010039 CAMION CISTERNA 4x2 (AGUA 2000 GAL) HM 60.00 58.06 3,483.60 3,483.74
010040 CAMION VOLQUETE 15 M3 HM 70.00 83.84 5,868.80 5,876.19
020105 CLAVOS PARA MADERA C/C 3" KG 3.80 75.38 286.44 284.78 020105 CLAVOS PARKG
020409 ALAMBRE NEGRO N°16 KG 3.80 657.23 2,497.47 2,519.42
020410 ALAMBRE NEGRO N°8 KG 3.80 157.13 597.09 597.93 020410 ALAMBRE N KG
021099 CLAVOS KG 3.80 9.88 37.54 33.70 021099 CLAVOS KG
029702 ACERO DE REFUERZO FY=4200 GRADO 60 KG 2.55 11,720.79 ### 29,904.42
029703 ACERO DE REFUERZO FY=4200, ø1" VAR 95.00 7.21 684.95 684.76
029802 NEOPREN0 CM3 0.20 19,050.00 3,810.00 3,810.00
050011 PIEDRA MEDIANA DE 6" M3 20.00 164.22 3,284.40 3,284.40 050011 PIEDRA MEDM3
050104 ARENA GRUESA M3 5.00 26.30 131.50 131.51
053606 GRAVA M3 5.00 53.14 265.70 265.67
102201 AGUA M3 3.00 65.07 195.21 194.69 102201 AGUA M3
130006 ASFALTO RC-250 GLN 12.00 3.50 42.00 41.95
210000 CEMENTO PORTLAND TIPO I (42.5KG) BOL 19.50 2,211.51 ### 43,125.42 210000 CEMENTO PO
BOL
290404 PLACA RECORDATORIA UND 450.00 1.00 450.00 450.00
300201 YESO DE 28 Kg BOL 6.00 22.47 134.82 134.80 300201 YESO DE 28BOL
309980 WINCHA UND 15.00 6.74 101.10 101.10 309980 WINCHA UND
320029 DESVIO DE RIO GLB 3,200.00 1.00 3,200.00 3,200.00 320029 DESVIO DE GLB
320030 FLETE DE TRANSPORTE DE MATERIALES (VER ANEXO) GLB 8,034.00 1.00 8,034.00 8,034.00 320030 FLETE DE GLB
340001 GUIA M 1.50 557.52 836.28 836.28
340002 CORDON DETONANTE M 0.50 297.34 148.67 148.67
340003 FULMINANTE UND 1.00 557.52 557.52 557.52
340004 DINAMITA KG 12.00 92.92 1,115.04 1,115.04
340005 BARRENO DE 7/8" X 8 PIES UND 400.00 1.12 448.00 446.02
340006 COMPRESORA NEUMATICA 196 HP. 600-690 PCM HM 110.00 14.87 1,635.70 1,635.39
340007 MARTILLO NEUMATICO DE 25 KG HM 25.00 14.87 371.75 371.68
380000 HORMIGON M3 5.00 349.17 1,745.85 1,747.77 380000 HORMIGON M3
391317 CARTEL DE OBRA UND 500.00 1.00 500.00 500.00 391317 CARTEL DE UND
391501 CAMPAMENTO M2 50.00 24.00 1,200.00 1,200.00 391501 CAMPAMEN M2
391601 LIJAR PARA FIERRO UND 2.00 24.00 48.00 48.00
430103 MADERA TORNILLO P2 2.00 1,657.85 3,315.70 3,315.70 430103 MADERA TOP2
431005 MADERA CORRIENTE P2 1.80 22.47 40.45 44.93 431005 MADERA COP2
431006 MADERA EUCALIPTO EN BRUTO P2 1.20 3,362.00 4,034.40 4,034.40
470032 TOPOGRAFO HH 2.88 44.93 129.40 134.80 470032 TOPOGRAF HH
470102 OPERARIO HH 2.88 1,130.54 3,255.96 3,307.95 470102 OPERARIO HH
470103 OFICIAL HH 2.25 1,148.91 2,585.05 2,585.24 470103 OFICIAL HH
470104 PEON HH 1.88 6,916.96 ### 13,003.83 470104 PEON HH
480111 MEZCLADORA DE CONCRETO DE 9 -11P3 HM 20.00 195.95 3,919.00 3,919.21 480111 MEZCLADORHM
480428 TRANSPORTE DE EQUIPO Y HERRAMIENTAS GLB 3,000.00 2.00 6,000.00 6,000.00 480428 TRANSPORTGLB
488201 CARGADOR FRONTAL HM 120.00 45.43 5,451.60 5,453.42
488202 MOTOBOMBA 10 HP 4" HM 15.00 192.00 2,880.00 2,880.00 488202 MOTOBOMBA
HM
490301 COMPACTADOR VIBR. TIPO PLANCHA 4 HP HM 15.00 15.54 233.10 233.00 490301 COMPACTADHM
490704 VIBRADOR DE CONCRETO 4 HP 2.40" HM 10.00 111.11 1,111.10 1,111.04 490704 VIBRADOR DHM
490750 MOTOSOLDADORA DE 250 AMP. HM 10.00 12.80 128.00 128.00
490893 TRACTOR D6 HM 120.00 93.37 ### 11,202.39
490894 MOTONIVELADORA 125HP HM 110.00 5.44 598.40 604.80
490896 RODILLO LISO VIBR. AUTOPROP. 70-100 HP. 7-9 TN HM 120.00 5.44 652.80 650.16
491901 TEODOLITO HM 5.00 44.93 224.65 224.66 491901 TEODOLITO HM
498802 NIVEL TOPOGRAFICO HM 5.00 44.93 224.65 224.66 498802 NIVEL TO HM
530327 THINER GLN 15.00 0.80 12.00 12.00
540600 PINTURA ANTICORROSIVA GLN 33.00 0.80 26.40 26.40
541190 PINTURA ESMALTE GLN 34.00 12.04 409.36 409.13 541190 PINTURA E GLN
560201 PLANCHA DE ACERO DE 1/4" M2 120.00 7.21 865.20 864.96
654601 SOLDADURA KG 8.00 10.00 80.00 80.00
654701 TUBERIA F.G. 2" M 25.00 108.00 2,700.00 2,700.00
720105 TUBERIA PVC SAP C-7.5 DE 2" M 5.50 7.34 40.37 40.39
795603 DISEÑO DE MEZCLAS UND 300.00 1.00 300.00 300.00
795604 PRUEBA DE LABORATORIO, BRIQUETAS UND 25.00 10.00 250.00 250.00
370101 HERRAMIENTAS MANUALES %MO 610.74 370101 HERRAMIEN%MO
Precio Cantidad Parcial puestado Código Insumo Unidad Precio antidad Parcial upuestado
020105 CLAVOS PARA MADERA C/CKG 3.80 27.48 104.42 103.58
020410 ALAMBRE NEGRO N°8 KG 3.80 54.96 208.85 209.27
3.80 27.48 104.42 103.58 021099 CLAVOS KG 3.80 3.98 15.12 13.58
050011 PIEDRA MEDIANA DE 6" M3 20.00 110.00 2,200.00 2,200.13
3.80 54.96 208.85 209.27 102201 AGUA M3 3.00 35.88 107.64 107.38
3.80 3.98 15.12 13.58 210000 CEMENTO PORTLAND TIPO BOL
I 19.50 1,017.56 19,842.42 19,843.06
300201 YESO DE 28 Kg BOL 6.00 9.06 54.36 54.34
309980 WINCHA UND 15.00 2.72 40.80 40.75
320029 DESVIO DE RIO GLB 3,200.00 1.00 3,200.00 3,200.00
20.00 110.00 2,200.00 2,200.13 320030 FLETE DE TRANSPORTE DEGLB 8,034.00 1.00 8,034.00 8,034.00
380000 HORMIGON M3 5.00 233.90 1,169.50 1,170.78
391317 CARTEL DE OBRA UND 500.00 1.00 500.00 500.00
3.00 35.88 107.64 107.38 391501 CAMPAMENTO M2 50.00 24.00 1,200.00 1,200.00
430103 MADERA TORNILLO P2 2.00 708.16 1,416.32 1,416.32
19.50 1,017.56 19,842.42 19,843.06 431005 MADERA CORRIENTE P2 1.80 9.06 16.31 18.11
470032 TOPOGRAFO HH 2.88 18.11 52.16 54.34
6.00 9.06 54.36 54.34 470102 OPERARIO HH 2.88 245.19 706.15 705.85
15.00 2.72 40.80 40.75 470103 OFICIAL HH 2.25 371.00 834.75 835.06
3,200.00 1.00 3,200.00 3,200.00 470104 PEON HH 1.88 2,961.42 5,567.47 5,566.79
8,034.00 1.00 8,034.00 8,034.00 480111 MEZCLADORA DE CONCRETO
HM 20.00 118.05 2,361.00 2,361.04
480428 TRANSPORTE DE EQUIPO GLB 3,000.00 1.00 3,000.00 3,000.00
488202 MOTOBOMBA 10 HP 4" HM 15.00 128.64 1,929.60 1,929.60
490301 COMPACTADOR VIBR. TIPOHM 15.00 15.54 233.10 233.00
490704 VIBRADOR DE CONCRETO 4HM 10.00 59.03 590.30 590.26
491901 TEODOLITO HM 5.00 18.11 90.55 90.56
498802 NIVEL TOPOGRAFICO HM 5.00 18.11 90.55 90.56
541190 PINTURA ESMALTE GLN 34.00 4.53 154.02 153.96
5.00 233.90 1,169.50 1,170.78 370101 HERRAMIENTAS MANUALE %MO 230.02
500.00 1.00 500.00 500.00
50.00 24.00 1,200.00 1,200.00
11 de 16
CRONOGRAMA DE ADQUISICION DE MATERIALES, BIENES E INSUMOS
PROYECTO: PUENTE LOPEZ
12 de 16
CRONOGRAMA DE ADQUISICION DE MATERIALES, BIENES E INSUMOS
PROYECTO: PUENTE LOPEZ
13 de 16
CRONOGRAMA DE ADQUISICION DE MATERIALES, BIENES E INSUMOS
5.9 22.42
1 450
13.41 80.46
4.02 60.3
557.52 836.28
297.34 148.67
557.52 557.52
92.92 1115.04
1.12 448
14.87 1635.7
14.87 371.75
24 48
13.41 24.138
26.82 77.2416
53.46 153.9648
3011.5 5661.62
1 3000
45.43 5451.6
8.58 85.8
93.37 11204.4
5.44 598.4
5.44 652.8
26.82 134.1
26.82 134.1
0.8 12
0.8 26.4
7.51 255.34
6.7 53.6
72.36 1809
MES 5 MES 6 MES 7 MES 8 MES 9 MES 10 TOTAL
VALOR CANT. VALOR CANT. VALOR CANT. VALOR CANT. VALOR CANT. VALOR CANT. VALOR