CRONOGRAMA DE AVANCE VALORIZADO

OBRA MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E 80659 NUESTRA SEÑORA DE FATIMA DEL CASERIO DE TOGOPON DEL DISTRITO DE CARABAMBA PROVINCIA DE JULCAN DEPARTAMENTO DE LA LIBERTAD

Lugar LA LIBERTAD - JULCAN - CARABAMBA


1 1 2 2 3 3 4 4 5 5 6 6
MES 01 MES 02 MES 03 MES 04 MES 05 MES 06
PRECIO
Item Descripción UNIDAD METRADO TOTAL
UNITARIO S/. Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial

OBRAS PROVISIONALES,TRABAJOS PRELIMINARES,


01
SEGURIDAD Y SALUD EN OBRA, PLAN DE CONTINGENCIA
01.01 CONSTRUCCIONES PROVISIONALES
OFICINAS, TECNICA,SUPERVISION Y COMITE DE SEG. Y
01.01.01 m2 25.00 214.56 25.00 5,364.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,364.000
CONTROL DE CALIDAD
01.01.02 ALMACEN DE OBRA m2 72.00 139.74 72.00 10,061.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10,061.280
01.01.03 CASETA DE GUARDIANÍA m2 10.00 160.61 10.00 1,606.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,606.100
01.01.04 COMEDOR PARA PERSONAL DE OBRA m2 40.00 198.29 40.00 7,931.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7,931.600
01.01.05 CERCO PROVISIONAL DE OBRA CON MALLA RASHELL m2 818.00 15.05 818.00 12,310.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12,310.900

01.01.06 CARTEL DE IDENTIFICACIÓN DE LA OBRA DE 3.60 x 2.40 und 1.00 752.42 1.00 752.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 752.420
PROVISIÓN DE ENERGIA ELÉCTRICA PARA LA
01.01.07 mes 1.00 600.00 1.00 600.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 600.000
CONSTRUCCIÓN
PROVISIÓN DE ENERGIA ELECTRICA PARA PLAN DE
01.01.08 mes 1.00 600.00 1.00 600.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 600.000
CONTINGENCIA
01.02 TRABAJOS PRELIMINARES
01.02.01 REMOCIONES
01.02.01.01 REMOCIONES DE PUERTAS m2 26.91 8.91 0.00 0.00 26.91 239.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 239.770
01.02.01.02 REMOCION DE PORTON m2 9.66 11.88 0.00 0.00 9.66 114.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 114.760
01.02.01.03 REMOCION DE VENTANAS m2 19.35 11.88 0.00 0.00 19.35 229.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 229.880
01.02.01.04 DESMONTAJE DE TECHO CALAMINA m2 709.99 7.90 0.00 0.00 709.99 5,395.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,395.920
01.02.01.05 DESMONTAJE DE ARMAZÓN DE MADERA m2 709.99 7.90 0.00 0.00 709.99 5,395.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,395.920
01.02.01.06 DESMONTAJE DE CIELO RASO DE TRIPLAY m2 421.59 5.27 0.00 0.00 421.59 2,137.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,137.460
01.02.01.07 DESMONTAJE DE REJILLA PARA CANALETA m 12.36 4.45 0.00 0.00 12.36 55.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 55.000
01.02.01.08 DESMONTAJE DE INODOROS und 7.00 44.52 0.00 0.00 7.00 311.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 311.640
01.02.01.09 DESMONTAJE DE LAVATORIOS und 1.00 44.52 0.00 0.00 1.00 44.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 44.520
01.02.01.10 DESMONTAJE DE ASTA DE BANDERA und 1.00 17.81 0.00 0.00 1.00 17.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.810
01.02.01.11 CLAUSURA DE INSTALACIONES SANITARIAS glb 1.00 209.10 0.00 0.00 1.00 209.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 209.100
01.02.01.12 CLAUSURA DE INSTALACIONES ELECTRICAS glb 1.00 178.07 0.00 0.00 1.00 178.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 178.070
01.02.01.13 REMOCION DE ARBOLES und 17.00 59.35 0.00 0.00 17.00 1,008.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,008.950
01.02.02 DEMOLICIONES
01.02.02.01 DEMOLICIÓN DE CIMIENTOS DE BARRO CON PIEDRA m3 125.50 10.66 0.00 0.00 125.50 1,337.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,337.830
01.02.02.02 DEMOLICION DE CONTRAFUERTE DE ADOBE m3 125.50 10.66 0.00 0.00 125.50 1,337.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,337.830
01.02.02.03 DEMOLICION DE MURO DE ADOBE m2 1,514.64 7.65 0.00 0.00 1,514.64 11,587.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11,587.000
01.02.02.04 DEMOLICION DE URINARIOS Y BEBEDEROS DE CONCRETO m 4.54 117.37 0.00 0.00 4.54 532.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 532.860

01.02.02.05 DEMOLICIÓN DE PISO DE CONCRETO INCLUYE FALSO PISO m2 421.59 20.85 0.00 0.00 421.59 8,790.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8,790.150
01.02.02.06 DEMOLICION DE GRADA DE CONCRETO m2 47.20 19.57 0.00 0.00 47.20 923.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 923.700
01.02.02.07 DEMOLICIÓN DE BANCAS DE CONCRETO m 8.70 20.85 0.00 0.00 8.70 181.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 181.400
01.02.02.08 DEMOLICION DE PILETA DE CONCRETO/AGUA und 1.00 29.33 0.00 0.00 1.00 29.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 29.330

01.02.02.09 DEMOLICION DE BUZON DE CONCRETO/DESAGUE und 1.00 293.40 0.00 0.00 1.00 293.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 293.400

01.02.02.10 DEMOLICION DE BUZON DE CONCRETO/ELECTRICIDAD und 1.00 117.37 0.00 0.00 1.00 117.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 117.370

01.02.02.11 ACARREO DE MATERIAL EXCENDENTE DE DEMOLICIONES m3 890.27 8.57 0.00 0.00 890.27 7,629.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7,629.610
ELIMINACION DE MATERIAL EXCEDENTE DE DEMOLICIONES
01.02.02.12 m3 890.27 15.17 0.00 0.00 890.27 13,505.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13,505.400
CON MAQUINARIA
MOVILIZACION DE CAMPAMENTO, MAQUINARIA Y
01.02.03
HERRAMIENTAS
MOVILIZACIÓN DE CAMPAMENTO, MAQUINARIA Y
01.02.03.01 glb 1.00 14,000.00 0.50 7,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.50 7,000.00 14,000.000
HERRAMIENTAS
01.02.03.02 FLETE DE MATERIALES glb 1.00 91,315.83 1.00 91,315.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 91,315.830
01.02.04 TRAZO, NIVELES Y REPLANTEO
01.02.04.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 3,414.76 1.20 0.00 0.00 3,414.76 4,097.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,097.710
TRAZO, NEVELES Y EPLANTEO DURANTE LA EJECUCION DE
01.02.04.02 mes 6.00 4,764.46 0.00 0.00 1.20 5,717.35 1.20 5,717.35 1.20 5,717.35 1.20 5,717.35 1.20 5,717.35 28,586.750
LA OBRA
01.03 PLAN DE CONTINGENCIA
01.03.01 ESTRUCTURAS
01.03.01.01 MOVIMIENTO DE TIERRAS
01.03.01.01.01 EXCAVACIONES SIMPLES
01.03.01.01.01.01 EXCAVACIÓN CON MAQUINARIA DE ZANJAS PARA ZAPATAS m3 4.80 9.24 4.80 44.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 44.350

01.03.01.01.01.02 EXCAVACIÓN MANUAL DE ZANJAS PARA PIRCA m3 14.19 37.04 14.19 525.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 525.600
01.03.01.01.01.03 PERFILADO MANUAL DE ZANJAS m2 150.59 1.85 150.59 278.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 278.590
01.03.01.01.02 CORTES
01.03.01.01.02.01 CORTE PARA PLATAFORMADO m3 64.03 6.73 0.00 0.00 64.03 430.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 430.920
01.03.01.01.03 RELLENOS
01.03.01.01.03.01 RELLENO CON MATERIAL PROPIO m3 47.28 34.90 26.75 933.40 20.53 716.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,650.070
01.03.01.01.03.02 RELLENO CON MATERIAL DE PRÉSTAMO m3 171.04 159.47 171.04 27,275.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 27,275.750
01.03.01.01.04 NIVELACION INTERIOR Y APISONADO
NIVELACIÓN INTERIOR Y APISONADO FINAL PARA RECIBIR
01.03.01.01.04.01 m2 949.42 5.24 949.42 4,974.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,974.960
AL FALSO PISO CON EQUIPO LIVIANO
01.03.01.02 OBRAS DE CONCRETO SIMPLE
01.03.01.02.01 CIMIENTO
CONCRETO CICLOPEO CEMENTO-HORMIGON 1:8+30%PM
01.03.01.02.01.01 m3 0.36 356.89 0.36 128.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 128.480
dmax=6"
01.03.01.02.02 ZAPATAS
01.03.01.02.02.01 CONCRETO F'C=210KG/CM2 PARA ZAPATAS m3 2.40 457.66 2.40 1,098.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,098.380
01.03.01.02.03 SOLADOS
01.03.01.02.03.01 CONCRETO f'c=100kg/cm2 PARA SOLADOS h=0.10m m2 4.00 33.95 4.00 135.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 135.800
01.03.01.02.04 SOBRECIMIENTO
01.03.01.02.04.01 CONCRETO f'c= 175kg/cm2 PARA SOBRECIMIENTO m3 0.30 417.19 0.30 125.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 125.160

01.03.01.02.04.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 3.20 63.67 3.20 203.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 203.740
01.03.01.02.05 GRADAS
01.03.01.02.05.01 CONCRETO f'c= 175kg/cm2 PARA GRADAS m3 8.64 417.19 8.64 3,604.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,604.520
01.03.01.02.05.02 ENCOFRADO Y DESENCOFRADO DE GRADAS m2 11.72 63.67 11.72 746.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 746.210
01.03.01.02.06 RAMPAS
01.03.01.02.06.01 CONCRETO f´c =175 kg/cm2 PARA RAMPAS h=0.10m m2 1.25 42.63 0.00 0.00 1.25 53.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 53.290

01.03.01.02.06.02 ENCOFRADO Y DESENCOFRADO EN RAMPAS m2 1.25 63.67 1.21 77.18 0.04 2.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 79.590
01.03.01.02.07 FALSO PISO
01.03.01.02.07.01 CONCRETO FC=175 kg/cm² - PARA FALSO PISO m2 654.18 42.63 654.18 27,887.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 27,887.690
01.03.01.03 ESTRUCTURA METALICA
01.03.01.03.01 ESTRUCTURA DE APOYO DE TANQUE ELEVADO

01.03.01.03.01.01 ESTRUCTURA METALICA PARA TANQUE ELEVADO und 1.00 16,527.11 1.00 16,479.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16,479.110
01.03.01.03.01.02 ESTRUCTURA METALICA PARA BARANDA und 1.00 1,556.28 1.00 1,544.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,544.280
01.03.01.03.01.03 ESCALERA DE ACCESO A TANQUE ELEVADO und 1.00 4,828.43 1.00 4,804.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,804.430
01.03.01.03.02 TIJERALES
01.03.01.03.02.01 TIJERALES DE ACERO GALVANIZADO und 45.00 328.76 45.00 14,704.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14,704.200
01.03.01.03.03 CORREAS LONGITUDINALES
01.03.01.03.03.01 CORREAS LONGITUDINALES DE ACERO GALVANIZADO m 1,186.68 10.15 1,186.68 11,926.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11,926.130
CRONOGRAMA DE AVANCE VALORIZADO
OBRA MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E 80659 NUESTRA SEÑORA DE FATIMA DEL CASERIO DE TOGOPON DEL DISTRITO DE CARABAMBA PROVINCIA DE JULCAN DEPARTAMENTO DE LA LIBERTAD

Lugar LA LIBERTAD - JULCAN - CARABAMBA


1 1 2 2 3 3 4 4 5 5 6 6
MES 01 MES 02 MES 03 MES 04 MES 05 MES 06
PRECIO
Item Descripción UNIDAD METRADO TOTAL
UNITARIO S/. Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial
01.03.01.04 VARIOS
01.03.01.04.01 MURO DE CONTENCION
CONCRETO CICLOPEO-HORMIGÓN 1:10 + 30% PM dmax =
01.03.01.04.01.01 m3 103.19 356.89 103.19 36,827.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 36,827.480
8"
01.03.01.04.01.02 ENCOFRADO Y DESENCOFRADO m2 314.06 73.88 314.06 23,202.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23,202.750
01.03.02 ARQUITECTURA
01.03.02.01 TABIQUES DE ALBAÑILERÍA
01.03.02.01.01 TABIQUERÍA DE FIBROCEMENTO m2 1,196.06 76.62 1,196.06 91,642.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 91,642.120
01.03.02.02 REVOQUES Y REVESTIMIENTOS
01.03.02.02.01 BRUÑAS E=1.0 CM, SEGÚN DETALLE m 933.15 8.32 933.15 7,763.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7,763.810
PREPARACIÓN DE GRADAS DE CONCRETO (paso: 0.30 x
01.03.02.02.02 m 25.10 9.55 25.10 239.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 239.710
contrapaso 0.15 m.)
PREPARACIÓN DE GRADAS DE CONCRETO (paso: 1.50 x
01.03.02.02.03 m 1.50 37.75 1.50 56.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56.630
contrapaso 0.15 m.)
PREPARACIÓN DE GRADAS DE CONCRETO (paso: 1.35 x
01.03.02.02.04 m 1.40 36.22 1.40 50.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50.710
contrapaso 0.15 m.)
01.03.02.02.05 GRADAS DE CONCRETO (paso: 0.30 x contrapaso 0.15 m.) m 20.60 25.49 20.60 525.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 525.090

01.03.02.02.06 GRADAS DE CONCRETO (paso: 1.50 x contrapaso 0.15 m.) m 1.50 140.89 1.50 211.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 211.340

01.03.02.02.07 GRADAS DE CONCRETO (paso: 1.35 x contrapaso 0.15 m.) m 1.40 127.91 1.40 179.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 179.070
01.03.02.03 CIELO RASOS
01.03.02.03.01 FALSO CIELO RASO DE DRYWALL m2 361.29 44.21 0.00 0.00 361.29 15,781.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15,781.150
01.03.02.04 PISOS Y PAVIMENTOS
01.03.02.04.01 CONTRAPISO
01.03.02.04.01.01 CONTRAPISO DE 40 mm m2 607.07 32.35 584.15 18,897.27 22.92 741.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19,638.710
01.03.02.04.02 PISOS DE CONCRETO
01.03.02.04.02.01 PISO CEMENTO SEMIFROTACHADO m2 607.07 9.66 0.00 0.00 607.07 5,864.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,864.300
01.03.02.05 ZOCALOS Y CONTRAZOCALOS
01.03.02.05.01 ZOCALOS
01.03.02.05.01.01 ZOCALO DE CERAMICO 0.45 x 0.45 m. m2 58.05 72.73 0.00 0.00 58.05 4,221.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,221.980
01.03.02.06 COBERTURA
01.03.02.06.01 COBERTURA PLANCHA ONDULADA DE FIBROCEMENTO m2 350.50 29.06 345.04 9,888.74 5.46 156.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10,045.330

01.03.02.06.02 CUMBRERA PLANCHA ONDULADA DE FIBROCEMENTO m 98.89 57.41 0.00 0.00 98.89 5,637.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,637.720
01.03.02.07 CARPINTERIA DE MADERA
01.03.02.07.01 PUERTAS
01.03.02.07.01.01 PUERTA CONTRAPLACADA m2 36.75 443.39 0.00 0.00 36.75 16,294.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16,294.580
01.03.02.07.01.02 PUERTA MELAMINE m2 8.55 310.50 0.00 0.00 8.55 2,654.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,654.780
01.03.02.07.01.03 SEPARADORES DE MELAMINE EN SS.HH m2 25.28 165.10 0.00 0.00 25.28 4,173.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,173.730
01.03.02.08 CARPINTERIA METALICA Y HERRERIA
01.03.02.08.01 VENTANAS DE ALUMINIO
VENTANA DE ALUMINIO / VIDRIO SIMPLE CON LAMINA DE
01.03.02.08.01.01 m2 43.22 325.60 0.00 0.00 43.22 14,072.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14,072.430
SEGURIDAD 6 MM (CORREDIZA)
01.03.02.08.02 PUERTA METALICA
01.03.02.08.02.01 PORTÓN METÁLICO DOBLE HOJA DE MALLA GALVANIZADA m2 19.23 320.11 0.00 0.00 19.23 6,155.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6,155.720

01.03.02.08.02.02 PORTÓN METÁLICO UNA HOJA DE MALLA GALVANIZADA m2 2.44 320.11 0.00 0.00 2.44 781.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 781.070
01.03.02.08.03 BARANDAS
BARANDA DE PROTECCION TANQUE ELEVADO H=1.00 m
01.03.02.08.03.01 FIERRO NEGRO CON PROTECCIÓN DE PINTURA m 6.60 142.39 0.00 0.00 6.60 939.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 939.770
ANTICORROSIVA Y ESMALTE
01.03.02.08.04 ESCALERAS
01.03.02.08.04.01 ESCALERA DE GATO DE FIERRO GALVANIZADO und 1.00 7,273.77 0.00 0.00 1.00 7,225.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7,225.770
01.03.02.08.05 CERCO METALICO
CERCO CON PARANTES 3" Y MALLA GALVANIZADA 2", H =
01.03.02.08.05.01 m 148.09 141.33 0.00 0.00 148.09 20,929.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20,929.560
2.44 m."
01.03.02.09 CERRAJERIA
01.03.02.09.01 BISAGRAS
01.03.02.09.01.01 BISAGRA ALUMINIZADA DE 3 1/2" PESADA pza 117.00 10.20 0.00 0.00 117.00 1,193.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,193.400
01.03.02.09.02 CERRADURAS
01.03.02.09.02.01 CERRADURA DE PALANCA EN PUERTAS CONTRAPLACADAS pza 17.00 126.99 0.00 0.00 17.00 2,158.83 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,158.830

01.03.02.09.02.02 CERROJO DE BRONCE PARA PUERTA DE MELAMINE pza 5.00 67.50 0.00 0.00 5.00 337.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 337.500
01.03.02.09.02.03 JALADOR METALICO PARA PUERTA pza 5.00 55.47 0.00 0.00 5.00 277.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 277.350
01.03.02.10 PINTURA
01.03.02.10.01 PINTURA ESMALTE 2 MANOS EN ESTRUCTURAS METÁLICAS m2 51.50 26.14 0.00 0.00 51.50 1,346.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,346.210
01.03.02.11 JUNTAS
01.03.02.11.01 JUNTA VISIBLE 5 mm. m 853.45 4.79 853.45 4,088.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,088.030
01.03.02.12 AREAS VERDES
01.03.02.12.01 TIERRA CHACRA E=15 cm m2 327.46 12.21 0.00 0.00 327.46 3,998.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,998.290
01.03.02.12.02 GRASS AMERICANO NATURAL m2 327.46 8.71 0.00 0.00 327.46 2,852.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,852.180
01.03.02.12.03 SETO PARA CERCO VIVO m 22.40 45.61 0.00 0.00 22.40 1,021.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,021.660
01.03.02.13 VARIOS
ESPEJO BISELADO EN SS.HH. e=6mm, C/LAMINA DE
01.03.02.13.01 m2 1.80 390.09 0.00 0.00 1.80 702.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 702.160
SEGURIDAD
VENTANA DE ALUMINIO / VIDRIO SIMPLE CON LAMINA DE
01.03.02.13.02 SEGURIDAD 6 MM (CORREDIZA). EN VENTANAS CON m2 43.22 305.51 0.00 0.00 43.22 13,204.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13,204.140
SISTEMA DIRECTO
01.03.02.14 EVACUACIÓN Y SEÑALIZACIÓN
01.03.02.14.01 SEÑALIZACION Y SEGURIDAD
01.03.02.14.01.01 SUMINISTRO Y COLOCACION DE SEÑAL DE SALIDA und 8.00 17.29 0.00 0.00 8.00 138.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 138.320

01.03.02.14.01.02 SUMINISTRO Y COLOCACIÓN DE RUTAS DE EVACUACIÓN und 12.00 17.29 0.00 0.00 12.00 207.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 207.480
SUMINISTRO Y COLOCACIÓN DE SEÑAL EXTINTORES DE
01.03.02.14.01.03 und 3.00 17.29 0.00 0.00 3.00 51.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 51.870
FUEGO
01.03.02.14.01.04 SUMINISTRO Y COLOCACIÓN DE SEÑAL RIESGO ELECTRICO und 1.00 17.29 0.00 0.00 1.00 17.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.290

01.03.02.14.01.05 SUMINISTRO Y COLOCACION DE SEÑAL DE AFORO und 6.00 20.34 0.00 0.00 6.00 122.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 122.040

01.03.02.14.01.06 SUMINISTRO Y COLOCACION DE SIMBOLO DE BOTIQUÍN und 1.00 20.34 0.00 0.00 1.00 20.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.340
01.03.02.14.02 RUTAS DE EVACUACIÓN
PINTADO EN ZONA DE SEGURIDAD EN PISO CON PINTURA
01.03.02.14.02.01 m2 4.00 22.37 0.00 0.00 4.00 89.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 89.480
DE TRAFICO
SUMINISTRO Y COLOCACION DE SEÑALIZACION EN ZONA DE
01.03.02.14.02.02 und 4.00 19.38 0.00 0.00 4.00 77.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 77.520
REUNION
01.03.02.14.03 VARIOS
SUMINISTRO Y COLOCACION DE BOTIQUIN 80X60X20CM.
01.03.02.14.03.01 und 1.00 168.43 0.00 0.00 1.00 168.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 168.430
INC. MEDICAMENTOS
01.03.02.14.03.02 SUMINISTRO Y COLOCACION DE EXTINTOR TIPO "K" 6LT. und 1.00 261.56 0.00 0.00 1.00 261.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 261.560

01.03.02.14.03.03 SUMINISTRO Y COLOCACION DE EXTINTOR CO2 DE 6KG. und 1.00 261.56 0.00 0.00 1.00 261.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 261.560
01.03.03 INSTALACIONES SANITARIAS
01.03.03.01 APARATOS Y ACCESORIOS SANITARIOS

01.03.03.01.01 SUMINISTRO E INSTALACION DE APARATOS SANITARIOS


CRONOGRAMA DE AVANCE VALORIZADO
OBRA MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E 80659 NUESTRA SEÑORA DE FATIMA DEL CASERIO DE TOGOPON DEL DISTRITO DE CARABAMBA PROVINCIA DE JULCAN DEPARTAMENTO DE LA LIBERTAD

Lugar LA LIBERTAD - JULCAN - CARABAMBA


1 1 2 2 3 3 4 4 5 5 6 6
MES 01 MES 02 MES 03 MES 04 MES 05 MES 06
PRECIO
Item Descripción UNIDAD METRADO TOTAL
UNITARIO S/. Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial

INODORO DE LOSA VITRIFICADA CON DESCARGA INDIRECTA


01.03.03.01.01.01 (TANQUE). MODELO: RAPIJET PRIMIUN, COLOR BLANCO 1ra und 2.00 234.71 1.93 452.15 0.07 17.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 469.420
CALIDAD - NIÑOS

INODORO DE LOSA VITRIFICADA CON DESCARGA INDIRECTA


01.03.03.01.01.02 (TANQUE). MODELO: RAPIJET PRIMIUN, COLOR BLANCO 1ra und 5.00 265.61 0.00 0.00 5.00 1,328.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,328.050
CALIDAD - ADULTOS
URINARIO DE PARED DE LOSA VITRIFICADA BLANCA
01.03.03.01.01.03 und 1.00 495.08 0.92 456.34 0.08 38.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 495.080
MODELO CADET O SIMILAR
01.03.03.01.01.04 LAVATORIO DE LOSA VITRIFICADA BLANCA C/GRIFERIA und 7.00 473.39 0.00 0.00 7.00 3,313.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,313.730
LAVADERO ACERO INOXIDABLE 01 POZA C/ESCURRIDERO
01.03.03.01.01.05 und 1.00 502.40 0.00 0.00 1.00 502.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 502.400
(INC. GRIFERIA)
01.03.03.01.01.06 DUCHA ACERO INOXIDABLE (INC. ACCESORIOS) und 1.00 303.39 0.00 0.00 1.00 303.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 303.390

01.03.03.01.02 SUMINISTRO E INSTALACION DE ACCESORIOS


PORTARROLLO EMPOTRADO DE LOSA PARA PAPEL
01.03.03.01.02.01 und 7.00 94.96 5.19 493.20 1.81 171.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 664.720
HIGIÉNICO
01.03.03.01.02.02 LLAVE DE DUCHA CROMADA TIPO PALANCA und 1.00 182.72 0.98 178.42 0.02 4.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 182.720
01.03.03.01.02.03 BASURERO DE PLASTICO PARA BAÑO 35 LT. und 7.00 53.86 7.00 377.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 377.020
JABONERA DE ACERO INOX. CON DISPENSADOR PARA
01.03.03.01.02.04 und 4.00 108.20 1.34 145.30 2.66 287.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 432.800
JABÓN LÍQUIDO
01.03.03.01.02.05 JABONERA DE LOSA PARA DUCHA und 1.00 56.16 0.00 0.00 1.00 56.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56.160
01.03.03.01.02.06 DISPENSADOR PARA PAPEL TOALLA und 5.00 72.03 0.00 0.00 5.00 360.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 360.150
01.03.03.01.02.07 GRIFO DE RIEGO und 1.00 51.70 0.00 0.00 1.00 51.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 51.700
01.03.03.02 SISTEMA DE AGUA FRIA
01.03.03.02.01 SALIDA DE AGUA FRIA
01.03.03.02.01.01 SALIDA DE AGUA FRIA - Ø = 1/2" PVC SAP pto 17.00 57.78 17.00 982.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 982.260
01.03.03.02.01.02 SALIDA DE AGUA FRIA - Ø = 3/4" PVC SAP pto 1.00 54.72 1.00 54.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 54.720
01.03.03.02.01.03 SALIDA DE AGUA FRIA - Ø = 1 1/4" PVC SAP pto 1.00 60.58 1.00 60.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 60.580
01.03.03.02.02 REDES DE DISTRIBUCION
01.03.03.02.02.01 RED DE DISTRIBUCION TUBERIA PVC CLASE 10 DE 1/2" m 23.64 12.45 23.64 294.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 294.320

01.03.03.02.02.02 RED DE DISTRIBUCION TUBERIA PVC CLASE 10 C/R DE 3/4" m 36.09 11.34 36.09 409.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 409.260

01.03.03.02.02.03 RED DE DISTRIBUCION TUBERIA PVC CLASE 10 C/R DE 1" m 18.20 16.63 18.20 302.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 302.670
01.03.03.02.03 REDES DE ALIMENTACION
01.03.03.02.03.01 RED DE ALIMENTACION TUBERIA PVC CLASE 10 C/R DE 1/2" m 15.00 10.52 15.00 157.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 157.800

01.03.03.02.03.02 RED DE ALIMENTACION TUBERIA PVC CLASE 10 C/R DE 3/4" m 23.00 9.54 23.00 219.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 219.420

01.03.03.02.03.03 RED DE ALIMENTACION TUBERIA PVC CLASE 10 C/R DE 1" m 15.00 13.87 15.00 208.05 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 208.050
RED DE ALIMENTACION TUBERIA PVC CLASE 10 C/R DE 1
01.03.03.02.03.04 m 34.30 20.12 34.30 690.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 690.120
1/4"
01.03.03.02.03.05 EXCAVACION Y PICADO DE ZANJA PARA TUBERIA m3 49.26 9.85 49.26 485.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 485.210

01.03.03.02.03.06 REFINE Y NIVELACION DE ZANJA PARA TUBERIA m2 61.57 1.85 61.57 113.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 113.900
01.03.03.02.03.07 CAMA DE ARENA EN ZANJA P/TUB. m3 6.16 140.19 6.16 863.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 863.570
RELLENO MANUAL CON MATERIAL PROPIO (REDES DE INST.
01.03.03.02.03.08 m3 24.63 33.44 24.63 823.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 823.630
SANITARIAS)
01.03.03.02.03.09 ELIMINACION DE MATERIAL EXCEDENTE MANUAL m3 30.79 15.17 30.79 467.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 467.080
01.03.03.02.03.10 PRUEBAS HIDRAULICAS Y DESINFECCION m 165.23 5.51 165.23 910.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 910.420
01.03.03.02.04 ACCESORIOS DE REDES
01.03.03.02.04.01 CODO PVC 90° SAP C-10 DE 1/2" und 31.00 8.71 31.00 270.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 270.010
01.03.03.02.04.02 CODO PVC 90° SAP C-10 DE 3/4" und 23.00 9.68 23.00 222.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 222.640
01.03.03.02.04.03 CODO PVC 90° SAP C-10 DE 1" und 4.00 11.07 4.00 44.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 44.280
01.03.03.02.04.04 CODO PVC 90° SAP C-10 DE 1 1/4" und 3.00 12.77 3.00 38.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 38.310
01.03.03.02.04.05 TEE PVC SAP C-10 DE 3/4" und 9.00 11.37 9.00 102.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 102.330
01.03.03.02.04.06 TEE PVC SAP C-10 DE 11/4" und 6.00 23.58 6.00 141.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 141.480
01.03.03.02.04.07 REDUCCIÓN PVC SAP C-10 DE 3/4" A 1/2" und 13.00 9.30 13.00 120.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 120.900
01.03.03.02.04.08 REDUCCIÓN PVC SAP C-10 DE 1" A 3/4" und 1.00 11.20 1.00 11.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.200
01.03.03.02.04.09 REDUCCIÓN PVC SAP C-10 DE 11/4" A 3/4" und 2.00 11.60 2.00 23.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 23.200
01.03.03.02.04.10 REDUCCIÓN PVC SAP C-10 DE 11/4" A 1" und 1.00 12.00 1.00 12.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.000
01.03.03.02.05 VALVULAS Y LLAVES
01.03.03.02.05.01 VALVULA ESFERICA DE BRONCE PESADA Ø=1/2" und 1.00 102.46 0.00 0.00 1.00 102.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 102.460

01.03.03.02.05.02 VALVULA ESFERICA DE BRONCE PESADA Ø=3/4" und 4.00 127.78 0.00 0.00 4.00 511.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 511.120
01.03.03.02.05.03 VALVULA ESFERICA DE BRONCE PESADA Ø1" und 2.00 161.67 0.00 0.00 2.00 323.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 323.340
01.03.03.02.05.04 VALVULA DE COMPUERTA DE BRONCE PESADA Ø1 1/4" und 7.00 162.38 0.00 0.00 7.00 1,136.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,136.660
01.03.03.02.05.05 VALVULA CHECK DE BRONCE Ø1" und 1.00 112.87 0.00 0.00 1.00 112.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 112.870
01.03.03.02.05.06 VALVULA CHECK DE BRONCE Ø1 1 /4" und 2.00 116.60 0.00 0.00 2.00 233.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 233.200
LLAVE DE RIEGO CON GRIFO DE Ø3/4" - EN CAJUELA DE
01.03.03.02.05.07 und 1.00 371.48 0.00 0.00 1.00 371.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 371.480
CONCRETO F´c=175 Kg/cm2
01.03.03.02.06 CAJAS PARA VALVULAS
01.03.03.02.06.01 CAJA NICHO PARA VALVULAS INC. TAPA und 5.00 199.66 5.00 998.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 998.300
01.03.03.02.06.02 CAJA NICHO PARA GRIFO DE RIEGO und 1.00 115.16 1.00 115.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 115.160
01.03.03.03 SISTEMA DE DRENAJE PLUVIAL
01.03.03.03.01 REDES COLECTORAS EXTERIORES
EXCAVACION Y PICADO DE ZANJA PARA CANALETA DE
01.03.03.03.01.01 m3 6.54 42.33 6.54 276.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 276.840
CONCRETO
REFINE Y NIVELACION DE ZANJA PARA CANALETA DE
01.03.03.03.01.02 m2 11.90 1.24 11.90 14.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14.760
CONCRETO
01.03.03.03.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL m3 6.54 15.17 6.54 99.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 99.210
01.03.03.03.01.04 TUBERIA DE PVC-U DN 6" m 39.65 33.69 39.65 1,335.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,335.810
01.03.03.03.01.05 TUBERÍA DE PVC 4" m 7.93 19.63 7.64 149.91 0.29 5.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 155.670
01.03.03.03.01.06 JUNTA DE CONSTRUCCION EN CANAL PLUVIAL m 8.59 8.00 0.00 0.00 8.59 68.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 68.720
01.03.03.03.02 REDES COLECTORAS EN TECHOS
CANALETA DE PLANCHA GALVANIZADA D=6" e=1/32",
01.03.03.03.02.01 m 95.54 36.01 86.10 3,065.99 9.44 336.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,402.180
INCLUYE SOPORTES
ABRAZADERA PARA TUBO Ø 4" PARA MONTANTE DE RED
01.03.03.03.02.02 und 42.00 19.84 0.00 0.00 42.00 833.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 833.280
PLUVIAL
01.03.03.03.02.03 CODO PVC 90 SAP C-10 DE 4" und 28.00 12.69 0.00 0.00 28.00 355.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 355.320
01.03.03.03.02.04 CODO PVC 45 SAP C-10 DE 4" und 28.00 12.69 0.00 0.00 28.00 355.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 355.320
01.03.03.03.02.05 CONCRETO F'C=175KG/CM2 EN COLUMNETA m3 0.79 417.19 0.00 0.00 0.79 329.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 329.580
01.03.03.03.02.06 ENCOFRADO Y DESENCOFRADO EN COLUMNETA m2 11.55 86.39 0.00 0.00 11.55 997.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 997.800
MONTANTE TUBERIA DE PVC SAL DE 4" INCLUYE
01.03.03.03.02.07 m 50.40 19.78 0.00 0.00 50.40 996.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 996.910
ACCESORIOS
01.03.03.04 DESAGÜE Y VENTILACIÓN
01.03.03.04.01 SALIDA DE DESAGUE Y VENTILACION
01.03.03.04.01.01 SALIDA DE DESAGUE EN PVC SAP Ø DE 2" pto 10.00 54.30 10.00 543.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 543.000
01.03.03.04.01.02 SALIDA DE DESAGUE EN PVC CP Ø DE 2" CON TRAMPA "P" pto 1.00 73.46 1.00 73.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 73.460
01.03.03.04.01.03 SALIDA DE DESAGUE EN PVC SAP Ø DE 4" pto 7.00 61.18 7.00 428.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 428.260
01.03.03.04.01.04 SALIDA DE VENTILACION EN PVC SAP Ø DE 2" pto 10.00 53.00 10.00 530.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 530.000
01.03.03.04.02 REDES DE DERIVACION
SUMINISTRO E INSTALACION DE TUBERIA PVC DESAGUE
01.03.03.04.02.01 m 23.52 18.01 23.52 423.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 423.600
DN=2"
CRONOGRAMA DE AVANCE VALORIZADO
OBRA MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E 80659 NUESTRA SEÑORA DE FATIMA DEL CASERIO DE TOGOPON DEL DISTRITO DE CARABAMBA PROVINCIA DE JULCAN DEPARTAMENTO DE LA LIBERTAD

Lugar LA LIBERTAD - JULCAN - CARABAMBA


1 1 2 2 3 3 4 4 5 5 6 6
MES 01 MES 02 MES 03 MES 04 MES 05 MES 06
PRECIO
Item Descripción UNIDAD METRADO TOTAL
UNITARIO S/. Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial
SUMINISTRO E INSTALACION DE TUBERIA PVC DESAGUE
01.03.03.04.02.02 ml 11.70 22.48 11.70 263.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 263.020
DN=4"
SUMINISTRO E INSTALACIÓN DE MONTANTE DE
01.03.03.04.02.03 m 33.60 19.79 33.60 664.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 664.940
VENTILACIÓN PVC-CP 2" INC. ACCESORIOS

01.03.03.04.02.04 PRUEBA HIDRAULICA DE ESCORRENTIA DE TUB. DESAGUE m 130.43 2.36 7.70 18.16 122.73 289.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 307.810
01.03.03.04.03 ACCESORIOS DE REDES
01.03.03.04.03.01 TEE PVC-P Ø2"x2" PARA DESAGUE und 11.00 10.14 11.00 111.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 111.540
01.03.03.04.03.02 YEE PVC-P Ø2"x2" PARA DESAGUE und 5.00 12.26 5.00 61.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 61.300
01.03.03.04.03.03 YEE PVC-P Ø4"x2" PARA DESAGUE und 2.00 13.11 2.00 26.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 26.220
01.03.03.04.03.04 YEE PVC-P Ø4"x4" PARA DESAGUE und 2.00 14.21 2.00 28.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 28.420
01.03.03.04.03.05 CODO PVC-P Ø=2"x45° und 6.00 7.60 6.00 45.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 45.600
01.03.03.04.03.06 CODO PVC-P Ø=2"x90° und 26.00 7.09 26.00 184.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 184.340
01.03.03.04.03.07 CODO PVC-P Ø=4"x45° und 3.00 12.69 3.00 38.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 38.070
01.03.03.04.03.08 CODO PVC-CP Ø=4"x90° CON VENTILACION DE Ø2" und 3.00 23.32 3.00 69.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 69.960
01.03.03.04.03.09 REDUCCIÓN PVC - SAP DE 4" A 2" und 3.00 13.53 0.00 0.00 3.00 40.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 40.590
01.03.03.04.03.10 ABRAZADERAS F°G° PARA TUBERIAS 4" und 28.00 16.40 0.00 0.00 28.00 459.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 459.200
01.03.03.04.03.11 COLGADOR Ø DE 4" m 28.00 25.61 0.00 0.00 28.00 717.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 717.080
01.03.03.04.04 REDES COLECTORAS
SUMINISTRO E INSTALACIÓN DE TUBERIA DE PVC SAP Ø DE
01.03.03.04.04.01 m 61.61 33.62 61.61 2,071.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,071.330
6"
01.03.03.04.04.02 EXCAVACION Y PICADO DE ZANJA PARA TUBERIA m3 38.73 9.85 38.73 381.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 381.490

01.03.03.04.04.03 REFINE Y NIVELACIÓN DE ZANJA PARA TUBERIA m2 48.42 1.85 48.42 89.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 89.580
01.03.03.04.04.04 CAMA DE ARENA EN ZANJA P/TUB. m3 4.82 140.19 4.82 675.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 675.720
RELLENO Y COMPACTADO CON CON EQUIPO Y MAT.
01.03.03.04.04.05 m3 19.37 33.44 13.70 458.20 5.67 189.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 647.730
PROPIO
01.03.03.04.04.06 ELIMINACION DE MATERIAL EXCEDENTE MANUAL m3 29.05 15.17 0.00 0.00 29.05 440.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 440.690
01.03.03.04.05 ADITAMENTOS VARIOS
01.03.03.04.05.01 SUMIDERO DE BRONCE DE 2" PROVISION Y COLOCACION und 6.00 19.64 0.00 0.00 6.00 117.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 117.840
REGISTRO ROSCADO DE BRONCE DE 4" PROVISION Y
01.03.03.04.05.02 und 13.00 35.90 0.00 0.00 13.00 466.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 466.700
COLOCACION
01.03.03.04.05.03 SOMBRERO DE VENTILACION DE 2" PVC und 9.00 17.27 0.00 0.00 9.00 155.43 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 155.430
01.03.03.04.06 CAMARAS DE INSPECCION
CAJA DE REG. PREFAB. 12" x 24" (0.30x0.60) C/TAPA
01.03.03.04.06.01 und 4.00 138.69 0.00 0.00 4.00 554.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 554.760
CONCRETO REFORZADO
CAJA DE REG. PREFAB. 18" x 24" (0.45x0.60) C/TAPA
01.03.03.04.06.02 und 16.00 162.61 0.00 0.00 16.00 2,601.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,601.760
CONCRETO REFORZADO
CAJA DE REG. PREFAB. 24" x 24" (0.60x0.60) C/TAPA
01.03.03.04.06.03 und 4.00 167.75 0.00 0.00 4.00 671.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 671.000
CONCRETO REFORZADO
01.03.03.04.07 DISPOSICION DE AGUAS NEGRAS
01.03.03.04.07.01 BIODIGESTOR DE 3000 L
01.03.03.04.07.02 EXCAVACION DE MANUAL m3 18.22 42.33 17.84 755.18 0.38 16.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 771.250
01.03.03.04.07.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL m3 24.84 15.17 0.00 0.00 24.84 376.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 376.820

SUMINISTRO E INSTALACION DE BIODIGESTOR


01.03.03.04.07.04 und 1.00 1,534.00 0.00 0.00 1.00 1,534.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,534.000
PREFABRICADO TIPO I DE 600-700 LTS

01.03.03.04.07.05 RED DE DERIVACIÓN DE TUBERIA PVC - SAP Ø DE 4" m 6.00 21.83 0.00 0.00 6.00 130.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 130.980

01.03.03.04.07.06 RED DE DERIVACIÓN DE TUBERIA PVC - SAP Ø DE 6" m 6.00 33.62 0.00 0.00 6.00 201.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 201.720
01.03.03.04.07.07 CAJA DE LODOS
01.03.03.04.07.08 EXCAVACION DE MANUAL m3 1.33 42.33 0.00 0.00 1.33 56.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 56.300
01.03.03.04.07.09 ELIMINACION DE MATERIAL EXCEDENTE MANUAL m3 1.82 15.17 0.00 0.00 1.82 27.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 27.610
01.03.03.04.07.10 POZO DE PERCOLACION
01.03.03.04.07.11 EXCAVACION DE MANUAL m3 41.40 42.33 0.00 0.00 41.40 1,752.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,752.460
01.03.03.04.07.12 ELIMINACION DE MATERIAL EXCEDENTE MANUAL m3 56.45 15.17 0.00 0.00 56.45 856.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 856.350
TAPA DE CONCRETO DE 0.60 X 0.60 e=0.05m P/POZO DE
01.03.03.04.07.13 und 1.00 65.00 0.00 0.00 1.00 65.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 65.000
PERCOLACION
MURO DE LADRILLO SOLIDO ARTESANAL D/CABEZA
01.03.03.04.07.14 m2 3.31 72.58 0.00 0.00 3.31 240.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 240.240
C/JUNTA ABIERTA
SISTEMA DE ALMACENAMIENTO DE CISTERNA Y TANQUE
01.03.03.05
ELEVADO
01.03.03.05.01 REDES DE ALIMENTACIÓN
SUMINISTRO E INSTALACION DE TANQUE DE 2500 LITROS
01.03.03.05.01.01 glb 1.00 1,394.42 0.00 0.00 1.00 1,394.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,394.420
INCLUYE VALVULAS Y ACCESORIOS

SUMINISTRO E INSTALACION DE TANQUE DE 5000 LITROS


01.03.03.05.01.02 glb 1.00 5,498.06 0.00 0.00 1.00 5,498.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,498.060
INCLUYE VALVULAS Y ACCESORIOS

01.03.03.05.02 SUMINISTRO E INSTALACIÓN DE ELECTROBOMBA

SUMINISTRO E INSTALACION DE EQUIPO DE BOMBEO; 02


01.03.03.05.02.01 ELECTROBOMBAS CENTRIFUGAS (Q=2.11 LPS, GLB 2.00 1,136.59 0.00 0.00 2.00 2,273.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,273.180
HDT=22.00, Pot. Estimada= 1.5HP)
01.03.04 SISTEMA ELÉCTRICO Y MECÁNICO
01.03.04.01 CONEXIÓN A LA RED EXTERNA DE MEDIDORES
01.03.04.01.01 SUMINISTRO ELÉCTRICO TEMPORAL und 1.00 388.47 1.00 388.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 388.470
01.03.04.02 SALIDAS
01.03.04.02.01 SALIDAS PARA ALUMBRADO
SALIDA DE INTERIOR (CENTRO DE LUZ) - LUMINARIA LED
01.03.04.02.01.01 pto 9.00 41.01 9.00 369.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 369.090
CIRCULAR
SALIDA DE INTERIOR (CENTRO DE LUZ) - LUMINARIA LED
01.03.04.02.01.02 pto 39.00 41.01 17.01 697.61 21.99 901.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,599.390
CUADRADA
01.03.04.02.01.03 SALIDA PARA LUZ DE EMERGENCIA EN PARED pto 8.00 40.61 0.00 0.00 8.00 324.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 324.880
01.03.04.02.02 SALIDAS PARA TOMACORRIENTE
SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE CON PT
01.03.04.02.02.01 pto 22.00 72.79 0.00 0.00 22.00 1,601.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,601.380
(NORMAL)
01.03.04.02.03 SALIDAS PARA INTERRUPTORES
01.03.04.02.03.01 SALIDA PARA INTERRUPTOR SIMPLE pto 6.00 71.68 5.77 413.78 0.23 16.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 430.080
01.03.04.02.03.02 SALIDA PARA INTERRUPTOR DOBLE pto 8.00 83.78 0.00 0.00 8.00 670.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 670.240
01.03.04.02.03.03 SALIDA PARA INTERRUPTOR TRIPLE pto 2.00 84.78 0.00 0.00 2.00 169.56 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 169.560
01.03.04.03 CONDUCTOS Y/O TUBERIAS
01.03.04.03.01 TUBERÍAS EMPOTRADAS
01.03.04.03.01.01 TUBERIA PVC-SAP ELECTRICA DE 25mm m 3.70 11.73 3.70 43.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 43.400
01.03.04.03.01.02 TUBERIA PVC-SAP ELECTRICA DE 20mm (ILUMINACIÓN) m 138.82 7.76 138.82 1,077.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,077.240
TUBERIA PVC-SAP ELECTRICA DE 20mm
01.03.04.03.01.03 m 72.00 7.76 72.00 558.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 558.720
(TOMACORRIENTES)
01.03.04.03.01.04 TUBERIA PVC-SAP ELECTRICA DE 25mm (ALIMENTADORES) m 78.74 11.73 78.74 923.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 923.620

01.03.04.04 CONDUCTORES Y/O CABLES EN TUBERÍAS


01.03.04.04.01 ALIMENTADORES
01.03.04.04.01.01 NH-80 (UNIPOLAR) 1x 6mm² + 1x 6mm²(N) m 10.40 6.63 0.00 0.00 10.40 68.95 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 68.950
01.03.04.04.01.02 NH-80 2x2.5mm2+1x2.5mm2(LT) (ILUMINACIÓN ) m 555.28 3.88 0.00 0.00 555.28 2,154.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,154.490
01.03.04.04.01.03 NH-80 2x4mm2+1x4mm2(LT)(TOMACORRIENTES) m 216.00 4.21 0.00 0.00 216.00 909.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 909.360
CRONOGRAMA DE AVANCE VALORIZADO
OBRA MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E 80659 NUESTRA SEÑORA DE FATIMA DEL CASERIO DE TOGOPON DEL DISTRITO DE CARABAMBA PROVINCIA DE JULCAN DEPARTAMENTO DE LA LIBERTAD

Lugar LA LIBERTAD - JULCAN - CARABAMBA


1 1 2 2 3 3 4 4 5 5 6 6
MES 01 MES 02 MES 03 MES 04 MES 05 MES 06
PRECIO
Item Descripción UNIDAD METRADO TOTAL
UNITARIO S/. Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial
01.03.04.04.01.04 NH-80 2x6mm2+1x6mm2(LT)(ALIMENTADORES) m 236.22 7.19 0.00 0.00 236.22 1,698.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,698.420
01.03.04.05 SISTEMA DE CONDUCTOS
01.03.04.05.01 BUZON DE INSTALACIONES ELÉCTRICAS (0.65x0.65x0.85cm) und 3.00 294.13 2.99 878.66 0.01 3.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 882.390
01.03.04.06 TABLEROS
01.03.04.06.01 TABLEROS PRINCIPALES
01.03.04.06.01.01 TG C/RIEL DIN 2x32A: 4 Int. Ter. 2x25A , 12 Polos Empotrado und 1.00 864.22 0.00 0.00 1.00 864.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 864.220
01.03.04.06.02 TABLERO DE DISTRIBUCION
TD-1 C/RIEL: 1 int. 2x16A, 1 Int. Ter. 2x20A, 1 Int. Dif.
01.03.04.06.02.01 und 1.00 488.28 0.00 0.00 1.00 488.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 488.280
2x25A(30mA) , 10 Polos Empotrado
TD-2 C/RIEL DIN 2x25A: 1 int. 2x16A, 1 Int. Ter. 2x20A, 1 Int.
01.03.04.06.02.02 und 1.00 488.28 0.00 0.00 1.00 488.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 488.280
Dif. 2x25A(30mA) , 10 Polos Empotrado

TD-3 C/RIEL DIN 2x25A: 1 int. 2x16A, 1 Int. Ter. 2x20A, 1 Int.
01.03.04.06.02.03 und 1.00 488.28 0.00 0.00 1.00 488.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 488.280
Dif. 2x25A(30mA) , 10 Polos Empotrado
01.03.04.06.02.04 TD-4 C/RIEL: 1 int. 2x16A , 08 Polos Empotrado und 1.00 254.68 0.00 0.00 1.00 254.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 254.680
01.03.04.07 INSTALACION DE SISTEMA DE PUESTA A TIERRA

01.03.04.07.01 POZO PUESTA A TIERRA R<=25 Ohms (VARILLA DE 5/8) und 1.00 1,559.44 0.00 0.00 1.00 1,559.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,559.440
01.03.04.08 ARTEFACTOS
01.03.04.08.01 LAMPARAS
LUMINARIA LED SOBREPUESTO DOWNLIGHT CIRCULAR DE
01.03.04.08.01.01 und 9.00 98.79 0.00 0.00 9.00 889.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 889.110
18-24W
LUMINARIA LED SOBREPUESTO DOWNLIGHT CUADRADO DE
01.03.04.08.01.02 und 40.00 88.89 0.00 0.00 40.00 3,555.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,555.600
18-24W
LUMINARIA DE EMERGENCIA C/LAMPARA LED GIRATORIO
01.03.04.08.01.03 2x16W C/U MODELO DE JOSFEL O SIMILAR und 8.00 184.64 0.00 0.00 8.00 1,477.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,477.120
(ADOSADO/PARED)
01.03.04.09 VARIOS
01.03.04.09.01 MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS INSTALACIONES ELECTRICAS
01.03.04.09.01.01 m3 11.58 42.33 0.00 0.00 11.58 490.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 490.180
(0.25X0.75m)
RELLENO COMPACTADO DE ZANJAS INSTALACIONES
01.03.04.09.01.02 m3 11.58 33.44 11.58 387.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 387.240
ELECTRICAS (0.25X0.75m)
01.03.04.10 PRUEBAS ELÉCTRICAS Y/O HERMETICIDAD
01.03.04.10.01 PRUEBA DE AISLAMIENTO GLB 1.00 314.22 0.00 0.00 1.00 314.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 314.220
01.03.04.10.02 MEDICIÓN DE RESISTIVIDAD DE POZO A TIERRA und 1.00 174.22 0.00 0.00 1.00 174.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 174.220
01.04 SEGURIDAD Y SALUD
ELABORACIÓN, IMPLEMENTACIÓN Y ADMINISTRACIÓN DEL
01.04.01 GLB 1.00 5,000.00 0.00 0.00 1.00 5,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5,000.000
PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO
01.04.02 EQUIPOS DE PROTECCION INDIVIDUAL und 60.00 637.65 60.00 38,259.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 38,259.000
01.04.03 EQUIPOS DE PROTECCIÓN COLECTIVA GLB 1.00 1,935.72 1.00 1,935.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,935.720
01.04.04 SEÑALIZACIÓN TEMPORAL DE SEGURIDAD GLB 1.00 1,173.06 1.00 1,173.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,173.060
RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS DE
01.04.05 GLB 1.00 2,550.38 1.00 2,550.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,550.380
SEGURIDAD Y SALUD DURANTE EL TRABAJO
01.05 MITIGACION DE IMPACTO AMBIENTAL
01.05.01 RIEGO DE ZONA DE TRABAJO mes 6.00 1,596.48 1.00 1,596.48 1.00 1,596.48 1.00 1,596.48 1.00 1,596.48 1.00 1,596.48 1.00 1,596.48 9,578.880
01.05.02 RECICLAJE DE RESIDUOS SOLIDOS mes 6.00 259.94 1.00 259.94 1.00 259.94 1.00 259.94 1.00 259.94 1.00 259.94 1.00 259.94 1,559.640
01.05.03 DISPOSICION FINAL DE RESIDUOS SOLIDOS mes 6.00 1,016.31 1.00 1,016.31 1.00 1,016.31 1.00 1,016.31 1.00 1,016.31 1.00 1,016.31 1.00 1,016.31 6,097.860
01.05.04 MONITOREO DE PARTICULAS EN SUSPENSION mes 6.00 423.73 1.00 423.73 1.00 423.73 1.00 423.73 1.00 423.73 1.00 423.73 1.00 423.73 2,542.380
01.05.05 MONITOREO DEL RUIDO mes 6.00 395.48 1.00 395.48 1.00 395.48 1.00 395.48 1.00 395.48 1.00 395.48 1.00 395.48 2,372.880
01.05.06 LIMPIEZA PERMANENTE DE OBRA mes 6.00 456.31 1.00 456.31 1.00 456.31 1.00 456.31 1.00 456.31 1.00 456.31 1.00 456.31 2,737.860
01.06 PLAN DE MONITOREO ARQUEOLOGICO
01.06.01 PLAN DE MONITOREO ARQUEOLOGICO glb 1.00 10,000.00 0.50 5,000.00 0.50 5,000.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10,000.000
02 ESTRUCTURAS
02.01 MOVIMIENTO DE TIERRAS
02.01.01 EXCAVACIONES
EXCAVACION DE ZANJAS PARA ZAPATAS-FALSAS ZAPATAS
02.01.01.01 m3 3,099.31 9.24 0.00 0.00 109.80 1,014.54 2,989.51 27,623.08 0.00 0.00 0.00 0.00 0.00 0.00 28,637.620
C/MAQUINARIA
EXCAVACION DE ZANJA PARA CIMIENTOS CORRIDOS Y
02.01.01.02 m3 129.63 42.33 0.00 0.00 35.94 1,521.53 93.69 3,965.71 0.00 0.00 0.00 0.00 0.00 0.00 5,487.240
VIGAS DE CONEXION
02.01.01.03 PERFILADO MANUAL DE ZANJAS m2 5,371.79 1.85 0.00 0.00 4,818.62 8,914.45 553.17 1,023.36 0.00 0.00 0.00 0.00 0.00 0.00 9,937.810
02.01.02 RELLENOS
02.01.02.01 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 1,519.12 34.90 0.00 0.00 0.00 0.00 1,519.12 53,017.29 0.00 0.00 0.00 0.00 0.00 0.00 53,017.290
02.01.02.02 RELLENO CON AFIRMADO COMPACTADO m3 562.54 159.47 0.00 0.00 0.00 0.00 539.88 86,094.90 22.66 3,613.35 0.00 0.00 0.00 0.00 89,708.250
02.01.03 NIVELACION INTERIOR Y APISONADO
NIVELACION INT. Y APISONADO FINAL P/RECIBIR AL FALSO
02.01.03.01 m2 2,232.00 5.28 0.00 0.00 0.00 0.00 0.00 0.00 2,232.00 11,784.96 0.00 0.00 0.00 0.00 11,784.960
PISO C/EQUIPO LIVIANO
02.01.04 ELIMINACION DE MATERIAL EXCEDENTE

ACARREO DE MATERIAL EXCENDENTE C/MAQUINARIA


02.01.04.01 m3 1,604.00 9.85 0.00 0.00 0.00 0.00 200.50 1,974.92 1,403.50 13,824.48 0.00 0.00 0.00 0.00 15,799.400
PROCEDENTE DE EXCAVACIONES
02.01.04.02 ELIMINACIÓN DE MATERIAL EXCEDENTE m3 1,604.00 15.17 0.00 0.00 0.00 0.00 0.00 0.00 1,604.00 24,332.68 0.00 0.00 0.00 0.00 24,332.680
02.02 OBRAS DE CONCRETO SIMPLE
02.02.01 CIMIENTOS CORRIDOS
CONCRETO CICLOPEO CEMENTO-HORMIGON 1:8+30%PM
02.02.01.01 m3 262.64 356.89 0.00 0.00 0.00 0.00 262.64 93,733.59 0.00 0.00 0.00 0.00 0.00 0.00 93,733.590
dmax=6"
02.02.01.02 ENCOFRADO Y DESENCOFRADO EN CIMIENTOS CORRIDOS m2 11.37 56.73 0.00 0.00 0.00 0.00 11.37 645.02 0.00 0.00 0.00 0.00 0.00 0.00 645.020
02.02.02 SOLADOS
02.02.02.01 CONCRETO f'c=100kg/cm2 PARA SOLADOS h=0.10m m2 1,191.90 33.95 0.00 0.00 0.00 0.00 1,191.90 40,465.01 0.00 0.00 0.00 0.00 0.00 0.00 40,465.010
02.02.03 FALSO PISO
02.02.03.01 CONCRETO FC=175 kg/cm² - PARA FALSO PISO H=0.10m m2 755.13 42.63 0.00 0.00 0.00 0.00 0.00 0.00 755.13 32,191.19 0.00 0.00 0.00 0.00 32,191.190
02.02.04 LOSA DEPORTIVA
CONCRETO f'c=210 kg/cm2 LOSA DEPORTIVA E=15CM,
02.02.04.01 m2 624.00 89.84 0.00 0.00 0.00 0.00 0.00 0.00 624.00 56,060.16 0.00 0.00 0.00 0.00 56,060.160
INCLUYE UÑA, ACABADO PULIDO Y BRUÑADO

02.02.04.02 ENCOFRADO Y DESENCOFRADO EN LOSA DEPORTIVA m2 74.85 60.85 0.00 0.00 0.00 0.00 0.00 0.00 74.85 4,554.62 0.00 0.00 0.00 0.00 4,554.620
02.02.04.03 JUNTA ASFALTICA 1"X 2" m 261.00 7.32 0.00 0.00 0.00 0.00 0.00 0.00 261.00 1,910.52 0.00 0.00 0.00 0.00 1,910.520
02.02.05 PATIO DE FORMACION
CONCRETO f'c=210 kg/cm2 PATIO DE FORMACION
02.02.05.01 m2 165.07 89.84 0.00 0.00 0.00 0.00 0.00 0.00 165.07 14,829.89 0.00 0.00 0.00 0.00 14,829.890
E=15CM, INCLUYE ACABADO SEMIPULIDO Y BRUÑADO

02.02.05.02 ENCOFRADO Y DESENCOFRADO EN PATIOS DE FORMACION m2 178.36 60.85 0.00 0.00 0.00 0.00 0.00 0.00 178.36 10,853.21 0.00 0.00 0.00 0.00 10,853.210
02.02.05.03 JUNTA ASFALTICA 1"X 2" m 461.10 7.32 0.00 0.00 0.00 0.00 0.00 0.00 415.97 3,044.88 45.13 330.37 0.00 0.00 3,375.250
02.02.06 FALSA ZAPATA
CONCRETO CICLOPEO CEMENTO-HORMIGON 1:12+30%PG
02.02.06.01 m3 159.29 356.89 0.00 0.00 0.00 0.00 159.29 56,849.01 0.00 0.00 0.00 0.00 0.00 0.00 56,849.010
dmax=6" PARA FALSA ZAPATA
02.03 OBRAS DE CONCRETO ARMADO
02.03.01 ZAPATAS
02.03.01.01 CONCRETO F'C=210KG/CM2 PARA ZAPATAS m3 309.30 457.66 0.00 0.00 0.00 0.00 16.25 7,437.31 293.05 134,116.93 0.00 0.00 0.00 0.00 141,554.240
02.03.01.02 ACERO fy=4200 kg/cm2 PARA ZAPATAS kg 16,092.86 6.53 0.00 0.00 0.00 0.00 16,092.86 105,086.38 0.00 0.00 0.00 0.00 0.00 0.00 105,086.380
02.03.01.03 CURADO DE CONCRETO EN ZAPATAS m2 497.42 2.94 0.00 0.00 0.00 0.00 0.00 0.00 497.42 1,462.41 0.00 0.00 0.00 0.00 1,462.410
CRONOGRAMA DE AVANCE VALORIZADO
OBRA MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E 80659 NUESTRA SEÑORA DE FATIMA DEL CASERIO DE TOGOPON DEL DISTRITO DE CARABAMBA PROVINCIA DE JULCAN DEPARTAMENTO DE LA LIBERTAD

Lugar LA LIBERTAD - JULCAN - CARABAMBA


1 1 2 2 3 3 4 4 5 5 6 6
MES 01 MES 02 MES 03 MES 04 MES 05 MES 06
PRECIO
Item Descripción UNIDAD METRADO TOTAL
UNITARIO S/. Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial
02.03.02 VIGAS DE CIMENTACION
02.03.02.01 CONCRETO f'c=210 kg/cm2 PARA VIGAS DE CIMENTACION m3 22.83 451.98 0.00 0.00 0.00 0.00 0.00 0.00 22.83 10,318.70 0.00 0.00 0.00 0.00 10,318.700

02.03.02.02 ENCOFRADO Y DESENCOFRADO DE VIGAS DE CIMENTACION m2 140.26 60.85 0.00 0.00 0.00 0.00 140.26 8,534.82 0.00 0.00 0.00 0.00 0.00 0.00 8,534.820

02.03.02.03 ACERO fy=4200 kg/cm2 VIGAS DE CIMENTACION kg 8,416.86 6.53 0.00 0.00 0.00 0.00 8,416.86 54,962.10 0.00 0.00 0.00 0.00 0.00 0.00 54,962.100

02.03.02.04 CURADO DE CONCRETO VIGA DE CIMENTACION m2 121.44 1.31 0.00 0.00 0.00 0.00 0.00 0.00 121.44 159.09 0.00 0.00 0.00 0.00 159.090
02.03.03 SOBRECIMIENTO REFORZADO
CONCRETO f'c= 175kg/cm2 PARA SOBRECIMIENTO
02.03.03.01 m3 71.44 417.19 0.00 0.00 0.00 0.00 71.44 29,804.05 0.00 0.00 0.00 0.00 0.00 0.00 29,804.050
REFORZADO
ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO
02.03.03.02 m2 975.28 63.67 0.00 0.00 0.00 0.00 975.28 62,096.08 0.00 0.00 0.00 0.00 0.00 0.00 62,096.080
REFORZADO
02.03.03.03 ACERO fy=4200 kg/cm2 EN SOBRECIMIENTO REFORZADO kg 4,107.11 6.53 0.00 0.00 0.00 0.00 4,107.11 26,819.43 0.00 0.00 0.00 0.00 0.00 0.00 26,819.430

02.03.03.04 CURADO DE CONCRETO SOBRECIMIENTO REFORZADO m2 972.06 1.31 0.00 0.00 0.00 0.00 972.06 1,273.40 0.00 0.00 0.00 0.00 0.00 0.00 1,273.400
02.03.04 MUROS REFORZADOS
02.03.04.01 MUROS DE CONTENCION
02.03.04.01.01 CONCRETO f'c=210 kg/cm2 PARA MUROS DE CONTENCION m3 698.22 481.83 0.00 0.00 0.00 0.00 668.10 321,912.76 30.12 14,510.58 0.00 0.00 0.00 0.00 336,423.340
ENCOFRADO Y DESENCOFRADO DE MUROS DE
02.03.04.01.02 m2 1,365.49 74.53 0.00 0.00 0.00 0.00 1,312.33 97,807.69 53.16 3,962.28 0.00 0.00 0.00 0.00 101,769.970
CONTENCION
02.03.04.01.03 ACERO fy=4200 kg/cm2 EN MUROS DE CONTENCION kg 80,489.85 6.53 0.00 0.00 0.00 0.00 80,453.55 525,361.68 36.30 237.04 0.00 0.00 0.00 0.00 525,598.720

02.03.04.01.04 CURADO DE CONCRETO EN MURO DE CONTENCION m2 1,099.68 1.62 0.00 0.00 0.00 0.00 0.00 0.00 1,099.68 1,781.48 0.00 0.00 0.00 0.00 1,781.480
02.03.04.02 PLACAS
02.03.04.02.01 CONCRETO f'c=210 kg/cm2 PARA PLACAS m3 41.89 481.83 0.00 0.00 0.00 0.00 41.39 19,943.69 0.50 240.17 0.00 0.00 0.00 0.00 20,183.860
02.03.04.02.02 ENCOFRADO Y DESENCOFRADO EN PLACAS m2 365.57 74.53 0.00 0.00 0.00 0.00 365.57 27,245.93 0.00 0.00 0.00 0.00 0.00 0.00 27,245.930
02.03.04.02.03 ACERO f'y = 4200 kg/cm² EN PLACAS kg 11,670.82 6.53 0.00 0.00 0.00 0.00 11,670.82 76,210.45 0.00 0.00 0.00 0.00 0.00 0.00 76,210.450
02.03.04.02.04 CURADO DE CONCRETO EN PLACAS m2 365.57 1.62 0.00 0.00 0.00 0.00 0.00 0.00 365.57 592.22 0.00 0.00 0.00 0.00 592.220
02.03.04.03 ACERO DE AMARRE EN MUROS PORTANTES

02.03.04.03.01 ACERO f'y = 4200 kg/cm² EN MUROS PORTANTES kg 1,006.86 6.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,006.86 6,574.80 0.00 0.00 6,574.800
02.03.05 COLUMNAS
02.03.05.01 CONCRETO f'c=210 kg/cm2 PARA COLUMNAS m3 132.69 544.44 0.00 0.00 0.00 0.00 2.30 1,251.55 130.39 70,990.19 0.00 0.00 0.00 0.00 72,241.740
02.03.05.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS m2 1,154.48 85.37 0.00 0.00 0.00 0.00 1,154.48 98,557.96 0.00 0.00 0.00 0.00 0.00 0.00 98,557.960
02.03.05.03 ACERO f'y = 4200 kg/cm² EN COLUMNAS kg 26,714.40 6.53 0.00 0.00 0.00 0.00 26,714.40 174,445.03 0.00 0.00 0.00 0.00 0.00 0.00 174,445.030
02.03.05.04 CURADO DE CONCRETO EN COLUMNAS m2 1,245.53 1.62 0.00 0.00 0.00 0.00 0.00 0.00 1,245.53 2,017.76 0.00 0.00 0.00 0.00 2,017.760
02.03.06 COLUMNETAS
02.03.06.01 CONCRETO f'c=175 kg/cm2 PARA COLUMNETAS m3 28.48 505.54 0.00 0.00 0.00 0.00 0.00 0.00 28.48 14,397.78 0.00 0.00 0.00 0.00 14,397.780

02.03.06.02 ENCOFRADO Y DESENCOFRADO EN COLUMNETAS m2 489.12 86.39 0.00 0.00 0.00 0.00 0.00 0.00 489.12 42,255.08 0.00 0.00 0.00 0.00 42,255.080
02.03.06.03 ACERO fy=4200 kg/cm2 EN COLUMNETAS kg 3,885.16 6.53 0.00 0.00 0.00 0.00 0.00 0.00 3,885.16 25,370.09 0.00 0.00 0.00 0.00 25,370.090
02.03.06.04 CURADO DE CONCRETO EN COLUMNETAS m2 492.48 1.62 0.00 0.00 0.00 0.00 0.00 0.00 410.57 665.12 81.91 132.70 0.00 0.00 797.820
02.03.07 VIGAS
02.03.07.01 CONCRETO f'c=210 kg/cm2 PARA VIGAS m3 121.05 453.29 0.00 0.00 0.00 0.00 0.00 0.00 121.05 54,870.75 0.00 0.00 0.00 0.00 54,870.750
02.03.07.02 ENCOFRADO Y DESENCOFRADO EN VIGAS m2 885.77 96.08 0.00 0.00 0.00 0.00 749.38 72,000.17 136.39 13,104.61 0.00 0.00 0.00 0.00 85,104.780
02.03.07.03 ACERO f'y = 4200 kg/cm² EN VIGAS kg 14,790.11 6.53 0.00 0.00 0.00 0.00 3,611.46 23,582.85 11,178.65 72,996.57 0.00 0.00 0.00 0.00 96,579.420
02.03.07.04 CURADO DE CONCRETO EN VIGAS m2 902.87 1.62 0.00 0.00 0.00 0.00 0.00 0.00 902.87 1,462.65 0.00 0.00 0.00 0.00 1,462.650
02.03.08 VIGAS DE AMARRE
02.03.08.01 CONCRETO f'c=175 kg/cm2 PARA VIGAS DE AMARRE m3 36.57 433.50 0.00 0.00 0.00 0.00 0.00 0.00 6.56 2,844.63 30.01 13,008.47 0.00 0.00 15,853.100

02.03.08.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE AMARRE m2 405.64 83.69 0.00 0.00 0.00 0.00 0.00 0.00 405.64 33,948.01 0.00 0.00 0.00 0.00 33,948.010

02.03.08.03 ACERO f'y = 4200 kg/cm² EN VIGAS DE AMARRE kg 5,188.66 6.53 0.00 0.00 0.00 0.00 0.00 0.00 5,188.66 33,881.95 0.00 0.00 0.00 0.00 33,881.950

02.03.08.04 CURADO DE CONCRETO EN VIGAS DE AMARRE m2 410.87 1.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 410.87 665.61 0.00 0.00 665.610
02.03.09 LOSAS
02.03.09.01 LOSAS MACIZAS
02.03.09.01.01 CONCRETO f'c=280 kg/cm2 PARA LOSA MACIZA m3 14.40 493.52 0.00 0.00 0.00 0.00 0.00 0.00 14.40 7,106.69 0.00 0.00 0.00 0.00 7,106.690

02.03.09.01.02 ENCOFRADO Y DESENCOFRADO EN LOSAS MACIZAS m2 70.92 76.94 0.00 0.00 0.00 0.00 0.00 0.00 70.92 5,456.58 0.00 0.00 0.00 0.00 5,456.580
02.03.09.01.03 ACERO f'y = 4200 kg/cm² EN LOSAS MACIZAS kg 1,297.97 6.53 0.00 0.00 0.00 0.00 0.00 0.00 1,297.97 8,475.74 0.00 0.00 0.00 0.00 8,475.740
02.03.09.01.04 CURADO DE CONCRETO EN LOSA MACIZA m2 99.26 1.31 0.00 0.00 0.00 0.00 0.00 0.00 99.26 130.03 0.00 0.00 0.00 0.00 130.030
02.03.09.02 LOSAS ALIGERADAS CONVENCIONALES
CONCRETO f'c=210 kg/cm2 PARA LOSAS ALIGERADAS
02.03.09.02.01 m3 72.03 444.58 0.00 0.00 0.00 0.00 0.00 0.00 72.03 32,023.10 0.00 0.00 0.00 0.00 32,023.100
CONVENCIONALES
ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADAS
02.03.09.02.02 m2 778.67 83.31 0.00 0.00 0.00 0.00 692.03 57,653.16 86.64 7,217.84 0.00 0.00 0.00 0.00 64,871.000
CONVENCIONALES
ACERO fy=4200 kg/cm2 EN LOSAS ALIGERADAS
02.03.09.02.03 kg 5,280.90 6.53 0.00 0.00 0.00 0.00 0.00 0.00 5,280.90 34,484.28 0.00 0.00 0.00 0.00 34,484.280
CONVENCIONALES
LADRILLO HUECO/ARCILLA 15X30X30 P/TECHO A EN LOSA
02.03.09.02.04 und 6,491.00 4.26 0.00 0.00 0.00 0.00 0.00 0.00 6,491.00 27,651.66 0.00 0.00 0.00 0.00 27,651.660
LIGERADA
02.03.09.02.05 CURADO DE CONCRETO EN LOSA ALIGERADA m2 778.67 1.31 0.00 0.00 0.00 0.00 0.00 0.00 778.67 1,020.06 0.00 0.00 0.00 0.00 1,020.060
02.03.10 TANQUE SEPTICO
02.03.10.01 CONCRETO f'c=280kg/cm2 EN TANQUE SEPTICO m3 15.08 530.23 0.00 0.00 0.00 0.00 0.00 0.00 15.08 7,995.87 0.00 0.00 0.00 0.00 7,995.870

02.03.10.02 ENCOFRADO Y DESENCOFRADO DE TANQUE SEPTICO m2 72.63 72.34 0.00 0.00 0.00 0.00 0.00 0.00 72.63 5,254.05 0.00 0.00 0.00 0.00 5,254.050
02.03.10.03 ACERO f'y = 4200 kg/cm² - TANQUE SEPTICO kg 1,068.87 6.53 0.00 0.00 0.00 0.00 0.00 0.00 1,068.87 6,979.72 0.00 0.00 0.00 0.00 6,979.720
02.03.10.04 CURADO DE CONCRETO EN TANQUE SEPTICO m2 18.13 1.31 0.00 0.00 0.00 0.00 0.00 0.00 18.13 23.75 0.00 0.00 0.00 0.00 23.750
02.03.11 GRADERIAS
02.03.11.01 CONCRETO F'C= 210 KG/CM2. PARA GRADERIAS m3 25.99 417.19 0.00 0.00 0.00 0.00 0.00 0.00 25.99 10,842.77 0.00 0.00 0.00 0.00 10,842.770

02.03.11.02 ENCOFRADO Y DESENCOFRADO EN GRADERIAS m2 185.92 63.67 0.00 0.00 0.00 0.00 0.00 0.00 185.92 11,837.53 0.00 0.00 0.00 0.00 11,837.530
02.03.11.03 ACERO f'y = 4200 kg/cm² PARA GRADERIAS kg 839.29 6.53 0.00 0.00 0.00 0.00 0.00 0.00 839.29 5,480.56 0.00 0.00 0.00 0.00 5,480.560
02.03.11.04 CURADO DE CONCRETO PARA GRADERIAS m2 43.20 1.17 0.00 0.00 0.00 0.00 0.00 0.00 43.20 50.54 0.00 0.00 0.00 0.00 50.540
02.03.12 ESCALERAS
02.03.12.01 CONCRETO f'c=175 kg/cm2 PARA ESCALERAS m3 8.23 417.19 0.00 0.00 0.00 0.00 0.00 0.00 8.23 3,433.47 0.00 0.00 0.00 0.00 3,433.470
02.03.12.02 ENCOFRADO Y DESENCOFRADO EN ESCALERAS m2 40.74 63.67 0.00 0.00 0.00 0.00 0.00 0.00 40.74 2,593.92 0.00 0.00 0.00 0.00 2,593.920
02.03.12.03 ACERO f'y= 4200 kg/cm2 EN ESCALERAS kg 490.72 6.53 0.00 0.00 0.00 0.00 0.00 0.00 490.72 3,204.40 0.00 0.00 0.00 0.00 3,204.400
02.03.12.04 CURADO DE CONCRETO EN ESCALERAS m2 40.74 1.17 0.00 0.00 0.00 0.00 0.00 0.00 40.74 47.67 0.00 0.00 0.00 0.00 47.670
02.03.13 RAMPAS
02.03.13.01 CONCRETO f'c=175 kg/cm2 PARA RAMPAS m3 11.66 417.19 0.00 0.00 0.00 0.00 0.00 0.00 11.66 4,864.44 0.00 0.00 0.00 0.00 4,864.440
02.03.13.02 ENCOFRADO Y DESENCOFRADO EN RAMPAS m2 13.16 63.67 0.00 0.00 0.00 0.00 0.00 0.00 13.16 837.90 0.00 0.00 0.00 0.00 837.900
02.03.13.03 ACERO fy=4200 kg/cm2 EN RAMPAS kg 342.22 6.53 0.00 0.00 0.00 0.00 0.00 0.00 342.22 2,234.70 0.00 0.00 0.00 0.00 2,234.700
02.03.13.04 CURADO DE CONCRETO EN RAMPAS m2 58.95 1.17 0.00 0.00 0.00 0.00 0.00 0.00 58.95 68.97 0.00 0.00 0.00 0.00 68.970
02.03.14 PEDESTAL DE CONCRETO - PATIO DE HONOR
02.03.14.01 CONCRETO f'c=175 kg/cm2 PARA PEDESTAL m3 7.10 475.89 0.00 0.00 0.00 0.00 0.00 0.00 7.10 3,378.82 0.00 0.00 0.00 0.00 3,378.820
02.03.14.02 ENCOFRADO Y DESENCOFRADO EN PEDESTAL m2 16.00 80.99 0.00 0.00 0.00 0.00 0.00 0.00 16.00 1,295.84 0.00 0.00 0.00 0.00 1,295.840
02.03.14.03 ACERO f'y= 4200 kg/cm2 EN PEDESTAL kg 87.31 6.53 0.00 0.00 0.00 0.00 0.00 0.00 87.31 570.13 0.00 0.00 0.00 0.00 570.130
02.03.14.04 CURADO DE CONCRETO EN PEDESTAL m2 16.00 1.03 0.00 0.00 0.00 0.00 0.00 0.00 14.54 14.98 1.46 1.50 0.00 0.00 16.480
02.03.15 BANCAS DE CONCRETO
CRONOGRAMA DE AVANCE VALORIZADO
OBRA MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E 80659 NUESTRA SEÑORA DE FATIMA DEL CASERIO DE TOGOPON DEL DISTRITO DE CARABAMBA PROVINCIA DE JULCAN DEPARTAMENTO DE LA LIBERTAD

Lugar LA LIBERTAD - JULCAN - CARABAMBA


1 1 2 2 3 3 4 4 5 5 6 6
MES 01 MES 02 MES 03 MES 04 MES 05 MES 06
PRECIO
Item Descripción UNIDAD METRADO TOTAL
UNITARIO S/. Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial
02.03.15.01 CONCRETO F'C= 175KG/CM2. - EN BANCAS m3 6.64 466.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.64 3,096.30 0.00 0.00 3,096.300
02.03.15.02 ENCOFRADO Y DESENCOFRADO EN BANCAS m2 46.40 91.12 0.00 0.00 0.00 0.00 0.00 0.00 6.11 556.48 40.29 3,671.49 0.00 0.00 4,227.970
02.03.15.03 ACERO f'y = 4200 kg/cm² - EN BANCAS kg 510.00 6.53 0.00 0.00 0.00 0.00 0.00 0.00 510.00 3,330.30 0.00 0.00 0.00 0.00 3,330.300
02.03.15.04 CURADO DE CONCRETO EN BANCAS m2 14.32 1.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14.32 14.75 0.00 0.00 14.750
02.03.16 CISTERNA ,TANQUE ELEVADO
CONCRETO F'C= 280KG/CM2 EN CISTERNA, TANQUE
02.03.16.01 m3 42.33 466.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 42.33 19,747.37 0.00 0.00 19,747.370
ELEVADO
ENCOFRADO Y DESENCOFRADO EN CISTERNA, TANQUE
02.03.16.02 m2 232.74 76.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 232.74 17,907.02 0.00 0.00 17,907.020
ELEVADO
02.03.16.03 ACERO f'y = 4200 kg/cm² - EN CISTERNA TANQUE ELEVADO kg 3,880.68 6.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,880.68 25,340.84 0.00 0.00 25,340.840

02.03.16.04 CURADO DE CONCRETO EN CISTERNA, TANQUE ELEVADO m2 278.41 4.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 278.41 1,124.78 0.00 0.00 1,124.780
02.03.17 CAMARA DE DISTRIBUCION
02.03.17.01 CONCRETO F'C= 210KG/CM2 EN CAMARA DE DISTRIBUCION m3 2.37 474.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.37 1,123.81 0.00 0.00 1,123.810
ENCOFRADO Y DESENCOFRADO EN CAMARA DE
02.03.17.02 m2 7.46 74.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.46 556.44 0.00 0.00 556.440
DISTRIBUCION
02.03.17.03 ACERO f'y = 4200 kg/cm² - EN CAMARA DE DISTRIBUCION kg 54.09 6.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 54.09 353.21 0.00 0.00 353.210

02.03.17.04 CURADO DE CONCRETO EN CAMARA DE DISTRIBUCION m2 6.10 1.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.10 7.99 0.00 0.00 7.990
02.03.18 POZO PERCOLADOR
02.03.18.01 CONCRETO F'C= 210KG/CM2 EN POZO PERCOLADOR m3 1.49 474.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.49 706.53 0.00 0.00 706.530

02.03.18.02 ENCOFRADO Y DESENCOFRADO EN POZO PERCOLADOR m2 5.92 74.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.92 441.57 0.00 0.00 441.570

02.03.18.03 ACERO f'y = 4200 kg/cm² - EN POZO PERCOLADOR kg 263.94 6.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 263.94 1,723.53 0.00 0.00 1,723.530

02.03.18.04 CURADO DE CONCRETO EN POZO PERCOLADOR m2 12.41 1.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.41 16.26 0.00 0.00 16.260

02.03.19 CAIDAS ESPECIALES EN LINEA DE DESAGÜE

02.03.19.01 CONCRETO F'C= 210KG/CM2 EN CAIDA ESPECIAL m3 0.66 474.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.66 312.96 0.00 0.00 312.960

02.03.19.02 ENCOFRADO Y DESENCOFRADO EN CAIDA ESPECIAL m2 7.72 74.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.72 575.83 0.00 0.00 575.830
02.03.19.03 ACERO f'y = 4200 kg/cm² - EN CAIDA ESPECIAL kg 46.48 6.53 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 46.48 303.51 0.00 0.00 303.510
02.03.19.04 CURADO DE CONCRETO EN CAIDA ESPECIAL m2 7.72 1.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.72 10.11 0.00 0.00 10.110
02.04 ESTRUCTURAS METALICAS
02.04.01 APOYOS Y COLUMNAS METALICAS
ANCLAJE METALICO EN PEDESTAL, DOBLE PLACA 0.40x0.40
02.04.01.01 und 6.00 1,236.26 0.00 0.00 0.00 0.00 0.00 0.00 6.00 7,417.56 0.00 0.00 0.00 0.00 7,417.560
m e=1/2"
02.04.01.02 COLUMNA METALICA H=4.50M und 6.00 526.80 0.00 0.00 0.00 0.00 0.00 0.00 6.00 3,160.80 0.00 0.00 0.00 0.00 3,160.800
02.04.01.03 APOYO METALICO FIJO und 7.00 2,495.65 0.00 0.00 0.00 0.00 0.00 0.00 6.92 17,266.40 0.08 203.15 0.00 0.00 17,469.550
02.04.01.04 APOYO METALICO MOVIL und 7.00 2,599.64 0.00 0.00 0.00 0.00 0.00 0.00 6.18 16,065.59 0.82 2,131.89 0.00 0.00 18,197.480
02.04.02 ARCOS Y VIGAS
02.04.02.01 VIGA PRINCIPAL VP-01 m 40.70 316.64 0.00 0.00 0.00 0.00 0.00 0.00 40.70 12,887.25 0.00 0.00 0.00 0.00 12,887.250
02.04.02.02 VIGUETA 01 2"X4"X3/16" m 64.50 89.64 0.00 0.00 0.00 0.00 0.00 0.00 57.59 5,162.00 6.91 619.78 0.00 0.00 5,781.780
02.04.02.03 ARCO PARABOLICO SEGUN DETALLE und 7.00 22,773.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.00 159,415.62 0.00 0.00 159,415.620
02.04.02.04 TENSOR ENTRE ARCO DE TIJERALES VAR. LISA DE 1/2" m 463.20 14.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 463.20 6,572.81 0.00 0.00 6,572.810
02.04.02.05 ARRIOSTRE 3"X3X3/16" m 185.58 61.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 185.58 11,374.20 0.00 0.00 11,374.200
02.04.02.06 COLGADOR DE ACERO LISO 5/8" m 123.76 66.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 123.76 8,190.44 0.00 0.00 8,190.440
02.04.02.07 TENSOR Ø 1" m 173.60 44.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 173.60 7,641.87 0.00 0.00 7,641.870
02.04.03 CORREAS METALICAS
02.04.03.01 CORREAS METALICAS DE 4"X4"X1/4" m 731.40 111.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 731.40 81,185.40 0.00 0.00 81,185.400
02.04.03.02 CORREAS TUBO CUADRADO DE 1.5" x 1.5" x 3mm. m 83.40 35.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 81.46 2,900.07 1.94 68.97 2,969.040
02.04.04 COBERTURA
02.04.04.01 COBERTURA METÁLICA - ALUZIN TR4-AZ150 m2 945.19 31.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 945.19 29,716.77 29,716.770
02.04.05 VARIOS
02.04.05.01 MURO DE LADRILLO C/JUNTA ABIERTA m2 38.42 115.24 0.00 0.00 0.00 0.00 0.00 0.00 38.42 4,427.52 0.00 0.00 0.00 0.00 4,427.520
02.04.05.02 RELLENO CON GRAVA EN POZO DE PERCOLACION m3 6.68 150.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.68 1,008.28 0.00 0.00 1,008.280
02.04.05.03 JUNTA DE 1" WATER STOP C/SELLADOR m 10.80 23.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.80 258.77 0.00 0.00 258.770
JUNTA DE POLIESTIRENO EXPANDIDO SELLADO CON
02.04.05.04 m 538.09 9.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 501.24 4,771.80 36.85 350.82 5,122.620
POLIURETANO DE 1"
02.04.05.05 JUNTA ASFALTICA DE 1" m 86.17 8.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 86.17 689.36 689.360
03 ARQUITECTURA, EVACUACIÓN Y SEÑALIZACIÓN
03.01 MUROS Y TABIQUES DE ALBAÑILERIA
03.01.01 MUROS DE ALBAÑILERIA CONFINADA
03.01.01.01 MURO DE LADRILLO KK TIPO IV CANTO M:1:4 E=1.5 cm m2 40.33 72.35 0.00 0.00 0.00 0.00 0.00 0.00 40.33 2,917.88 0.00 0.00 0.00 0.00 2,917.880

03.01.01.02 MURO DE LADRILLO KK TIPO IV SOGA M:1:4 E=1.5 cm m2 1,335.85 75.83 0.00 0.00 0.00 0.00 0.00 0.00 1,326.56 100,593.42 9.29 704.09 0.00 0.00 101,297.510

03.01.01.03 MURO DE LADRILLO KK TIPO IV CABEZA M:1:4 E=1.5 cm m2 68.32 125.43 0.00 0.00 0.00 0.00 0.00 0.00 10.87 1,363.82 57.45 7,205.56 0.00 0.00 8,569.380
03.01.01.04 MURO DE DRYWALL m2 15.98 81.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.98 1,306.37 0.00 0.00 1,306.370
03.02 REVOQUES Y REVESTIMIENTOS
03.02.01 TARRAJEO PRIMARIO, MORTERO C:A 1:5 m2 271.43 31.67 0.00 0.00 0.00 0.00 0.00 0.00 262.29 8,306.58 9.14 289.61 0.00 0.00 8,596.190
03.02.02 TARRAJEO EN MUROS INTERIORES E=1.5 cm, MEZCLA 1:5 m2 1,380.18 25.48 0.00 0.00 0.00 0.00 0.00 0.00 1,380.18 35,166.99 0.00 0.00 0.00 0.00 35,166.990

03.02.03 TARRAJEO EN MUROS EXTERIORES E=1.5 cm, MEZCLA 1:5 m2 1,272.71 38.14 0.00 0.00 0.00 0.00 0.00 0.00 1,272.71 48,541.16 0.00 0.00 0.00 0.00 48,541.160

03.02.04 TARRAJEO DE COLUMNAS INTERIOR E=1.5 cm, MEZCLA 1:5 m2 581.02 47.73 0.00 0.00 0.00 0.00 0.00 0.00 581.02 27,732.08 0.00 0.00 0.00 0.00 27,732.080
TARRAJEO DE COLUMNAS EXTERIOR E=1.5 cm, MEZCLA
03.02.05 m2 531.52 54.23 0.00 0.00 0.00 0.00 0.00 0.00 531.52 28,824.33 0.00 0.00 0.00 0.00 28,824.330
1:5
TARRAJEO DE COLUMNETAS INTERIOR E=1.5 cm, MEZCLA
03.02.06 m2 196.96 54.19 0.00 0.00 0.00 0.00 0.00 0.00 196.96 10,673.26 0.00 0.00 0.00 0.00 10,673.260
1:5
TARRAJEO DE COLUMNETAS EXTERIOR E=1.5 cm, MEZCLA
03.02.07 m2 81.44 54.19 0.00 0.00 0.00 0.00 0.00 0.00 81.44 4,413.23 0.00 0.00 0.00 0.00 4,413.230
1:5
03.02.08 TARRAJEO DE VIGAS INTERIOR E=1.5 cm, MEZCLA 1:5 m2 606.34 65.36 0.00 0.00 0.00 0.00 0.00 0.00 606.34 39,630.38 0.00 0.00 0.00 0.00 39,630.380

03.02.09 TARRAJEO DE VIGAS EXTERIOR E=1.5 cm, MEZCLA 1:5 m2 482.51 65.36 0.00 0.00 0.00 0.00 0.00 0.00 482.51 31,536.85 0.00 0.00 0.00 0.00 31,536.850

03.02.10 TARRAJEO DE VIGUETAS INTERIOR E=1.5 cm, MEZCLA 1:5 m2 94.75 65.36 0.00 0.00 0.00 0.00 0.00 0.00 94.75 6,192.86 0.00 0.00 0.00 0.00 6,192.860

03.02.11 TARRAJEO DE VIGUETAS EXTERIOR E=1.5 cm, MEZCLA 1:5 m2 36.73 65.36 0.00 0.00 0.00 0.00 0.00 0.00 36.73 2,400.67 0.00 0.00 0.00 0.00 2,400.670
03.02.12 VESTIDURA DE DERRAMES (1:5) m 583.13 17.99 0.00 0.00 0.00 0.00 0.00 0.00 583.13 10,490.51 0.00 0.00 0.00 0.00 10,490.510
TARRAJEO DE PEDESTALES PARA ASTAS E=1.5 cm,
03.02.13 m2 4.00 41.23 0.00 0.00 0.00 0.00 0.00 0.00 4.00 164.92 0.00 0.00 0.00 0.00 164.920
MEZCLA 1:5
03.02.14 BRUÑAS E=1.0 CM, SEGÚN DETALLE m 3,993.64 8.32 0.00 0.00 0.00 0.00 0.00 0.00 3,993.64 33,227.08 0.00 0.00 0.00 0.00 33,227.080
TARRAJEO DE MUROS DE CONTENCIÓN E=1.5 cm, MEZCLA
03.02.15 m2 662.05 38.14 0.00 0.00 0.00 0.00 0.00 0.00 662.05 25,250.59 0.00 0.00 0.00 0.00 25,250.590
1:5
03.02.16 TARRAJEO DE MURO EN RAMPAS E=1.5 cm, MEZCLA 1:5 m2 224.58 38.14 0.00 0.00 0.00 0.00 0.00 0.00 83.26 3,175.39 141.32 5,390.09 0.00 0.00 8,565.480

03.02.17 TARRAJEO DE MURO EN JARDINERA E=1.5 cm, MEZCLA 1:5 m2 50.57 31.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50.57 1,603.57 0.00 0.00 1,603.570
JUNTA DILATACIÓN DE 1" CON RELLENO DE TECNOPOR Y
03.02.18 m 230.00 33.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 230.00 7,626.80 0.00 0.00 7,626.800
SELLADO CON CAUCHO (M.C.)
03.03 CIELO RASO
03.03.01 CIELO RASO CON MEZCLA C:A 1:5 m2 1,087.26 46.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 967.83 45,042.92 119.43 5,558.16 50,601.080
03.04 PISOS Y PAVIMENTOS
03.04.01 CONTRAPISOS
CRONOGRAMA DE AVANCE VALORIZADO
OBRA MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E 80659 NUESTRA SEÑORA DE FATIMA DEL CASERIO DE TOGOPON DEL DISTRITO DE CARABAMBA PROVINCIA DE JULCAN DEPARTAMENTO DE LA LIBERTAD

Lugar LA LIBERTAD - JULCAN - CARABAMBA


1 1 2 2 3 3 4 4 5 5 6 6
MES 01 MES 02 MES 03 MES 04 MES 05 MES 06
PRECIO
Item Descripción UNIDAD METRADO TOTAL
UNITARIO S/. Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial
03.04.01.01 CONTRAPISO DE 40 mm m2 1,940.11 32.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,940.11 62,762.56 0.00 0.00 62,762.560
03.04.02 PISOS
PISO PORCELANATO ALTO TRANSITO 0.60x0.60 ACABADO
03.04.02.01 m2 378.62 90.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 284.33 25,848.37 94.29 8,571.97 34,420.340
BRILLANTE Y LISO BEIGE
PISO CERÁMICO ANTIDESLIZANTE COLOR 45x45 CM ALTO
03.04.02.02 m2 172.30 57.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 152.04 8,795.42 20.26 1,172.14 9,967.560
TRÁNSITO COLOR MARFIL O SIMILAR
03.04.03 PISOS DE CONCRETO
03.04.03.01 PISO DE CEMENTO SEMI PULIDO m2 434.89 12.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 434.89 5,544.85 5,544.850
03.04.04 VEREDAS
CONCRETO EN VEREDA H=0.10M, INCLUYE ACABADO
03.04.04.01 m2 412.39 42.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 412.39 17,580.19 0.00 0.00 17,580.190
SEMIPULIDO
03.04.04.02 ENCOFRADO Y DESENCOFRADO PARA VEREDA m2 32.48 56.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 32.48 1,842.59 0.00 0.00 1,842.590
03.04.04.03 JUNTA DE CONSTRUCCION EN VEREDAS E=1" m 86.15 8.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 86.15 689.20 0.00 0.00 689.200
03.04.04.04 CONCRETO EN UÑAS DE VEREDA m3 32.27 417.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 32.27 13,462.72 0.00 0.00 13,462.720
03.04.05 RAMPAS
03.04.05.01 FROTACHADO Y BRUÑADO @ 0.10 m. m2 64.80 23.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 64.80 1,500.12 0.00 0.00 1,500.120
03.04.06 SARDINELES
03.04.06.01 REVESTIDO DE SARDINELES MORTERO C:A, 1:4, e=1.5CM m 68.35 8.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 68.35 574.14 0.00 0.00 574.140

03.04.06.02 RELLENO DE JUNTAS (CON MATERIAL ASFÁLTICO) m 111.98 8.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 111.98 895.84 0.00 0.00 895.840
03.05 ZOCALOS Y CONTRAZOCALOS
03.05.01 ZOCALOS
03.05.01.01 ZOCALO DE CERAMICO H=1.50 E=2 CM m2 604.20 58.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 577.11 34,015.01 27.09 1,596.54 35,611.550
REVESTIMIENTO DE MESADA DE CONCRETO CON
03.05.01.02 m2 32.15 93.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 26.07 2,438.23 6.08 569.08 3,007.310
CERAMICO
REVESTIMIENTO DE MESADA DE CONCRETO CON
03.05.01.03 m2 39.43 93.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.94 930.02 29.49 2,758.26 3,688.280
PORCELANATO 1.20x0.60
03.05.02 CONTRAZOCALOS
03.05.02.01 CONTRAZOCALO DE PORCELANATO H=10 CM E=1.5 CM m 220.56 22.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 185.53 4,216.99 35.03 796.34 5,013.330

03.05.02.02 CONTRAZOCALO DE CERAMICO H=10 CM E=1.5 CM m 67.31 37.25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 67.31 2,507.30 2,507.300
CONTRAZOCALOS CEMENTO PULIDO CON ENDURECEDOR
03.05.02.03 m 154.14 49.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 138.85 6,891.24 15.29 758.73 7,649.970
H=10 CM E=1.5 CM
CONTRAZOCALOS CEMENTO PULIDO CON ENDURECEDOR
03.05.02.04 m 234.38 54.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 137.82 7,485.19 96.56 5,243.99 12,729.180
H=30 CM E=1.5 CM
03.06 COBERTURAS
03.06.01 COBERTURA TEJA ANDINA DE FIBRACEMENTO 1.14x0.72 m2 1,158.21 63.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,158.21 73,974.87 73,974.870
03.06.02 CUMBRERA PARA TEJA ANDINA m 112.38 62.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 112.38 6,994.53 6,994.530
LISTONES TUBO RECTANGULAR GALVANIZADO
03.06.03 m 1,167.39 30.52 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,167.39 35,628.74 35,628.740
40x60x1.8mm
03.06.04 LADRILLO PASTELERO 0.24 x 0.24 x 0.03 m. m2 15.98 55.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.98 886.89 886.890
03.07 CARPINTERIA DE MADERA
03.07.01 PUERTAS
PUERTA APANELADA DE MARCOJO CAJON DE 2"x4" DE
03.07.01.01 MADERA TORNILLO, HOJA ENCHAPADA DE PLAFÓN DE m2 72.39 525.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 72.39 38,069.18 38,069.180
MADERA TORNILLO
PUERTA APANELADA DE MARCOJO CAJON DE 2"x4" DE
03.07.01.02 MADERA TORNILLO, HOJA DE TRIPLAY LUPUNA,MDF O m2 8.82 511.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.82 4,510.28 4,510.280
SIMILAR DE 4mm
PUERTA DE MELAMINE ESTRUCTURA DE ALUMINIO, HOJA
03.07.01.03 m2 7.56 718.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.56 5,435.49 5,435.490
DE MELAMINE RH DE 18mm. RESISTENTE AL AGUA(RH)
03.07.02 MOBILIARIO EXTERIOR
LISTONES PARA BANCA DE MADERA TORNILLO 1.55 m. X 3"
03.07.02.01 und 8.00 49.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 392.00 392.000
X 2"
03.08 CARPINTERIA METALICA Y HERRERIA
03.08.01 VENTANAS DE ALUMINIO
VENTANA DE ALUMINIO CON VIDRIO TEMPLADO CON
03.08.01.01 m2 142.86 745.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 142.86 106,476.42 106,476.420
LAMINA DE SEGURIDAD 6 MM (CORREDIZA)
03.08.02 PUERTA METALICA
REJA METALICA PLEGABLE DE CINCO ACORDEONES CON
03.08.02.01 m2 8.85 169.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.85 1,499.99 1,499.990
RODANTE SELLADOS
03.08.02.02 PUERTA - REJA METALICA SISTEMA PLEGABLE m2 4.15 169.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.15 703.38 703.380
03.08.02.03 PUERTA METALICA DE INGRESOS m2 28.80 376.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 28.80 10,850.69 10,850.690
03.08.03 PASAMANOS
PASAMANOS TUBULAR DE ACERO INOXIDABLE DE Ø = 1-
03.08.03.01 und 6.00 80.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 485.34 485.340
1/2" EN SS.HH.
03.08.03.02 PASAMANOS DE FIERRO GALVANIZADO DE Ø 2" X 1/4 m 101.75 72.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 101.75 7,384.00 7,384.000
03.08.04 BARANDAS
BARANDA DE PROTECCION EN RAMPAS H=1.00 m FIERRO
03.08.04.01 NEGRO CON PROTECCIÓN DE PINTURA ANTICORROSIVA Y m 89.25 67.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 89.25 6,021.70 6,021.700
ESMALTE
03.08.05 ESCALERAS
03.08.05.01 ESCALERA DE GATO DE FIERRO GALVANIZADO und 1.00 7,225.77 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 7,225.77 7,225.770
03.08.05.02 ESCALERA DE ACCESO A CISTERNA und 1.00 292.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 292.87 292.870
03.08.06 ELEMENTOS METÁLICOS ESPECIALES
03.08.06.01 MARCO Y TAPA METÁLICA DE 0.80X0.80 EN CISTERNA und 2.00 263.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 527.70 527.700
03.08.06.02 CANTONERA DE ALUMINIO m 79.65 29.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 79.65 2,331.36 2,331.360
03.08.07 CERCO DE MALLA METALICA
03.08.07.01 CERCO DE MALLA METALICA CON PARANTES m 63.70 196.60 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 63.70 12,523.42 12,523.420
03.09 CERRAJERIA
03.09.01 BISAGRAS
03.09.01.01 BISAGRA ALUMINIZADA DE 3 1/2" PESADA pza 147.00 9.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 147.00 1,365.63 1,365.630
03.09.02 CERRADURAS
03.09.02.01 CERRADURA DE TRES GOLPES EN PUERTAS EXTERIORES pza 19.00 114.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19.00 2,184.62 2,184.620

03.09.02.02 CERRADURA DE PERILLA EN PUERTAS INTERIORES pza 6.00 94.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 566.16 566.160
03.09.02.03 CERRADURA TIPO PALANCA pza 22.00 98.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.00 2,156.66 2,156.660
03.09.02.04 JALADOR METALICO PARA PUERTA und 4.00 55.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 221.88 221.880
03.09.02.05 TOPES DE GOMA PARA PUERTAS pza 22.00 19.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 22.00 427.02 427.020
GANCHO METALICO PARA REJA PERFORADO PARA
03.09.02.06 pza 2.00 34.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 68.78 68.780
CANDADO
03.10 PINTURA
03.10.01 PINTURA LATEX 2 MANOS EN MUROS INTERIORES m2 1,380.18 15.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,380.18 20,757.91 20,757.910

03.10.02 PINTURA LATEX 2 MANOS EN MUROS EXTERIORES m2 1,272.71 16.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,272.71 21,216.08 21,216.080

03.10.03 PINTURA LATEX 2 MANOS EN MUROS DE DRYWALL m2 15.98 15.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.98 240.34 240.340

03.10.04 PINTURA LATEX 2 MANOS EN COLUMNAS INTERIORES m2 581.02 15.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 581.02 8,738.54 8,738.540

03.10.05 PINTURA LATEX 2 MANOS EN COLUMNAS EXTERIORES m2 531.54 18.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 531.54 9,721.87 9,721.870

03.10.06 PINTURA LATEX 2 MANOS EN COLUMNETAS INTERIORES m2 196.96 17.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 196.96 3,448.77 3,448.770
CRONOGRAMA DE AVANCE VALORIZADO
OBRA MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E 80659 NUESTRA SEÑORA DE FATIMA DEL CASERIO DE TOGOPON DEL DISTRITO DE CARABAMBA PROVINCIA DE JULCAN DEPARTAMENTO DE LA LIBERTAD

Lugar LA LIBERTAD - JULCAN - CARABAMBA


1 1 2 2 3 3 4 4 5 5 6 6
MES 01 MES 02 MES 03 MES 04 MES 05 MES 06
PRECIO
Item Descripción UNIDAD METRADO TOTAL
UNITARIO S/. Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial

03.10.07 PINTURA LATEX 2 MANOS EN COLUMNETAS EXTERIORES m2 81.45 21.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 81.45 1,765.02 1,765.020

03.10.08 PINTURA LATEX 2 MANOS EN VIGAS INTERIORES m2 606.34 17.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 606.34 10,617.01 10,617.010

03.10.09 PINTURA LATEX 2 MANOS EN VIGAS EXTERIORES m2 482.51 21.67 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 482.51 10,455.99 10,455.990

03.10.10 PINTURA LATEX 2 MANOS EN VIGUETAS INTERIORES m2 94.75 20.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 94.75 1,938.59 1,938.590

03.10.11 PINTURA LATEX 2 MANOS EN VIGUETAS EXTERIORES m2 36.72 22.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 36.72 827.67 827.670
03.10.12 PINTURA LATEX 2 MANOS EN DERRAMES m 583.13 6.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 583.13 3,912.80 3,912.800
03.10.13 PINTURA LATEX 2 MANOS EN CIELO RASO m2 1,087.26 18.29 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,087.26 19,885.99 19,885.990
03.10.14 PINTURA PARA DEMARCACIÓN EN LOSA DEPORTIVA m 443.10 6.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 443.10 2,667.46 2,667.460
03.10.15 PINTURA EN PEDESTALES PARA ASTAS m2 4.00 20.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 82.76 82.760
03.11 JUNTAS
JUNTA DE DILATACION CON ESPUMA PLASTICA+JEBE
03.11.01 m 593.30 16.75 0.00 0.00 0.00 0.00 0.00 0.00 591.55 9,908.53 1.75 29.25 0.00 0.00 9,937.780
MICROPOROSO
03.12 AREAS VERDES
03.12.01 TIERRA PREPARADA E=15 cm PATIO DE JUEGOS m2 3,798.92 12.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,798.92 46,384.81 46,384.810
03.12.02 GRASS NATURAL EN PATIO DE JUEGOS m2 3,798.92 8.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3,798.92 33,088.59 33,088.590
03.12.03 SIEMBRA DE ARBUSTOS NATURALES DE LA ZONA u 50.00 45.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 50.00 2,280.50 2,280.500
03.13 VARIOS
03.13.01 ARCO Y TABLERO FULBITO-BASKET(MET-MAD) und 2.00 1,806.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 3,612.04 3,612.040

03.13.02 PARANTES PARA NET DE VOLEYBALL (INCLUIDA LA NED) und 2.00 633.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,266.16 1,266.160
03.13.03 ASTA DE BANDERA TIPICO pza 2.00 713.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,427.96 1,427.960
SUMINISTRO E INSTALACION DE PLACA RECORDATORIA DE
03.13.04 glb 1.00 963.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 963.98 963.980
MARMOL (45x50 cm) EN MURO

03.13.05 TACHOS DE BASURA METÁLICOS EN EXTERIORES pza 2.00 365.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 730.06 730.060
03.13.06 BANCAS DE MADERA EN EXTERIORES und 4.00 226.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 906.48 906.480
03.13.07 NOMBRE EN ACERO INOXIDABLE EN PORTADA (LETRA) GLB 2.00 10,205.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 20,411.78 20,411.780
ESPEJO BISELADO EN SS.HH. e=6mm, C/LAMINA DE
03.13.08 m2 5.00 375.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 1,876.40 1,876.400
SEGURIDAD
03.13.09 COLOCACION DE MOBILIARIO Y EQUIPAMIENTO GLB 1.00 1,438.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,438.40 1,438.400
03.14 LIMPIEZA FINAL DE OBRA
03.14.01 LIMPIEZA FINAL DE OBRA glb 2.00 740.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,481.56 1,481.560
03.15 EVACUACIÓN Y SEÑALIZACIÓN
03.15.01 SEÑALIZACION Y SEGURIDAD
SEÑALIZACION DE VINIL AUTOADHESIVA
03.15.01.01 und 4.00 20.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 81.36 81.360
FOTOLUMINISCENTE DE EXTINTOR
SEÑALIZACION DE VINIL AUTOADHESIVA
03.15.01.02 und 9.00 20.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.00 183.06 183.060
FOTOLUMINISCENTE DE DIRECCION DE SALIDA

SEÑALIZACION DE VINIL AUTOADHESIVA


03.15.01.03 und 2.00 20.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 40.68 40.680
FOTOLUMINISCENTE DE ALARMA CONTRA INCENDIOS
SEÑALIZACION DE VINIL AUTOADHESIVA
03.15.01.04 und 1.00 20.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 20.34 20.340
FOTOLUMINISCENTE DE AVISADOR SONORO
SEÑALIZACION DE VINIL AUTOADHESIVA
03.15.01.05 und 14.00 20.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14.00 284.76 284.760
FOTOLUMINISCENTE DE PUERTA DE SALIDA
SEÑALIZACION DE VINIL AUTOADHESIVA
03.15.01.06 und 6.00 20.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 122.04 122.040
FOTOLUMINISCENTE DE SEÑAL DE PROHIBIDO EL INGRESO

SEÑALIZACION DE VINIL AUTOADHESIVA


03.15.01.07 und 12.00 20.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 244.08 244.080
FOTOLUMINISCENTE DE SEÑAL INFORMATIVA

SEÑALIZACION DE VINIL AUTOADHESIVA


03.15.01.08 und 2.00 20.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 40.68 40.680
FOTOLUMINISCENTE DE SEÑAL PROHIBIDO FUMAR

SEÑALIZACION DE VINIL AUTOADHESIVA


03.15.01.09 und 5.00 20.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 101.70 101.700
FOTOLUMINISCENTE DE BOTIQUIN DE PRIMEROS AUXILIOS

SEÑALIZACION DE VINIL AUTOADHESIVA


03.15.01.10 und 7.00 20.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.00 142.38 142.380
FOTOLUMINISCENTE DE DETECTOR DE HUMO
SEÑALIZACION DE VINIL AUTOADHESIVA
03.15.01.11 und 1.00 20.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 20.34 20.340
FOTOLUMINISCENTE DE RIESGO ELECTRICO
SEÑALIZACION DE VINIL AUTOADHESIVA
03.15.01.12 und 44.00 20.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 44.00 894.96 894.960
FOTOLUMINISCENTE DE LUZ DE EMERGENCIA

SEÑALIZACION DE VINIL AUTOADHESIVA


03.15.01.13 und 19.00 20.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19.00 386.46 386.460
FOTOLUMINISCENTE DE SEÑAL DE ZONA SEGURA

SEÑALIZACION DE VINIL AUTOADHESIVA


03.15.01.14 und 1.00 20.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 20.34 20.340
FOTOLUMINISCENTE DE SEÑAL DE PUESTA A TIERRA
SEÑALIZACION DE VINIL AUTOADHESIVA
03.15.01.15 und 6.00 20.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 122.04 122.040
FOTOLUMINISCENTE DE SEÑAL AFORO
03.15.02 PINTURA TRAFICO
03.15.02.01 MARCAS EN EL PAVIMENTO - SÍMBOLOS Y LETRAS und 7.00 56.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.00 398.37 398.370
04 INSTALACIONES SANITARIAS
04.01 APARATOS Y ACCESORIOS SANITARIOS

04.01.01 SUMINISTRO E INSTALACION DE APARATOS SANITARIOS

INODORO DE LOSA VITRIFICADA CON DESCARGA INDIRECTA


04.01.01.01 (TANQUE). MODELO: RAPIJET PRIMIUN, COLOR BLANCO 1ra und 2.00 234.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 469.42 469.420
CALIDAD - NIÑOS

INODORO DE LOSA VITRIFICADA CON DESCARGA INDIRECTA


04.01.01.02 (TANQUE). MODELO: RAPIJET PRIMIUN, COLOR BLANCO 1ra und 13.00 265.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.00 3,452.93 3,452.930
CALIDAD - ADULTOS
URINARIO DE PARED DE LOSA VITRIFICADA BLANCA
04.01.01.03 und 5.00 495.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 2,475.40 2,475.400
MODELO CADET O SIMILAR
LAVATORIO DE LOSA VITRIFICADA BLANCA TIPO OVALIN
04.01.01.04 und 10.00 464.92 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 4,649.20 4,649.200
C/GRIFERIA
04.01.01.05 LAVATORIO DE LOSA VITRIFICADA BLANCA C/GRIFERIA und 6.00 473.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 2,840.34 2,840.340
LAVADERO ACERO INOXIDABLE 01 POZA S/ESCURRIDERO
04.01.01.06 und 7.00 460.07 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 7.00 3,220.49 3,220.490
(INC. GRIFERIA)
LAVADERO ACERO INOXIDABLE 01 POZA C/ESCURRIDERO
04.01.01.07 und 3.00 502.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 1,507.20 1,507.200
(INC. GRIFERIA)
04.01.01.08 DUCHA ACERO INOXIDABLE (INC. ACCESORIOS) und 1.00 303.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 303.39 303.390

04.01.02 SUMINISTRO E INSTALACION DE ACCESORIOS


PORTARROLLO EMPOTRADO DE LOSA PARA PAPEL
04.01.02.01 und 15.00 94.96 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 1,424.40 1,424.400
HIGIÉNICO
CRONOGRAMA DE AVANCE VALORIZADO
OBRA MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E 80659 NUESTRA SEÑORA DE FATIMA DEL CASERIO DE TOGOPON DEL DISTRITO DE CARABAMBA PROVINCIA DE JULCAN DEPARTAMENTO DE LA LIBERTAD

Lugar LA LIBERTAD - JULCAN - CARABAMBA


1 1 2 2 3 3 4 4 5 5 6 6
MES 01 MES 02 MES 03 MES 04 MES 05 MES 06
PRECIO
Item Descripción UNIDAD METRADO TOTAL
UNITARIO S/. Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial
BARRA RECTA DE ACERO INOXIDABLE DE 1 1/2" PARA
04.01.02.02 und 3.00 140.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 421.08 421.080
PERSONAS CON DISCAPACIDAD
04.01.02.03 PORTAMULETAS DE ACERO INOXIDABLE und 3.00 111.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 335.73 335.730
04.01.02.04 LLAVE DE DUCHA CROMADA TIPO PALANCA und 1.00 182.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 182.72 182.720
04.01.02.05 BASURERO DE PLASTICO PARA BAÑO 35 LT. und 15.00 53.86 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 807.90 807.900
JABONERA DE ACERO INOX. CON DISPENSADOR PARA
04.01.02.06 und 15.00 108.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.00 1,623.00 1,623.000
JABÓN LÍQUIDO
04.01.02.07 JABONERA DE LOSA PARA DUCHA und 1.00 56.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 56.16 56.160
04.01.02.08 DISPENSADOR PARA PAPEL TOALLA und 14.00 72.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 14.00 1,008.42 1,008.420
04.01.02.09 GRIFO DE RIEGO und 5.00 51.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 258.50 258.500
04.02 SISTEMA DE AGUA FRIA
04.02.01 SALIDA DE AGUA FRIA
04.02.01.01 SALIDA DE AGUA FRIA - Ø = 1/2" PVC SAP pto 44.00 57.78 0.00 0.00 0.00 0.00 0.00 0.00 44.00 2,542.32 0.00 0.00 0.00 0.00 2,542.320
04.02.01.02 SALIDA DE AGUA FRIA - Ø = 3/4" PVC SAP pto 5.00 54.72 0.00 0.00 0.00 0.00 0.00 0.00 5.00 273.60 0.00 0.00 0.00 0.00 273.600
04.02.01.03 SALIDA DE AGUA FRIA - Ø = 2" PVC SAP pto 1.00 102.11 0.00 0.00 0.00 0.00 0.00 0.00 1.00 102.11 0.00 0.00 0.00 0.00 102.110
04.02.02 REDES DE DISTRIBUCION DE AGUA FRIA

04.02.02.01 RED DE DISTRIBUCION TUBERIA PVC CLASE 10 DE 1/2" m 105.18 12.45 0.00 0.00 0.00 0.00 105.18 1,309.49 0.00 0.00 0.00 0.00 0.00 0.00 1,309.490

04.02.02.02 RED DE DISTRIBUCION TUBERIA PVC CLASE 10 C/R DE 3/4" m 111.45 11.34 0.00 0.00 0.00 0.00 111.45 1,263.84 0.00 0.00 0.00 0.00 0.00 0.00 1,263.840

04.02.02.03 RED DE DISTRIBUCION TUBERIA PVC CLASE 10 C/R DE 1" m 10.66 16.63 0.00 0.00 0.00 0.00 10.66 177.28 0.00 0.00 0.00 0.00 0.00 0.00 177.280
04.02.03 REDES DE ALIMENTACION DE AGUA
04.02.03.01 RED DE ALIMENTACION TUBERIA PVC CLASE 10 C/R DE 1/2" m 12.95 10.52 0.00 0.00 0.00 0.00 12.95 136.23 0.00 0.00 0.00 0.00 0.00 0.00 136.230

04.02.03.02 RED DE ALIMENTACION TUBERIA PVC CLASE 10 C/R DE 3/4" m 36.40 9.54 0.00 0.00 0.00 0.00 36.40 347.26 0.00 0.00 0.00 0.00 0.00 0.00 347.260

04.02.03.03 RED DE ALIMENTACION TUBERIA PVC CLASE 10 C/R DE 1" m 48.62 13.87 0.00 0.00 0.00 0.00 48.62 674.36 0.00 0.00 0.00 0.00 0.00 0.00 674.360
RED DE ALIMENTACION TUBERIA PVC CLASE 10 C/R DE 1
04.02.03.04 m 16.47 20.12 0.00 0.00 0.00 0.00 15.72 316.36 0.75 15.02 0.00 0.00 0.00 0.00 331.380
1/4"
RED DE ALIMENTACION TUBERIA PVC CLASE 10 C/R DE 1
04.02.03.05 m 83.33 21.29 0.00 0.00 0.00 0.00 0.00 0.00 83.33 1,774.10 0.00 0.00 0.00 0.00 1,774.100
1/2"
RED DE ALIMENTACION TUBERIA PVC CLASE 10 C/R DE 2
04.02.03.06 m 32.43 34.82 0.00 0.00 0.00 0.00 0.00 0.00 32.43 1,129.21 0.00 0.00 0.00 0.00 1,129.210
1/2"
04.02.03.07 EXCAVACION Y PICADO DE ZANJA PARA TUBERIA m3 164.70 9.85 0.00 0.00 0.00 0.00 0.00 0.00 164.70 1,622.30 0.00 0.00 0.00 0.00 1,622.300

04.02.03.08 REFINE Y NIVELACION DE ZANJA PARA TUBERIA m2 205.87 1.85 0.00 0.00 0.00 0.00 0.00 0.00 205.87 380.86 0.00 0.00 0.00 0.00 380.860
04.02.03.09 CAMA DE ARENA EN ZANJA P/TUB. m3 20.59 140.19 0.00 0.00 0.00 0.00 0.00 0.00 20.59 2,886.51 0.00 0.00 0.00 0.00 2,886.510
RELLENO MANUAL CON MATERIAL PROPIO (REDES DE INST.
04.02.03.10 m3 82.35 33.44 0.00 0.00 0.00 0.00 0.00 0.00 27.34 914.16 55.01 1,839.62 0.00 0.00 2,753.780
SANITARIAS)
04.02.03.11 ELIMINACION DE MATERIAL EXCEDENTE MANUAL m3 102.94 15.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 102.94 1,561.60 0.00 0.00 1,561.600
04.02.03.12 PRUEBAS HIDRAULICAS Y DESINFECCION m 457.49 5.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 457.49 2,520.77 0.00 0.00 2,520.770
04.02.04 ACCESORIOS DE REDES DE AGUA
04.02.04.01 CODO PVC 90° SAP C-10 DE 1/2" und 134.00 8.71 0.00 0.00 0.00 0.00 134.00 1,167.14 0.00 0.00 0.00 0.00 0.00 0.00 1,167.140
04.02.04.02 CODO PVC 90° SAP C-10 DE 3/4" und 75.00 9.68 0.00 0.00 0.00 0.00 75.00 726.00 0.00 0.00 0.00 0.00 0.00 0.00 726.000
04.02.04.03 CODO PVC 90° SAP C-10 DE 1" und 2.00 11.07 0.00 0.00 0.00 0.00 2.00 22.14 0.00 0.00 0.00 0.00 0.00 0.00 22.140
04.02.04.04 CODO PVC 90 SAP C-10 DE 1 1/2" und 5.00 17.31 0.00 0.00 0.00 0.00 5.00 86.55 0.00 0.00 0.00 0.00 0.00 0.00 86.550
04.02.04.05 CODO PVC 90° SAP C-10 DE 2.1/2" und 2.00 31.33 0.00 0.00 0.00 0.00 2.00 62.66 0.00 0.00 0.00 0.00 0.00 0.00 62.660
04.02.04.06 TEE PVC SAP C-10 DE 1/2" und 2.00 16.42 0.00 0.00 0.00 0.00 2.00 32.84 0.00 0.00 0.00 0.00 0.00 0.00 32.840
04.02.04.07 TEE PVC SAP C-10 DE 3/4" und 26.00 11.37 0.00 0.00 0.00 0.00 26.00 295.62 0.00 0.00 0.00 0.00 0.00 0.00 295.620
04.02.04.08 TEE PVC SAP C-10 DE 1" und 10.00 14.34 0.00 0.00 0.00 0.00 10.00 143.40 0.00 0.00 0.00 0.00 0.00 0.00 143.400
04.02.04.09 TEE PVC SAP C-10 DE 11/4" und 2.00 23.58 0.00 0.00 0.00 0.00 2.00 47.16 0.00 0.00 0.00 0.00 0.00 0.00 47.160
04.02.04.10 TEE PVC SAP C-10 DE 11/2" und 4.00 29.60 0.00 0.00 0.00 0.00 4.00 118.40 0.00 0.00 0.00 0.00 0.00 0.00 118.400
04.02.04.11 TEE PVC SAP C-10 DE 21/2" und 1.00 33.84 0.00 0.00 0.00 0.00 1.00 33.84 0.00 0.00 0.00 0.00 0.00 0.00 33.840
04.02.04.12 REDUCCIÓN PVC SAP C-10 DE 3/4" A 1/2" und 38.00 9.30 0.00 0.00 0.00 0.00 38.00 353.40 0.00 0.00 0.00 0.00 0.00 0.00 353.400
04.02.04.13 REDUCCIÓN PVC SAP C-10 DE 1" A 1/2" und 2.00 17.86 0.00 0.00 0.00 0.00 2.00 35.72 0.00 0.00 0.00 0.00 0.00 0.00 35.720
04.02.04.14 REDUCCIÓN PVC SAP C-10 DE 1" A 3/4" und 7.00 11.20 0.00 0.00 0.00 0.00 7.00 78.40 0.00 0.00 0.00 0.00 0.00 0.00 78.400
04.02.04.15 REDUCCIÓN PVC SAP C-10 DE 11/4" A 3/4" und 3.00 11.60 0.00 0.00 0.00 0.00 3.00 34.80 0.00 0.00 0.00 0.00 0.00 0.00 34.800
04.02.04.16 REDUCCIÓN PVC SAP C-10 DE 11/4" A 1" und 1.00 12.00 0.00 0.00 0.00 0.00 1.00 12.00 0.00 0.00 0.00 0.00 0.00 0.00 12.000
04.02.04.17 REDUCCIÓN PVC SAP C-10 DE 1 1/2" A 1/2" und 1.00 18.28 0.00 0.00 0.00 0.00 1.00 18.28 0.00 0.00 0.00 0.00 0.00 0.00 18.280
04.02.04.18 REDUCCIÓN PVC SAP C-10 DE 1 1/2" A 3/4" und 4.00 19.13 0.00 0.00 0.00 0.00 4.00 76.52 0.00 0.00 0.00 0.00 0.00 0.00 76.520
04.02.04.19 REDUCCIÓN PVC SAP C-10 DE 21/2" A 3/4" und 1.00 25.91 0.00 0.00 0.00 0.00 1.00 25.91 0.00 0.00 0.00 0.00 0.00 0.00 25.910
04.02.04.20 REDUCCIÓN PVC SAP C-10 DE 21/2" A 1" und 1.00 22.52 0.00 0.00 0.00 0.00 1.00 22.52 0.00 0.00 0.00 0.00 0.00 0.00 22.520
04.02.04.21 REDUCCIÓN PVC SAP C-10 DE 21/2" A 1 1/2" und 1.00 23.37 0.00 0.00 0.00 0.00 1.00 23.37 0.00 0.00 0.00 0.00 0.00 0.00 23.370
04.02.05 VALVULAS Y LLAVES
04.02.05.01 VALVULA ESFERICA DE BRONCE PESADA Ø=1/2" und 6.00 102.46 0.00 0.00 0.00 0.00 6.00 614.76 0.00 0.00 0.00 0.00 0.00 0.00 614.760

04.02.05.02 VALVULA ESFERICA DE BRONCE PESADA Ø=3/4" und 15.00 127.78 0.00 0.00 0.00 0.00 15.00 1,916.70 0.00 0.00 0.00 0.00 0.00 0.00 1,916.700
04.02.05.03 VALVULA ESFERICA DE BRONCE PESADA Ø1" und 2.00 161.67 0.00 0.00 0.00 0.00 2.00 323.34 0.00 0.00 0.00 0.00 0.00 0.00 323.340
04.02.05.04 VALVULA DE COMPUERTA DE BRONCE PESADA Ø1.1/2" und 7.00 207.52 0.00 0.00 0.00 0.00 7.00 1,452.64 0.00 0.00 0.00 0.00 0.00 0.00 1,452.640

04.02.05.05 VALVULA DE COMPUERTA DE BRONCE PESADA Ø2" und 1.00 284.82 0.00 0.00 0.00 0.00 1.00 284.82 0.00 0.00 0.00 0.00 0.00 0.00 284.820
04.02.05.06 VALVULA CHECK DE BRONCE Ø1" und 1.00 112.87 0.00 0.00 0.00 0.00 1.00 112.87 0.00 0.00 0.00 0.00 0.00 0.00 112.870
04.02.05.07 VALVULA CHECK DE BRONCE Ø1 1 /4" und 2.00 116.60 0.00 0.00 0.00 0.00 2.00 233.20 0.00 0.00 0.00 0.00 0.00 0.00 233.200
04.02.06 VARIOS
CAJA NICHO PARA VALVULAS INC. TAPA A NIVEL DE
04.02.06.01 und 3.00 199.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 598.98 0.00 0.00 598.980
TERRENO NATURAL
04.02.06.02 CAJA PARA PARA VALVULAS EMPOTRADA EN PARED und 18.00 36.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 18.00 659.88 0.00 0.00 659.880
04.02.06.03 CAJA NICHO PARA GRIFO DE RIEGO und 5.00 115.16 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 575.80 0.00 0.00 575.800
04.03 SISTEMA DE EVACUACION PLUVIAL
04.03.01 REDES COLECTORAS EXTERIORES
EXCAVACION Y PICADO DE ZANJA PARA CANALETA DE
04.03.01.01 m3 31.67 42.33 0.00 0.00 0.00 0.00 8.57 362.91 23.10 977.68 0.00 0.00 0.00 0.00 1,340.590
CONCRETO
REFINE Y NIVELACION DE ZANJA PARA CANALETA DE
04.03.01.02 m2 64.38 1.24 0.00 0.00 0.00 0.00 0.00 0.00 64.38 79.83 0.00 0.00 0.00 0.00 79.830
CONCRETO
04.03.01.03 ELIMINACION DE MATERIAL EXCEDENTE MANUAL m3 31.67 15.17 0.00 0.00 0.00 0.00 0.00 0.00 31.67 480.43 0.00 0.00 0.00 0.00 480.430

04.03.01.04 CANAL PLUVIAL ENCOFRADO Y DESENCOFRADO m2 193.14 58.33 0.00 0.00 0.00 0.00 0.00 0.00 193.14 11,265.86 0.00 0.00 0.00 0.00 11,265.860
04.03.01.05 CANAL PLUVIAL CONCRETO F'C=175KG/CM2 m3 25.75 492.37 0.00 0.00 0.00 0.00 0.00 0.00 25.75 12,678.53 0.00 0.00 0.00 0.00 12,678.530
04.03.01.06 REJILLA METALICA EN CANAL PLUVIAL S/DISEÑO m 193.14 125.57 0.00 0.00 0.00 0.00 0.00 0.00 193.14 24,252.59 0.00 0.00 0.00 0.00 24,252.590

04.03.01.07 JUNTA DE CONSTRUCCION EN CANAL PLUVIAL m 46.50 8.00 0.00 0.00 0.00 0.00 0.00 0.00 46.50 372.00 0.00 0.00 0.00 0.00 372.000
04.03.02 REDES COLECTORAS EN TECHOS
CANALETA DE PLANCHA GALVANIZADA D=6" e=1/32",
04.03.02.01 m 296.30 36.01 0.00 0.00 0.00 0.00 0.00 0.00 242.45 8,633.67 53.85 1,917.57 0.00 0.00 10,551.240
INCLUYE SOPORTES
MONTANTE TUBERIA DE PVC SAL DE 4" INCLUYE
04.03.02.02 m 106.64 19.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 106.64 2,109.34 0.00 0.00 2,109.340
ACCESORIOS
04.03.02.03 TUBERIA PVC SAP DE 4" EN EXTERIORES m 17.98 22.48 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.98 404.19 0.00 0.00 404.190
ABRAZADERA PARA TUBO 4" PARA MONTANTE DE RED
04.03.02.04 und 123.00 11.34 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 123.00 1,394.82 0.00 0.00 1,394.820
PLUVIAL
04.03.02.05 CODO PVC 90 SAP C-10 DE 4" und 43.00 12.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 43.00 545.67 0.00 0.00 545.670
04.03.02.06 CONCRETO F'C=175KG/CM2 EN COLUMNETA m3 1.69 417.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.69 705.05 0.00 0.00 705.050
04.03.02.07 ENCOFRADO Y DESENCOFRADO EN COLUMNETA m2 24.75 86.39 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24.75 2,138.15 0.00 0.00 2,138.150
04.04 SISTEMA DE DESAGUE
04.04.01 SALIDAS DE DESAGUE Y VENTILACION
04.04.01.01 SALIDA DE DESAGUE EN PVC SAP Ø DE 2" pto 31.00 54.30 0.00 0.00 0.00 0.00 0.00 0.00 31.00 1,683.30 0.00 0.00 0.00 0.00 1,683.300
04.04.01.02 SALIDA DE DESAGUE EN PVC CP Ø DE 2" CON TRAMPA "P" pto 10.00 73.46 0.00 0.00 0.00 0.00 0.00 0.00 10.00 734.60 0.00 0.00 0.00 0.00 734.600
04.04.01.03 SALIDA DE DESAGUE EN PVC SAP Ø DE 4" pto 14.00 61.18 0.00 0.00 0.00 0.00 0.00 0.00 14.00 856.52 0.00 0.00 0.00 0.00 856.520
CRONOGRAMA DE AVANCE VALORIZADO
OBRA MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E 80659 NUESTRA SEÑORA DE FATIMA DEL CASERIO DE TOGOPON DEL DISTRITO DE CARABAMBA PROVINCIA DE JULCAN DEPARTAMENTO DE LA LIBERTAD

Lugar LA LIBERTAD - JULCAN - CARABAMBA


1 1 2 2 3 3 4 4 5 5 6 6
MES 01 MES 02 MES 03 MES 04 MES 05 MES 06
PRECIO
Item Descripción UNIDAD METRADO TOTAL
UNITARIO S/. Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial
04.04.01.04 SALIDA DE VENTILACION EN PVC SAP Ø DE 2" pto 44.00 53.00 0.00 0.00 0.00 0.00 0.00 0.00 38.60 2,045.63 5.40 286.37 0.00 0.00 2,332.000
04.04.02 REDES DE DISTRIBUCION
04.04.02.01 RED DE DISTRIBUCION DE TUBERIA PVC - SAP Ø DE 2" m 115.00 18.01 0.00 0.00 0.00 0.00 0.00 0.00 115.00 2,071.15 0.00 0.00 0.00 0.00 2,071.150

04.04.02.02 RED DE DISTRIBUCION DE TUBERIA PVC - SAP Ø DE 4" m 53.05 22.48 0.00 0.00 0.00 0.00 0.00 0.00 53.05 1,192.56 0.00 0.00 0.00 0.00 1,192.560

04.04.02.03 RED DE VENTILACION DE TUBERIA PVC - SAP Ø DE 2" m 40.16 19.79 0.00 0.00 0.00 0.00 0.00 0.00 40.16 794.77 0.00 0.00 0.00 0.00 794.770
04.04.03 ACCESORIOS DE REDES DE DESAGUE
04.04.03.01 ACCESORIOS DE REDES DE DESAGUE
04.04.03.01.01 TEE PVC-P Ø2"x2" PARA DESAGUE und 14.00 10.14 0.00 0.00 0.00 0.00 0.00 0.00 14.00 141.96 0.00 0.00 0.00 0.00 141.960
04.04.03.01.02 YEE PVC-P Ø2"x2" PARA DESAGUE und 24.00 12.26 0.00 0.00 0.00 0.00 0.00 0.00 24.00 294.24 0.00 0.00 0.00 0.00 294.240
04.04.03.01.03 YEE PVC-P Ø4"x2" PARA DESAGUE und 16.00 13.11 0.00 0.00 0.00 0.00 0.00 0.00 16.00 209.76 0.00 0.00 0.00 0.00 209.760
04.04.03.01.04 YEE PVC-P Ø4"x4" PARA DESAGUE und 9.00 14.21 0.00 0.00 0.00 0.00 0.00 0.00 9.00 127.89 0.00 0.00 0.00 0.00 127.890
04.04.03.01.05 CODO PVC-P Ø=2"x45° und 34.00 7.60 0.00 0.00 0.00 0.00 0.00 0.00 34.00 258.40 0.00 0.00 0.00 0.00 258.400
04.04.03.01.06 CODO PVC-P Ø=2"x90° und 67.00 7.09 0.00 0.00 0.00 0.00 0.00 0.00 67.00 475.03 0.00 0.00 0.00 0.00 475.030
04.04.03.01.07 CODO PVC-P Ø=4"x45° und 3.00 12.69 0.00 0.00 0.00 0.00 0.00 0.00 3.00 38.07 0.00 0.00 0.00 0.00 38.070
04.04.03.01.08 CODO PVC-P Ø=4"x90° und 3.00 12.69 0.00 0.00 0.00 0.00 0.00 0.00 3.00 38.07 0.00 0.00 0.00 0.00 38.070
04.04.03.01.09 CODO PVC-P Ø=4"x90° CON REDUCCION DE Ø2" und 9.00 12.69 0.00 0.00 0.00 0.00 0.00 0.00 9.00 114.21 0.00 0.00 0.00 0.00 114.210
04.04.03.01.10 REDUCCIÓN PVC - SAP DE 4" A 2" und 1.00 13.53 0.00 0.00 0.00 0.00 0.00 0.00 1.00 13.53 0.00 0.00 0.00 0.00 13.530
04.04.04 REDES COLECTORAS DE DESAGUE
04.04.04.01 RED COLECTORA CON TUBERIA DE PVC SAP Ø DE 4" m 15.85 21.83 0.00 0.00 0.00 0.00 0.00 0.00 15.85 346.01 0.00 0.00 0.00 0.00 346.010

04.04.04.02 RED COLECTORA CON TUBERIA DE PVC SAP Ø DE 6" m 344.97 33.42 0.00 0.00 0.00 0.00 0.00 0.00 344.97 11,528.90 0.00 0.00 0.00 0.00 11,528.900

04.04.04.03 RED COLECTORA CON TUBERIA DE PVC SAP Ø DE 8" m 60.05 52.71 0.00 0.00 0.00 0.00 0.00 0.00 60.05 3,165.24 0.00 0.00 0.00 0.00 3,165.240

04.04.04.04 EXCAVACION Y PICADO DE ZANJA PARA TUBERIA m3 157.23 9.85 0.00 0.00 0.00 0.00 0.00 0.00 157.23 1,548.72 0.00 0.00 0.00 0.00 1,548.720

04.04.04.05 REFINE Y NIVELACIÓN DE ZANJA PARA TUBERIA m2 195.61 1.85 0.00 0.00 0.00 0.00 0.00 0.00 195.61 361.88 0.00 0.00 0.00 0.00 361.880
04.04.04.06 CAMA DE ARENA EN ZANJA P/TUB. m3 19.74 140.19 0.00 0.00 0.00 0.00 0.00 0.00 19.74 2,767.35 0.00 0.00 0.00 0.00 2,767.350
RELLENO Y COMPACTADO CON CON EQUIPO Y MAT.
04.04.04.07 m3 77.09 33.44 0.00 0.00 0.00 0.00 0.00 0.00 7.37 246.35 69.72 2,331.54 0.00 0.00 2,577.890
PROPIO
04.04.04.08 ELIMINACION DE MATERIAL EXCEDENTE MANUAL m3 115.57 15.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 115.57 1,753.20 0.00 0.00 1,753.200
04.04.05 ADITAMENTOS VARIOS
04.04.05.01 SUMIDERO DE BRONCE DE 2" PROVISION Y COLOCACION und 20.00 19.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20.00 392.80 0.00 0.00 392.800
REGISTRO ROSCADO DE BRONCE DE 2" PROVISION Y
04.04.05.02 u 6.00 18.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 108.18 0.00 0.00 108.180
COLOCACION
REGISTRO ROSCADO DE BRONCE DE 4" PROVISION Y
04.04.05.03 und 40.00 35.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 40.00 1,436.00 0.00 0.00 1,436.000
COLOCACION
04.04.05.04 SOMBRERO DE VENTILACION DE 2" PVC und 13.00 17.27 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.00 224.51 0.00 0.00 224.510
04.04.06 CAMARAS
04.04.06.01 CAJAS DE REGISTRO
CAJA DE REG. PREFAB. 12" x 24" (0.30x0.60) C/TAPA
04.04.06.01.01 und 12.00 138.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 1,664.28 0.00 0.00 1,664.280
CONCRETO REFORZADO
CAJA DE REG. PREFAB. 18" x 24" (0.45x0.60) C/TAPA
04.04.06.01.02 und 4.00 162.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 650.44 0.00 0.00 650.440
CONCRETO REFORZADO
CAJA DE REG. PREFAB. 24" x 24" (0.60x0.60) C/TAPA
04.04.06.01.03 und 11.00 167.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.00 1,845.25 0.00 0.00 1,845.250
CONCRETO REFORZADO
04.04.06.01.04 CAMARAS
04.04.06.01.05 TRAMPA DE GRASA und 3.00 1,039.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 3,117.09 0.00 0.00 3,117.090
04.04.07 PRUEBAS HIDRAULICAS
04.04.07.01 PRUEBA HIDRAULICA DE ESCORRENTIA DE TUB. DESAGUE m 370.03 2.36 0.00 0.00 0.00 0.00 0.00 0.00 370.03 873.27 0.00 0.00 0.00 0.00 873.270

04.04.08 COLUMNETA DE FIBROCEMENTO DE 0.15 m x 0.15 m

04.04.08.01 COLUMNETA DE FIBROCEMENTO DE 0.15 m x 0.15 m m 9.60 112.19 0.00 0.00 0.00 0.00 0.00 0.00 9.60 1,077.02 0.00 0.00 0.00 0.00 1,077.020
SISTEMA DE ALMACENAMIENTO DE CISTERNA Y TANQUE
04.05
ELEVADO
04.05.01 REDES DE ALIMENTACION DE AGUA
SUMINISTRO E INSTALACION LINEA DE INGRESO Ø = 2"
04.05.01.01 GLB 1.00 651.68 0.00 0.00 0.00 0.00 0.00 0.00 1.00 651.68 0.00 0.00 0.00 0.00 651.680
INCLUYE VALVULAS Y ACCESORIOS

SUMINISTRO E INSTALACION LINEA DE ALIMENTACION Ø =


04.05.01.02 GLB 1.00 1,522.15 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,522.15 0.00 0.00 0.00 0.00 1,522.150
2" INCLUYE VALVULAS Y ACCESORIOS

SUMINISTRO E INSTALACION LINEA DE IMPULSION Ø = 1


04.05.01.03 GLB 1.00 2,264.69 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2,264.69 0.00 0.00 0.00 0.00 2,264.690
1/2" INCLUYE VALVULAS Y ACCESORIOS

SUMINISTRO E INSTALACION LINEA DE SUCCION Ø = 2"


04.05.01.04 GLB 1.00 670.89 0.00 0.00 0.00 0.00 0.00 0.00 1.00 670.89 0.00 0.00 0.00 0.00 670.890
INCLUYE VALVULAS Y ACCESORIOS

SUMINISTRO E INSTALACION LINEA DE REBOSE Y LIMPIA Ø


04.05.01.05 GLB 1.00 1,340.16 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,340.16 0.00 0.00 0.00 0.00 1,340.160
= 2", PARA TANQUE ELEVADO
SUMINISTRO E INSTALACION LINEA DE REBOSE Ø = 2",
04.05.01.06 GLB 1.00 626.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 626.00 0.00 0.00 0.00 0.00 626.000
PARA CISTERNA
PRUEBA HIDRAULICA DE ESTANQUIEDAD Y DESINFECCIÓN
04.05.01.07 GLB 1.00 519.59 0.00 0.00 0.00 0.00 0.00 0.00 1.00 519.59 0.00 0.00 0.00 0.00 519.590
EN SISTEMA DE BOMBEO DE CISTERNA

04.05.01.08 SUMINISTRO E INSTALACIÓN DE ELECTROBOMBA

SUMINISTRO E INSTALACION DE EQUIPO DE BOMBEO; 02


04.05.01.08.01 ELECTROBOMBAS CENTRIFUGAS (Q=2.11 LPS, GLB 2.00 1,136.59 0.00 0.00 0.00 0.00 0.00 0.00 2.00 2,273.18 0.00 0.00 0.00 0.00 2,273.180
HDT=22.00, Pot. Estimada= 1.5HP)
04.05.02 TRATAMIENTO DE AGUAS SERVIDAS
04.05.02.01 TANQUE SEPTICO
SUMINISTRO E INSTALACION DE TANQUE SEPTICO, INCLUYE
04.05.02.01.01 GLB 1.00 752.06 0.00 0.00 0.00 0.00 0.00 0.00 1.00 752.06 0.00 0.00 0.00 0.00 752.060
ACCESORIOS
04.05.02.02 CAMARA DE DISTRIBUCCION
04.05.02.02.01 VERTEDERO METALICO TRIANGULAR TRIANGULAR(E=3/4") und 2.00 529.55 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,059.10 0.00 0.00 0.00 0.00 1,059.100
04.05.02.03 POZO DE PERCOLACION
TAPA DE CONCRETO DE 0.60 X 0.60 e=0.05m P/POZO DE
04.05.02.03.01 und 2.00 65.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 130.00 0.00 0.00 0.00 0.00 130.000
PERCOLACION
05 INSTALACIONES ELECTRICAS Y MECANICAS

05.01 CONEXIÓN A LA RED EXTERNA DE MEDIDORES


05.01.01 EQUIPAMIENTO DE SUMINISTRO ELÉCTRICO und 1.00 34.66 1.00 34.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 34.660
SALIDAS PARA ALUMBRADO, TOMACORRIENTES, FUERZA Y
05.02
SEÑALES DEBILES
05.02.01 SALIDA
05.02.01.01 SALIDA PARA ALUMBRADO
SALIDA DE TECHO (CENTRO DE LUZ) - LUMINARIA LED
05.02.01.01.01 pto 86.00 41.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 86.00 3,526.86 3,526.860
HERMETICA 55W
SALIDA DE TECHO (CENTRO DE LUZ) - LUMINARIA LED
05.02.01.01.02 HERMETICA 57W - DE 6000lm /CRI>=80/FP>=0.90/VIDA pto 12.00 41.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 492.12 492.120
UTIL>=50000 HORAS/ >=6500K
CRONOGRAMA DE AVANCE VALORIZADO
OBRA MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E 80659 NUESTRA SEÑORA DE FATIMA DEL CASERIO DE TOGOPON DEL DISTRITO DE CARABAMBA PROVINCIA DE JULCAN DEPARTAMENTO DE LA LIBERTAD

Lugar LA LIBERTAD - JULCAN - CARABAMBA


1 1 2 2 3 3 4 4 5 5 6 6
MES 01 MES 02 MES 03 MES 04 MES 05 MES 06
PRECIO
Item Descripción UNIDAD METRADO TOTAL
UNITARIO S/. Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial

SALIDA EN TECHO (CENTRO DE LUZ) - LUMINARIA LED


05.02.01.01.03 CUADRADA 24W, DE 1800lm /CRI>=80/FP>=0.90/VIDA pto 6.00 41.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 246.06 246.060
UTIL>= 30000 HORAS/ >=4000K

SALIDA EN TECHO (CENTRO DE LUZ) - LUMINARIA LED


05.02.01.01.04 CIRCULAR 24W, DE 1800lm /CRI>=80/FP>=0.90/VIDA pto 39.00 41.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 39.00 1,599.39 1,599.390
UTIL>= 30000 HORAS/ >=4000K

SALIDA EN TECHO (CENTRO DE LUZ) - LUMINARIA LED


05.02.01.01.05 CIRCULAR 18W, DE 1500lm /CRI>=80/FP>= 0.90/VIDA pto 38.00 41.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 38.00 1,558.38 1,558.380
UTIL >=30000 HORAS/ >=4000K

SALIDA DE PARED (APLIQUE LED EXTERIOR) - LED 24W -


05.02.01.01.06 30W, IP65 DE 2600lm /CRI>=80/FP>=0.90/VIDA UTIL>= pto 2.00 40.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 81.22 81.220
25000 HORAS/ >=300
SALIDA PARA LUZ DE EMERGENCIA EN PARED CON DOS
05.02.01.01.07 LAMPARAS DE 2X16W LED, CON DOS HORAS DE pto 57.00 40.61 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 57.00 2,314.77 2,314.770
AUTONOMIA
SALIDA PARA LUMINARIA SMARTLED HIGH BAY 240W, DE
05.02.01.01.08 24000lm /CRI >=85/FP>=0.90/VIDA UTIL>= 50000 pto 16.00 67.71 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.00 1,083.36 1,083.360
HORAS/ >4000K, IP65
SALIDA PARA LUMINARIA VALENTINO LED 71W, DE 7700lm
05.02.01.01.09 /CRI>=85/FP>= 0.90/VIDA UTIL>=80000 pto 16.00 41.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.00 656.16 656.160
HORAS/>=4000K, IP66
05.02.01.02 SALIDA PARA TOMACORRIENTES
SALIDA PARA TOMACORRIENTE 3 LINEA + SCHUKO DOBLE -
05.02.01.02.01 pto 65.00 122.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 65.00 7,954.70 7,954.700
250V/16A (IGUAL O SIMILAR A DOMINO SENCIA DE BTICINO)

SALIDA PARA TOMACORRIENTE 3 LINEA + SCHUKO DOBLE


05.02.01.02.02 A PRUEBA DE AGUA - 250V/16A (IGUAL O SIMILAR A pto 5.00 134.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 671.80 671.800
HIDROBOX DE BTICINO)
05.02.01.03 SALIDA PARA INTERRUPTORES
SALIDA PARA INTERRUPTOR DE SIMPLE - 250V/10A (CON
05.02.01.03.01 pto 42.00 71.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 42.00 3,010.56 3,010.560
INT. SIMILAR O IGUAL A DOMINO SENCIA DE BTICINO)

SALIDA PARA INTERRUPTOR DE DOBLE - 250V/10A (CON


05.02.01.03.02 pto 6.00 83.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 502.68 502.680
INT. SIMILAR O IGUAL A DOMINO SENCIA DE BTICINO)

SALIDA PARA INTERRUPTOR DE TRIPLE - 250V/10A (CON


05.02.01.03.03 pto 1.00 84.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 84.78 84.780
INT. SIMILAR O IGUAL A DOMINO SENCIA DE BTICINO)

SALIDA PARA INTERRUPTOR DE CONMUTACION SIMPLE -


05.02.01.03.04 250V/10A (CON INT. SIMILAR O IGUAL A DOMINO SENCIA DE pto 16.00 99.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.00 1,590.08 1,590.080
BTICINO)
05.02.01.04 SALIDA OTROS
05.02.01.04.01 SALIDA PARA PULSADOR DE TIMBRE pto 4.00 98.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 392.72 392.720
05.02.01.04.02 TIMBRE TIPO CAMPANA INDUSTRIAL DE 8" pto 2.00 139.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 278.24 278.240
05.02.01.04.03 TIMBRE MUSICAL pto 2.00 164.62 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 329.24 329.240
05.02.01.04.04 SALIDA PARA CONTROL DE PERSONAL, INCLUYE EQUIPO pto 2.00 875.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 1,750.84 1,750.840

05.02.02 CANALIZACIONES, CONDUCTOS O TUBERIAS


05.02.02.01 MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS PARA REDES ELECTRICAS Y
05.02.02.01.01 m3 75.36 9.85 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 75.36 742.30 0.00 0.00 742.300
COMUNICACION
05.02.02.01.02 PROTECCION DE CABLE ELECTRICO Y COMUNICACION m 314.00 4.09 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 314.00 1,284.26 0.00 0.00 1,284.260

RELLENO MANUAL CON MATERIAL PROPIO (REDES DE INST.


05.02.02.01.03 m3 70.56 33.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 70.56 2,359.53 0.00 0.00 2,359.530
ELECTRICAS Y COMUNICACION)

ELIMINACIÓN DE MATERIAL EXCEDENTE DE INSTALACIONES


05.02.02.01.04 m3 4.80 15.17 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.80 72.82 0.00 0.00 72.820
ELÉCTRICAS Y COMUNICACIONES
05.02.02.02 TUBERIAS EMPOTRADAS
05.02.02.02.01 TUBERIA PVC - P 20mm Ø X 3M m 1,096.20 7.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,096.20 8,506.51 0.00 0.00 8,506.510
05.02.02.02.02 TUBERIA PVC - P 25mm Ø X 3M m 481.95 11.73 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 481.95 5,653.27 0.00 0.00 5,653.270
05.02.02.02.03 TUBERIA PVC - P 35mm Ø X 3M m 42.00 17.32 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 42.00 727.44 0.00 0.00 727.440
05.02.02.02.04 TUBERIA PVC - P 40mm Ø X 3M m 140.70 17.35 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 140.70 2,441.15 0.00 0.00 2,441.150
05.02.02.02.05 TUBERIA PVC - P 50mm Ø X 3M m 19.95 29.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 19.95 586.93 0.00 0.00 586.930
05.02.02.03 TUBERÍA VISIBLE
05.02.02.03.01 TUBERIA PVC - FLEXIBLE CONDUIT 3/4" m 2.10 25.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.10 52.77 0.00 0.00 52.770
05.02.02.03.02 TUBERIA CONDUIT 1" EMT m 130.00 20.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 130.00 2,614.30 0.00 0.00 2,614.300
05.02.02.03.03 ACCESORIOS PARA TUBERIA CONDUIT m 36.00 44.06 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 36.00 1,586.16 0.00 0.00 1,586.160
05.02.03 CONDUCTORES Y CABLES DE ENERGIA EN TUBERIA
05.02.03.01 ALIMENTADORES
SUMINISTRO E INST. DE ALIMENTADOR CAB NH-80 Ø 2.5
05.02.03.01.01 m 2,655.40 3.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,655.40 9,798.43 9,798.430
mm2
05.02.03.01.02 SUMINISTRO E INST. DE ALIMENTADOR CAB NH-80 Ø 4mm2 m 927.30 4.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 927.30 4,404.68 4,404.680

05.02.03.01.03 SUMINISTRO E INST. DE ALIMENTADOR CAB NH-80 Ø 6mm2 m 445.50 7.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 445.50 3,167.51 3,167.510

05.02.03.01.04 SUMINISTRO E INST. DE ALIMENTADOR CAB N2XOH Ø 6mm2 m 917.40 7.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 917.40 6,495.19 6,495.190
SUMINISTRO E INST. DE ALIMENTADOR CAB N2XOH Ø
05.02.03.01.05 m 416.85 10.81 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 416.85 4,506.15 4,506.150
10mm2
SUMINISTRO E INST. DE ALIMENTADOR CAB N2XOH Ø
05.02.03.01.06 m 281.40 14.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 281.40 4,164.72 4,164.720
16mm2
SUMINISTRO E INST. DE ALIMENTADOR CAB N2XOH Ø
05.02.03.01.07 m 41.80 28.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41.80 1,194.23 1,194.230
35mm2
05.02.04 SISTEMA DE CONDUCTOS
05.02.04.01 BUZON DE INSTALACIONES ELECTRICAS (0.8x0.8x0.9m) und 1.00 329.69 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 329.69 0.00 0.00 329.690

05.02.04.02 BUZON DE INSTALACIONES ELÉCTRICAS (0.65x0.65x0.85cm) und 6.00 294.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 1,764.78 0.00 0.00 1,764.780
BUZON DE INSTALACIONES DE COMUNICACIÓNES
05.02.04.03 und 8.00 294.13 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 2,353.04 0.00 0.00 2,353.040
(0.65x0.65x0.85cm)
05.02.05 TABLEROS PRINCIPALES
TG C/BARRAS 2x120A: 4 Int. Ter. 2x32A, 5 Int. Ter. 2x25A, 1
05.02.05.01 und 1.00 1,591.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,591.03 0.00 0.00 1,591.030
Int. Ter. 2x20A, 1 Int. Ter. 2x16A, 3 Int. Dif. 2x25A, 28

05.02.06 TABLERO DE DISTRIBUCION ALIMENTADORES

TD-01 C/BARRAS 2x25A: 3 int. 2x16A, 2 Int. Ter. 2x20A, 2 Int.


05.02.06.01 und 1.00 1,057.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,057.94 1,057.940
Dif. 2x25A(30mA), 01 Int. Horario, 16 Polos Empotradodo

TD-02 C/BARRAS 2x25A: 4 int. 2x16A, 2 Int. Ter. 2x20A, 2 Int.


05.02.06.02 und 1.00 1,091.94 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,091.94 1,091.940
Ter. 2x25A, 2 Int. Dif. 2x25A(30mA), 18 Polos Empotrado

TD-03 C/BARRAS 2x32A: 3 int. 2x16A, 4 Int. Ter. 2x20A, 4 Int.


05.02.06.03 und 1.00 1,438.74 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,438.74 1,438.740
Dif. 2x25A(30mA), 20 Polos Empotrado

TD-04 C/BARRAS 2x25A: 1 int. 2x16A, 1 Int. Ter. 2x20A, 1 Int.


05.02.06.04 und 1.00 507.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 507.24 507.240
Dif. 2x25A(30mA), 10 Polos Empotrado
CRONOGRAMA DE AVANCE VALORIZADO
OBRA MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E 80659 NUESTRA SEÑORA DE FATIMA DEL CASERIO DE TOGOPON DEL DISTRITO DE CARABAMBA PROVINCIA DE JULCAN DEPARTAMENTO DE LA LIBERTAD

Lugar LA LIBERTAD - JULCAN - CARABAMBA


1 1 2 2 3 3 4 4 5 5 6 6
MES 01 MES 02 MES 03 MES 04 MES 05 MES 06
PRECIO
Item Descripción UNIDAD METRADO TOTAL
UNITARIO S/. Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial

TD-05 C/BARRAS 2x32A: 3 int. 2x16A, 3 Int. Ter. 2x20A, 3 Int.


05.02.06.05 und 1.00 1,202.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,202.14 1,202.140
Dif. 2x25A(30mA), 18 Polos Empotrado

TD-06 C/BARRAS 2x25A: 2 int. 2x16A, 1 Int. Ter. 2x20A, 1 Int.


05.02.06.06 und 1.00 562.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 562.04 562.040
Dif. 2x25A(30mA), 12 Polos Empotrado

TD-07 C/BARRAS 2x32A: 5 int. 2x16A, 4 Int. Ter. 2x20A, 3 Int.


05.02.06.07 und 1.00 1,364.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,364.54 1,364.540
Dif. 2x25A(30mA), 24 Polos Empotrado

TD-08 C/BARRAS 2x25A: 1 int. 2x16A, 1 Int. Ter. 2x20A, 1 Int.


05.02.06.08 und 1.00 562.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 562.04 562.040
Ter. 2x25A, 1 Int. Dif. 2x25A(30mA), 12 Polos Empotrado
TD-09 C/BARRAS 2x32A: 2 Int. Ter. 2x20A, 10 Polos
05.02.06.09 und 1.00 319.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 319.24 319.240
Empotrado
05.02.06.10 TABLERO DE CONTROL AUTOMATICO DE ELECTROBOMBAS und 1.00 734.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 734.78 734.780
05.02.06.11 TABLERO DE TRANSFERENCIA 20KVA und 1.00 1,373.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,373.88 1,373.880
05.02.07 DISPOSITIVOS DE MANIOBRA Y PROTECCIÓN
CAJA DE PASE OCTOGONAL PVC C/TAPA CIEGA 100 X 55
05.02.07.01 und 11.00 12.97 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.00 142.67 142.670
mm
CAJA DE PASE RECTANGULAR PVC C/TAPA CIEGA 100 X 50
05.02.07.02 und 1.00 13.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 13.82 13.820
X 50 mm
05.02.07.03 CAJA DE PASE F°G° 100X100X50 MM - (4" X 4" X 2") und 16.00 26.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.00 423.52 423.520

05.02.07.04 CAJA DE PASE F°G° 150X150X100 MM - (6" X 6" X 4") und 4.00 31.84 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 127.36 127.360
05.03 INSTALACION DE PARARRAYO
PARARRAYOS OINIFLASH MACH MODELO NG60 NIVEL 1
05.03.01 und 1.00 5,796.89 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 5,796.89 5,796.890
RP<85 O SIMILAR
05.04 INSTALACION DE SISTEMA DE PUESTA A TIERRA

SUMINISTRO E INSTALACION DE POZO PUESTA A TIERRA


05.04.01 und 8.00 1,559.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 12,475.52 12,475.520
R< 15 OHMIOS (VARILLA DE 5/8)

SUMINISTRO E INSTALACION DE POZO PUESTA A TIERRAR<


05.04.02 und 3.00 2,751.15 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.00 8,253.45 8,253.450
15 OHMIOS (VARILLA DE 3/4 - PARARRAYO)
05.05 ARTEFACTOS
05.05.01 LUMINARIAS
LUMINARIA PANEL LE 40W 1.20X0.30X0.05 M. DE 4000lm
05.05.01.01 und 86.00 179.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 86.00 15,443.88 15,443.880
/CRI ? 80/FP? 0.90/VIDA UTIL ? 30000 HORAS/ ?5000K

LUMINARIA LED HERMETICA 57W - DE 6000lm /CRI >=


05.05.01.02 und 12.00 139.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.00 1,674.96 1,674.960
80/FP>= 0.90/VIDA UTIL >= 50000 HORAS/ >=6500K

LUMINARIA LED CUADRADA 24W, DE 1800lm /CRI >=


05.05.01.03 und 6.00 114.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 687.48 687.480
80/FP>= 0.90/VIDA UTIL >= 30000 HORAS/ >=4000K

LUMINARIA LED CIRCULAR 24W, DE 1500lm /CRI >=


05.05.01.04 und 39.00 99.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 39.00 3,883.62 3,883.620
80/FP>= 0.90/VIDA UTIL >= 30000 HORAS/ >=4000K

LUMINARIA LED CIRCULAR 18W, DE 1500lm /CRI >=


05.05.01.05 und 38.00 75.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 38.00 2,872.04 2,872.040
80/FP>= 0.90/VIDA UTIL >= 30000 HORAS/ >=4000K
LUMINARIA APLIQUE RECTANGULAR LED 24W - 30W, IP65
05.05.01.06 DE 2600lm /CRI >= 80/FP>= 0.90/VIDA UTIL >= 25000 und 2.00 115.58 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 231.16 231.160
HORAS/ >=3000K
LUMINARIA DE EMERGENCIA EN PARED CON DOS
05.05.01.07 LAMPARAS DE 2X16W LED, CON DOS HORAS DE und 57.00 184.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 57.00 10,524.48 10,524.480
AUTONOMIA
LUMINARIA SMARTLED HIGH BAY 240W, DE 24000lm /CRI
05.05.01.08 >= 85/FP>= 0.90/VIDA UTIL >= 50000 HORAS/ >4000K, und 16.00 504.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.00 8,074.88 8,074.880
IP65
LUMINARIA VALENTINO LED 71W, DE 7700lm /CRI >=
05.05.01.09 85/FP>= 0.90/VIDA UTIL >= 80000 HORAS/ >=4000K, und 16.00 587.11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.00 9,393.76 9,393.760
IP66
05.06 EQUIPOS ELÉCTRICOS Y MECÁNICOS
05.06.01 GRUPOS ELECTROGENOS
GRUPO ELECTROGENO, ENCAPSULADO E INSONORIZADO,
05.06.01.01 und 1.00 22,033.90 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 22,033.90 0.00 0.00 22,033.900
POTENCIA CONTINUA DE 20KVA, 220V, 60Hz
05.06.02 POSTES
POSTE DE ACERO NEGRO REVESTIDO CON MATERIAL ESCA
05.06.02.01 und 16.00 475.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.00 7,600.16 0.00 0.00 7,600.160
D=15CM, LONGITUD 3.5 M.
05.06.02.02 POSTE DE CAC 9M/300 und 1.00 1,096.76 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,096.76 0.00 0.00 1,096.760
05.06.02.03 DADO DE CONCRETO 0.40X0.40M H=1.1, ACABADO PULIDO und 16.00 154.51 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.00 2,472.16 0.00 0.00 2,472.160

05.07 PRUEBAS ELECTRICAS Y/O HERMETICIDAD

05.07.01 PRUEBAS DEL NIVEL DE AISLAMIENTO EN CADA TABLERO und 9.00 314.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 9.00 2,827.98 0.00 0.00 2,827.980
MEDICIÓN DE LA RESISTENCIA DE LOS POZOS DE PUESTA A
05.07.02 und 11.00 174.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 11.00 1,916.42 0.00 0.00 1,916.420
TIERRA
06 INSTALACIONES DE COMUNICACIONES

06.01 CABLEADO ESTRUCTURADO EN INTERIORES DE EDIFICIOS


06.01.01 CABLES EN TUBERIAS
CABLES PARA SISTEMA DE EMERGENCIA FLP BLINDADO
06.01.01.01 m 870.10 5.23 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 870.10 4,550.62 0.00 0.00 4,550.620
4X18, CERTIFICACION CL/NEC
06.01.01.02 CABLES PARA TELEVISION COAXIAL RG-5 m 309.10 4.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 309.10 1,517.68 0.00 0.00 1,517.680
CABLES PARA TELEFONO/INTERNET/CAMARA DE VIDEO UTP
06.01.01.03 m 1,427.60 6.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,427.60 9,707.68 0.00 0.00 9,707.680
CAT 6A
CABLES PARA VIDEO-PROYECTOR, CABLE HDMI 20MTS
06.01.01.04 m 43.40 4.70 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 43.40 203.98 0.00 0.00 203.980
V.1.4 HIGH FULL MAX
06.01.01.05 CONDUCTOR DE PERIFONEO 2X14 R/N m 50.60 13.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 49.90 648.65 0.70 9.15 657.800
06.02 CANALETAS CONDUCTOS O TUBERIAS
06.02.01 TUBERIA 20mmØ PVC m 680.40 7.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 680.40 5,041.76 0.00 0.00 5,041.760
06.02.02 TUBERIA 25mmØ PVC m 292.95 13.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 292.95 3,992.91 0.00 0.00 3,992.910
06.02.03 TUBERIA 35mmØ PVC m 57.75 14.41 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 57.75 832.18 0.00 0.00 832.180
06.03 SALIDAS
06.03.01 SALIDAS RED
06.03.01.01 SALIDA DE SERVIDOR pto 1.00 1,116.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 1,116.66 0.00 0.00 1,116.660
06.03.01.02 SALIDA PARA RED DATA CON TOMA RJ45 0,40 - PARED pto 10.00 111.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 1,117.80 0.00 0.00 1,117.800
06.03.01.03 SALIDA PARA TOMA HDMI EN PARED pto 6.00 73.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.20 308.78 1.80 132.16 440.940
06.03.01.04 SALIDA PARA PROYECTORES pto 6.00 80.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 480.12 480.120
06.03.02 SALIDAS DE SISTEMA CONTRA INCENDIO

SALIDA PARA CENTRAL DE ALARMA CONTRAINCENDIO


06.03.02.01 (FACP), TIPO CONVENCIONAL 5 ZONAS, INCLUYE pto 2.00 286.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 572.56 572.560
EQUIPAMIENTO

SALIDA PARA ACTIVACION MANUAL DE ALARMA, INCLUYE


06.03.02.02 pto 8.00 244.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 1,952.08 1,952.080
EQUIPAMIENTOCONTRAINCENDIO
CRONOGRAMA DE AVANCE VALORIZADO
OBRA MEJORAMIENTO DEL SERVICIO EDUCATIVO DE LA I.E 80659 NUESTRA SEÑORA DE FATIMA DEL CASERIO DE TOGOPON DEL DISTRITO DE CARABAMBA PROVINCIA DE JULCAN DEPARTAMENTO DE LA LIBERTAD

Lugar LA LIBERTAD - JULCAN - CARABAMBA


1 1 2 2 3 3 4 4 5 5 6 6
MES 01 MES 02 MES 03 MES 04 MES 05 MES 06
PRECIO
Item Descripción UNIDAD METRADO TOTAL
UNITARIO S/. Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial Metrado Parcial

SALIDA PARA SIRENA ALARMA CONTRA INCENDIO / LUZ


06.03.02.03 pto 8.00 108.59 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 868.72 868.720
ESTROBOSCOPICA , INCLUYE EQUIPAMIENTO

SALIDA DE DETECTOR DE HUMO DIRECCIONABLE


06.03.02.04 pto 33.00 341.75 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 33.00 11,277.75 11,277.750
INTELIGENTE , INCLUYE EQUIPAMIENTO
SALIDA DE DETECTOR DE TEMPERATURA INTELIGENTE ,
06.03.02.05 pto 4.00 242.37 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 969.48 969.480
INCLUYE EQUIPAMIENTO
06.03.03 SISTEMA DE SEGURIDAD Y TV
06.03.03.01 SALIDA PARA DVR DE 12 CANALES (INCLUYE EQUIPO) pto 1.00 106.72 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 106.72 106.720
SALIDA PARA CAMARAS DE VIGILANCIA FIJAS, CON EQUIPO
06.03.03.02 TIPO BULLET 5MP EXIR 2.0-SMART IR 40M IP67 - pto 8.00 110.36 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 882.88 882.880
ANALÓGICO
06.03.03.03 SALIDA PARA CENTRAL DE TV (INCLUYE EQUIPO DVB) pto 1.00 114.57 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 114.57 114.570

06.03.03.04 SALIDA PARA TV - (INCLUYE TOMA Y CABLEADO) pto 5.00 155.49 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 5.00 777.45 777.450
06.03.04 SISTEMA DE PERIFONEO
SALIDA CENTRAL DE PERIFONEO/MEZCLADORA 500W,
06.03.04.01 und 2.00 2,524.66 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 5,049.32 5,049.320
(INCLUYE EQUIPO)

06.03.04.02 SALIDA PARA AMPLIFICADOR 500W, (INCLUYE EQUIPO) und 2.00 2,100.64 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 4,201.28 4,201.280
SALIDA PARA PARLANTES 8", (INCLUYE EQUIPO Y RACK DE
06.03.04.03 und 6.00 416.54 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 2,499.24 2,499.240
PARLANTE)
06.04 VARIOS
06.04.01 CAJAS DE PASO
CAJA DE PASE RECTANGULAR PVC C/TAPA CIEGA 100 X 50
06.04.01.01 und 10.00 13.82 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 138.20 138.200
X 50 mm
CAJA DE PASE F°G° 100X100X50 MM - (4" X 4" X 2") C/TAPA
06.04.01.02 und 10.00 26.47 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 264.70 264.700
CIEGA 100 X 100 X 50 mm
CAJA DE PASE F°G° 150X150X100 MM - (6" X 6" X 4")C/TAPA
06.04.01.03 und 2.00 31.84 2.00 63.68 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 63.680
CIEGA 150 X 150 X 100 mm
CAJA DE PASE F°G° 200X200X100 MM - (8" X 8" X 4")C/TAPA
06.04.01.04 und 6.00 40.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 242.64 242.640
CIEGA 200 X 200 X 100 mm
06.04.02 PRUEBAS DE COMUNICACIONES
06.04.02.01 PRUEBA DE VERIFICACION DE LAS INSTALACIONES DE DATA und 10.00 63.14 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 631.40 631.400
SUMINISTRO E INSTALACION DE RED SATELITAL DE
06.04.02.02 und 1.00 576.79 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 576.79 576.790
INTERNET
06.04.02.03 SUMINISTRO E INSTALACION DE EQUIPO DVR Y CAMARAS und 8.00 921.44 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 8.00 7,371.52 7,371.520

SUMINISTRO E INSTALACION DE GABINETE PRINCIPAL PARA


06.04.02.04 und 1.00 4,409.65 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 4,409.65 4,409.650
RED DATA, INCLUYE SERVIDOR Y SWITCH

06.04.02.05 SUMINISTRO E INSTALACION DE CENTRAL DE TVliviana. und 1.00 2,626.33 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 2,626.33 2,626.330
SUMINISTRO E INSTALACION DE RACK, PROYECTOR DE
06.04.02.06 und 1.00 3,367.38 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 3,367.38 3,367.380
3500 LUMENES 3D
07 INSTALACIONES DE GAS
07.01 TUBERIAS
07.01.01 TUBERIA DE COBRE 1/2Ø:0.15m FROF x 0.10 ANCHO m 6.00 186.42 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 6.00 1,118.52 1,118.520
07.02 ARTEFACTOS (GLP O GNS)
07.02.01 BALON DE 45KG GLP und 4.00 501.18 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 2,004.72 2,004.720
07.03 ACCESORIOS
07.03.01 SALIDA PARA COCINA pto 2.00 218.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 437.00 437.000
07.04 PRUEBAS DE HERMETICIDAD
PRUEBAS DE HERMETICIDAD Y PUESTA EN SERVICIO DEL
07.04.01 pto 2.00 1,091.28 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.00 2,182.56 2,182.560
SISTEMA DE GAS

COSTO DIRECTO 531,644.58 286,555.08 2,180,186.71 1,533,606.78 783,446.68 879,613.41 6,195,053.24


GASTOS GENERALES (9.74668280696376%) 51,817.71 27,929.61 212,495.88 149,475.79 76,360.06 85,733.14 603,812.19
UTILIDADES (5%) 26,582.23 14,327.75 109,009.34 76,680.34 39,172.33 43,980.67 309,752.66

SUB TOTAL 610,044.52 328,812.44 2,501,691.93 1,759,762.91 898,979.07 1,009,327.22 7,108,618.09


IGV (18 %) 109,808.01 59,186.24 450,304.55 316,757.32 161,816.23 181,678.90 1,279,551.26

TOTAL DE OBRAS CIVILES 719,852.53 387,998.68 2,951,996.48 2,076,520.23 1,060,795.30 1,191,006.12 8,388,169.35
GASTOS COVID - 19 7,124.85 7,124.85 7,124.85 7,124.85 7,124.85 7,124.86 42,749.11
MOBILIARIO 0.00 0.00 0.00 0.00 0.00 105,115.33 105,115.33
PRESUPUESTO TOTAL 726,977.38 395,123.53 2,959,121.33 2,083,645.08 1,067,920.15 1,303,246.31 8,536,033.78
SUPERVISIÓN 59,990.71 59,990.71 59,990.71 59,990.71 59,990.71 59,990.70 359,944.25
TOTAL DE INVERSIÓN PARA LA OBRA 786,968.09 455,114.24 3,019,112.04 2,143,635.79 1,127,910.86 1,363,237.01 8,895,978.03
% AVANCE MENSUAL 16.67% 4.63% 34.67% 24.41% 12.51% 7.11% 100.00%
% DE AVANCE ACUMULADO 16.67% 21.30% 55.97% 80.38% 92.89% 100.00% 100.00%
Grafico de Distribución
40.00%

35.00%

30.00%

25.00%

20.00%

15.00%

10.00%

5.00%

0.00%
Mes 01 Mes 02 Mes 03 Mes 04 Mes 05 Mes 06
CURVA S
100.00%

90.00%

80.00%

70.00%

60.00%

50.00%

40.00%

30.00%

20.00%

10.00%

0.00%
Inicio Mes 01 Mes 02 Mes 03 Mes 04 Mes 05 Mes 06