Cotizaciónes 4
Cotizaciónes 4
Cotizaciónes 4
27,000.00
10,600.00
3,500.00
10,000.00
24,000.00
437,126.50
218,563.25
655,689.75
Materiales Unds Costo U Costo T
Caneca hierro 1 $ 30,000.00 $ 30,000.00
Tubo 100x100- 0.24 $ 35,000.00 $ 8,283.33
Tubo 100x100-2 1.00 $ 27,000.00 $ 27,000.00
Lamina base C20 Galvanizado 1 $ 15,000.00 $ 15,000.00
Lamina salida ducto 30 x30 1 $ 20,000.00 $ 20,000.00
Lamina superior HR 1 $ 20,000.00 $ 20,000.00
Platina 1 1/2" x 1/8" 0.12 $ 35,400.00 $ 4,401.40
Varilla 1/2" cuadrada sosten caneca 0.1 $ 50,000.00 $ 4,066.67
Varilla 1/2" ducto salida 0.2 $ 27,000.00 $ 6,300.00
Angulo 1 1/2" x 1/8 0.16 $ 75,900.00 $ 11,891.00
Soldadura 6011 x kg 3 $ 18,000.00 $ 54,000.00
Disco corte 5 $ 4,500.00 $ 22,500.00
Disco desbaste 2 $ 5,800.00 $ 11,600.00
Manija 1 $ 3,000.00 $ 3,000.00
Visagras 3/8" 2 $ 2,200.00 $ 4,400.00
Deuda Chatarreria 1 $ 7,000.00 $ 7,000.00
Broca 1/8 incolma 2 $ 3,800.00 $ 7,600.00
Broca 11/64 incolma 1 $ 4,350.00 $ 4,350.00
Broca 1/4 incolma 1 $ 7,750.00 $ 7,750.00
Chazo metalico 1/4" 8 $ 280.00 $ 2,240.00
Varilla 3/8" parrilla 0.84 $ 16,600.00 $ 13,935.70
Transportes 1 $ 40,000.00 $ 40,000.00
Broca muro 1/8" 1 $ 3,700.00 $ 3,700.00
Broca muro 1/4" 1 $ 4,500.00 $ 4,500.00
Materiales $ 236,518.10
Mano de obra (70%-MEDIA C) $ 205,562.67
Resto almadana $ 30,000.00
Termometro $ 40,000.00
Total $ 512,080.77
sobrecosto de 32000
$ 1,220,150.00
Materiales Unds Costo U Costo T
TUBO 2"X1" C18 X 6 m 1 $ 20,000.00 $ 20,000.00
TUBO 2"X1" C18 X 6 m 1 $ 67,000.00 $ 67,000.00
Soldadura 6011 x kg 1 $ 19,500.00 $ 19,500.00
Disco desbaste Dewalt 1 $ 5,800.00 $ 5,800.00
Disco corte Dewalt 3 $ 4,500.00 $ 13,500.00
Tabla 18x3x300 1 $ 30,000.00 $ 30,000.00
1/4 sellador catalizado 1 $ 22,000.00 $ 22,000.00
1/4 barniz 1 $ 30,000.00 $ 30,000.00
1/2 ajustador 2 $ 5,300.00 $ 10,600.00
1/2 thinner 1 $ 3,500.00 $ 3,500.00
estopa x lb 1 $ 5,000.00 $ 5,000.00
1/16 base negra gricoat 1 $ 9,000.00 $ 9,000.00
1/32 catalizador 1 $ 13,000.00 $ 13,000.00
Tornillo ensamble 2" 20 $ 100.00 $ 2,000.00
Transporte 1 $ 5,000.00 $ 5,000.00
Materiales $ 255,900.00
Mano de obra (40%-MEDIA C) $ 102,360.00
Total $ 358,260.00
Materiales $ 498,400.00
Mano de obra (90%-ALTA C) $ 448,560.00
Total $ 946,960.00
Materiales Unds Costo U Costo T
Universal 1 $ 67,000.00 $ 67,000.00
Niple 5 1 $ 16,000.00 $ 16,000.00
Niple 15 1 $ 20,000.00 $ 20,000.00
Platina 1/4 x20 cm 1 $ 10,000.00 $ 10,000.00
Soldadura 6011 0.02 $ 18,000.00 $ 428.57
Silicona 1 $ 3,000.00 $ 3,000.00
Eje 1 $ 1,000.00 $ 1,000.00
Materiales $ 117,428.57
Mano de obra (50%-baja) $ 70,457.14
Total $ 187,885.71