JHD0010 Empalmes
JHD0010 Empalmes
JHD0010 Empalmes
[ A1 ] SIMBOLOGIA
V
.6
PUY POSTE DE TELMEX
TERMINAL EXISTENTE
619.6 mts a C.D.
A1 20 [ 2
TERMINAL EXISTENTE 20 Ps.
C R
70
CABLE AEREO EXISTENTE
R EB
.9
70 E EXISTE SISTEMA DE TIERRA CABLE MURAL EXISTENTE
.9 B g-3 SI NO
g- )(
3) 10 CAJA DE EMPALME EXISTENTE
(1 )A
0) 1 EMPALME SUBTERRANEO EXISTENTE
A ] -CONEXION ROTA VALOR DEL SISTEMA DE TIERRA: 6.51 Ω
1 -TAPA INT. ROTA
CONEXION A TIERRA EXISTENTE
Ωm
[ A2 ]
VALOR DE RESISTENCA DE SUELO:
A2 PS EN RESERVA EXISTENTES.
5
UNI PUY
E.
AV
548.7 mts a C.D. DESMONTAJE
4
)A
(0 .4 UCN PRESURIZADO UCN CABLE MURAL PROYECTADO
.4) )(0
-3
CANTIDAD DE CABLE PROYECTADO EMPALE DE PLOMO PL CABLE SUBTERRANEO PROY.
Bg
SCReEBh-3 (1 3)( 140
3) AC .4
E
EMPALE XAGA XA
(A R
6
CAJA DE EMPALME PROYECTADA
CR
Mts
E.
CAN CUN CAP
C E CUN
15 RE Bg
Mts
(A
AV
CIERRE SUBTERRANEO PROYECTADO
CAJA EMPL. PLASTICO CP
Bg -3)A
.6
Mts 6.6
9)
59
Mts CAJA DE LAMINA
)(0
CL
-3 1.2 CONEXION A TIERRA PROYECTADA
Mts )A
.4
1.2 ]
EMPALME BARGOA EBG
(0
Mts
B1 WP
PS EN RESERVA PROYECTADOS
10
Mts WESTERN PACIFIC
RIEL DIN
Mts
Mts A3 S/ ACCESO 383.1 mts a C.D.
CIERRE MOREL CM
1
TERMINAL PLASTICA TP
)B
Mts (0
A4c .4) TF - PP
3
Mts TERMINAL RAYCHEMENT RAY
g-
S/ ACCESO PUY (9
.3 B
Mts Mts 8) T = TIPO DE PRUEBA
75 RE
TERMINAL UNIVERSAL UNI
Mts 414.5 mts a C.D. 10 (A
SP F = TIPO DE FALLA
C
0.1
(A
Mts
B) P = NÚMERO DE PAR DE STRIP
5)
Mts A1
)(0
Mts
PR - 3 O TERMINAL
.4
V
(0
10
.8
-A
-MOD. 7 ROTO PRUEBAS ELECTRICAS
-SIN CONTINUIDAD DE PANTALLA REALIZADAS
F1 -MOD. 1,5,7 ROTO (M) = PRUEBAS MASIVAS
PUY A5 (E) = PRUEBAS CON DYNATEL
314.7 mts a C.D. INT. PUY
S/ MANGA PST 307.9 mts a C.D.
EMPALME SUELTO FALLAS LOCALIZADAS
(R) = FALLA RESISTIVA
30 30( (C) = FALLA CAPACITIVA
(0 0.4
.4)
(0 )(98 -MOD. 5.8 ROTO
3)
10 (A )(AS -BASE ROTA
(0 CR PB -SIN CONTINUIDAD DE PANTALLA
.4)
[ ]
(A EB )A
4
-CONEX. A TIERRA ROTA 10 S g- 1-3 B2
PB
E.
3)
10
6.
6 )F A4 PUY
2.
AV
4
1 .5. 205.4 mts a C.D. -BASE ROTA
B1
[ B3 ]
INT.
PST
2
PUY
E.
PR B2 205.4 mts a C.D.
AV
30
L. UNI (0 50(
9 10(0.4)(13)(ACREBg-3)F2 B3
.4) 0.
(0 4)(
PST 3) 98
37.6 UNI (A )(
3
CR AS
)F
20 EB PB 30(0.4)(03)(ACREBg-3)B4.5.C1
PB
F2
8) )F2
(0
10
g- )A
90 (AS
.
)(9 0
20 4)(0
11.4
4.
PUY PST 3)
.4 )(1
5
B1
[ B5 ]
(0 3)
.5
(0 -3
-3 -BASE ROTA
F4 .4) (A
[ F2 ]
20
10 Bg
.4 PUY 8
CR
PUY
10
)(0 10 )(A EB
4.
PUY 216.8 mts a C.D. 101.3
(A
2.2 S
5
3)
(A PB g-3 -MOD. 3 ROTO 124.4 mts a C.D.
3)
[ C1 ]
.5
CR
12
3
2.
EB
F5 -MOD. 5,7 ROTO
6
(0
1
g-
20
10 UNI C1
.C
3) 2.2 PUY 124.4 mts a C.D.
.B
(1 [ 20(0.4)(03)(ACREBg-3)(10)F2 ]
7 UNI
A
0) S/ MANGA 105.9 mts a C.D.
0)
D4 37.6 6 10
)(9
EMPALME SUELTO (0
2 B5 .4)
B
INT. [7 4
SP
0 80
. 38 (A
[ 1 (0.4 UNI .2 S
(A
-CONEXION ROTA F3
1 10 5.9
PST
[CUN] 00 )( PB
8)
10
-BASE ROTA )
9
(0 03 B4
)(9
5.
[ D3 ]
-TAPA INT. ROTA PST
4
[ D5 ]
(0
EB )D.G -3)E
0.
(9
8) CR
[ B4 ]
.4
0(
3) 2
(A EB
20
21 C PB Bg
PUY CUN
5
H
3) SP g-
(A S E
D3 (A PUY
3) (A CR
B)
2
3
8. R
D1-
)(0 8)
PUY
10 0(0 .4)(
3 D5 01 30(0.4)(03)(ACREBg-3)G3-5
3
.3
7 (0
10(0.4)(03)(ACREBg-3)D2
.B
20 UNI .D
1.5
CL
50
(
A
83.5 0.
PST C G4.5 -MOD. 6.9 ROTO
4) XU-30 L.
0
0
0 E.F
10
30 (03 10
H
(0 )(A PUY 7
G.
JH
10 00
.4
)(0 CR D
1
.7
91 30
56 3) EB 30 3. 4.3 1 0 1 -1 (0
.7 (A g
SP -3)
PST (0
.4) 4- m 0 0 [ XA-U30 ] 9
CUN
.4)
B) D4 70 ( 50(0.4)(03)(ACREBg-3)(10)E1-4 (0 7H t 1
4 s. A 8 4 XA U 30
(0
3)
D1 .5 0. 3) +3 (A
-3 INT. 4)(0 46.8
PST
(A
CR Ø4 OC CR
D
9) 5 EB
B)
EB
UNI [
E5 ]
S/ MANGA PST (A 100(0.4)(SCREBH)C.H 47 g-
E5
SP
CR g- .3
3)
(A
3) 5.0 (2
E3 EB 52
G1 0
8)
50 PUY .0 )G
12 g-3 10 INT.
(9
PUY 54 (0 .2 .H 200(0.4)(SCREBH)(100)F.G 3
.8
4)
1
(0
[ ]
2 ] 1
-MOD. 1.2.3 ROTO 4 48
.7 PB G3
)E Bg- 3)E PST G1.H1 399.8 mts a C.D. PUY
DAÑO 2 3) 1. PUY
]
48
E 1 2 411.5 mts a C.D.
92.6 mts a C.D.
POR CONSTRUCCION ]
.7
E2 CL
-MOD. 3.7 ROTO
326.4 mts a C.D.
PST UNI
[ ] E1
PUY
G1 H1 L.
[ E2 ]
UNI UNI 8
3