA CAPUCHINO ALUMINIO 3 1/2"x 3 1/2" UND 8.00 22.00 176.00 176.00 0.00 0.00 0.00
23 SUMINISTRO E INTALACION DE CERCO PROVISIONAL M 416.11 16.69 6,944.88 6,944.88 0.00 0.00 0.00
24 YESO DE 28 KG BOL 55.35 15.00 830.30 830.30 0.00 0.00 0.00
25 ESMALTE SINTETICO GAL 19.77 30.55 603.94 603.94 0.00 0.00 0.00
26 CORDEL KG 19.77 12.50 247.12 247.12 0.00 0.00 0.00
27 ESTACA DE MADERA P2 138.38 6.20 857.98 857.98 0.00 0.00 0.00
28 WINCHA UND 19.77 30.00 593.07 593.07 0.00 0.00 0.00
29 BARRENO 5´ X 7/8 UND 0.07 274.41 19.21 19.21 0.00 0.00 0.00
30 PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO GLB 1.00 2,000.00 2,000.00 563.64 509.09 563.64 363.64
31 PLAN COVID - 19 GLB 1.00 1,000.00 1,000.00 281.82 254.55 281.82 181.82
CALENDARIO DE MATERIALES
CREACION DE LOS SERVICIOS DE RECREACION Y ESPARCIMIENTO EN EL PARQUE N°1 DE LA ASOCIACION PRO VIVIENDA LOS LIBERTADORES DISTRITO DE SAN MARTIN DE PORRES - PROVINCIA DE LIMA -
PROYECTO: DEPARTAMENTO DE LIMA: CUI 2532238
FECHA BASE: dic-21
MONEDA: SOLES
EQUIPO
285 HERRAMIENTAS MANUALES %MO 0.00 0.00 17,705.21 8,899.15 3,264.78 2,394.08 3,147.20
286 NIVEL TOPOGRAFICO HM 286.65 10.15 2,909.52 2,909.52 0.00 0.00 0.00
287 ESTACION TOTAL HM 286.65 15.50 4,443.12 4,443.12 0.00 0.00 0.00
288 VOLQUETE 6X4 330HP 10M3 HM 0.13 223.25 28.58 28.58 0.00 0.00 0.00
289 EQUIPO DE CORTE HM 2.13 28.00 59.74 59.74 0.00 0.00 0.00
290 COMPRESORA NEUMATICA 87 HP 250-330 PCM HM 1.40 75.44 105.62 105.62 0.00 0.00 0.00
291 MARTILLO NEUMATICO 25-29 KG HM 2.80 4.02 11.26 11.26 0.00 0.00 0.00
292 MINICARGADOR 70 HP 0.5 YD3 HM 187.32 65.58 12,284.12 12,284.12 0.00 0.00 0.00
293 MARTILLO HIDRAULICO (para minicargador) HM 187.32 20.00 3,746.30 3,746.30 0.00 0.00 0.00
294 CARGADOR SOBRE LLANTAS 125-155 HP 3 YD3 HM 264.09 244.78 64,644.06 54,732.46 2,933.61 6,977.99 0.00
295 CAMION VOLQUETE 6X4 330 HP 15 M3 HM 537.19 288.03 154,725.63 131,256.66 10,366.20 13,102.77 0.00
296 CAMION CISTERNA 4X2 AGUA 145-165 HP 2000 GAL HM 60.22 147.10 8,857.70 7,784.00 0.00 1,073.70 0.00
297 RODILLO LISO VIBRATORIO MANUAL 10.8 HP 0.8-1.1 TNN HM 36.21 165.00 5,975.01 4,770.66 0.00 1,204.35 0.00
298 CAMION CISTERNA AGUA 4X2 145-165 HP 2000 GAL HM 13.80 128.96 1,779.66 56.92 0.00 1,722.74 0.00
CALENDARIO DE MATERIALES
CREACION DE LOS SERVICIOS DE RECREACION Y ESPARCIMIENTO EN EL PARQUE N°1 DE LA ASOCIACION PRO VIVIENDA LOS LIBERTADORES DISTRITO DE SAN MARTIN DE PORRES - PROVINCIA DE LIMA -
PROYECTO: DEPARTAMENTO DE LIMA: CUI 2532238
FECHA BASE: dic-21
MONEDA: SOLES