Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Itch Acj 01 - SH

Descargar como pdf o txt
Descargar como pdf o txt
Está en la página 1de 1

NORTE

PEN
DIEN
TE 0
.71%

PENDIENTE 1.36%
PEN
DIEN
TE 0
.71%

PEN
D IEN
TE 1
.09%

PEN
DIEN
TE 1
.09%

PENDIENTE 1.36%
R IO PEN
DIEN

A
TE 1
.09%

EN
T
C EN
.
LVD
B A1 INDICA EJE CONSTRUCTIVO

PENDIENTE 0.21%
0.00 INDICA COTA A EJE
0.00

PENDIENTE 1.36%
1%
N.P.T. INDICA NIVEL DE PISO TERMINADO
TE
EN
DI
PEN
N.PL.
CISTERNA DE
AGUA TRATADA
N.L.B.L.
N.L.B.L. INDICA NIVEL LECHO BAJO DE LOSA

PENDIENTE 0.44%
N.L.B.C.
N.L.B.C. INDICA NIVEL LECHO BAJO DE CUBIERTA
N.L.S.C.
N.Az. INDICA NIVEL LECHO SUPERIOR DE CUBIERTA

N.Az.
N.B. INDICA NIVEL DE AZOTEA
N.B.
N.Pr. INDICA NIVEL DE BANQUETA

N.Pr.
N.A.V. INDICA NIVEL DE PRETIL

N.A.V.
N.L.B.P. INDICA NIVEL DE ARROYO VEHICULAR
TANQUE
TANQUE TERMO
DIESEL
N.L.B.P.
N.Jr.

N.Jr. INDICA NIVEL DE JARDIN

PENDIENTE 1% PENDIENTE 1% PENDIENTE 1% PENDIENTE 1%

CASETA DE
PENDIENTE 1% PENDIENTE 1%
pendiente 3% INDICA CAMBIO DE ALTURA EN PISO
pendiente 3% INDICA PORCENTAJE DE PENDIENTE
RAMPA 10%

h.m.=1.10 m h.m.=1.10 m h.m.=1.10 m h.m.=1.10 m h.m.=1.10 m h.m.=1.10 m

Aire acondicionado
Basura Gases medicinales
TORA
RECEP-

CELDA

Sistema

Junta Constructuva
TRANSFER TRANSFER

h.m.=1.10 m
-03 -01
Contra
TRINCHERA

ESPACIO LIBRE MINIMO PARA FACILITAR EL MANTENIMIENTO.


CELDA

TABLERO
Manifol Bomba
ITP

CAJA DE VALVULAS GENERAL


TDG-01 Incendio

h.m.=1.10 m
TR-01 Nitrogeno Vacio
TR-01

TRANSFER
HIDRANTE 1000 KVA -05
TR-02

TRANSFER TRANSFER
N.P.L. = N.L.B.L. MANIFOL AUTOMATICO PARA
NITROGENO 10X10 N.P.L. = N.L.B.L.
TR-03

-04 -02

TRINCHERA BOMBA PARA VACIO,


h.m.=1.10 m h.m.=1.10 m h.m.=1.10 m h.m.=1.10 m h.m.=1.10 m h.m.=1.10 m
Basura RAMPA 8% N.P.L. = N.L.B.L. tratamiento
HG. Tanque (gal)

de agua Manifol NIVEL M2

h.m.=1.70 m
Oxigeno

Entrega
TE N.PL. +2.70/N.P.T.
N.P.L. = N.L.B.L. Compresor Compresor
TR-02 Aire Aire

h.m.=1.10 m
1000 KVA
TR-03
Equipo de
R.P.B.I. bombeo y
tableros Compresor de aire Scroll libre

SCFM@145 PSIG. Tanque 80


COMPRESOR PARA AIRE,
MQP1008 SCFM@50 PSIG.
PLANTA BAJA 11,048.61
h.m.=0.90m

(Gal) Tanque de 240 (Gal).

MANIFOL AUTOMATICO PARA


OXIGENO 30X30

h.m.=1.10 m h.m.=1.10 m
h.m.=1.50m
h.m.=1.80 m h.m.=1.80 m h.m.=1.80 m

1%
IEN
TE PRIMER NIVEL 8,004.10
ND
PE

ACCESO A PENDIENTE 1% PENDIENTE 1%


ESTACIONAMIENTO
DE PERSONAL Y DE
SERVICIOS SEGUNDO NIVEL 6,929.50

H=0.45
3%
CARGA Y
RAMPA 10.2% H=0.73 RAMPA 6%
pend. 1%

pend. 1%

pend. 1%
DESCARGA

ACCESO
CARGA Y
DESCARGA H=0.34 1,101.07
H=0.60
INSUMOS H=0.18

PENDIENTE 1% h.m.=1.10 m h.m.=1.10 m h.m.=1.10 m h.m.=1.10 m h.m.=1.10 m h.m.=1.10 m h.m.=1.10 m h.m.=1.10 m h.m.=1.10 m

Control
Junta Constructuva

PENDIENTE 0.22%
Sanitario

CASETAS 64.67

h.m.=1.10 m
N.PL. +2.70/N.P.T.
N.PL. +3.00/N.P.T.
N.PL. + 2.70/N.P.T.
h.m.=1.90m

N.PL. + 2.70/N.P.T.

h.m.=1.10 m
R
TOTAL 27,147.95
h.m.=1.90m
h.m.=1.20m

1
h.m.=1.90m
h.m.=1.20m h.m.=1.90m

R.L. 2
Lavado de Carros
h.m.=1.20 m h.m.=1.20 m h.m.=1.20 m h.m.=1.20 m Termo
L.C. L.C.
L.C. L.C. L.C.
h.m.=1.90m
h.m.=1.10 m

Trabajo de parto (6 lugares)

h.m.=1.10 m
PENDIENTE 1% 2
h.m.=2.10 m

L.C.
N.PL. + 2.70/N.P.T.
N.PL. +2.70/N.P.T. N.PL. +2.70/N.P.T.
h.m.=1.20m

h.m.=1.90m h.m.=1.90m
h.m.=1.70m

Equipo Rodable
N.Jr. - 0.10 1

N.PL. +2.70/N.P.T.

h.m.=1.10 m
P.M.S.
N.PL. +2.40/N.P.T.
h.m.=1.20m

N.PL. +2.70/N.P.T.
y Soluciones R.
LIBRE Archivo de
h.m.=2.10 m

Laminillas,
R. G.M. R.L. Diapositivas,
h.m.=1.90m

Bloques de
Parafina
h.m.=1.10 m

R
h.m.=1.70m

Entrega

h.m.=1.10 m
h.m.=1.90m

h.m.=2.10 m
junta constructuva

D-HS

Carga de
Comedor
h.m.=1.90m

2
Celulares
N.Jr. - 0.10
h.m.=1.70m

(100 lugares)

h.m.=1.10 m
1
PENDIENTE 1%
h.m.=1.10 m

Expendedora N.PL. +3.00/N.P.T.


h.m.=1.90m

h.m.=1.20m
3
Estacionamiento
h.m.=1.20m
Temporal 8%
h.m.=2.10 m

0.1
Laboratorio IEN
TE
h.m.=1.20m
h.m.=1.90m

R.C.
N.PL. +3.00/N.P.T. Fotocopiado
4 ND
de

h.m.=1.10 m
N.PL. + 2.70/N.P.T. h.m.=1.20m PE
h.m.=1.70m
h.m.=1.20 m

3 2 1
h.m.=1.90m
h.m.=1.10 m

6
5
Lacteas
D-HS

Tococirugia N.PL. + 2.70/N.P.T. N.PL. +2.70/N.P.T.


N.PL. + 2.70/N.P.T.

Cardio-

NOTAS GENERALES
EQUIPO de ENVIO NEUMATICO

h.m.=0.80 m
PENDIENTE 1% Carro
Rojo
Cl. Libre

(ADEC)
D-HS
0.6 %
Elevador Pacientes Elevador Personal Elevador Especialista de Seguridad
Mama Elevador D-IE
Alimentos En El Trabajo PENDIENTE 0.6%
h.m.=0.80 m

N.PL. +2.70/N.P.T. R.P.B.I (2 Lugares)


N.PL. +2.700/N.P.T. Guarda Sala de
Espera
Ropa Guarda de
Limpia 16 18 20 22 24 26 28 N.PL. +3.00/N.P.T.
15 17 19 21 23 25 27 N.PL. +2.70/N.P.T. Equipos de
h.m.=1.20m

1 1 Electrica
R.
h.m.=1.20 m

h.m.=0.80 m

D-HS Expedientes
Entrega
Material 14 12 10 08 06 04 02
Limpio 13 11 09 07 05 03 01
Guarda
Insumos Secretaria
h.m.=1.20 m

R.L. P.M.S.
h.m.=0.80 m
h.m.=1.20 m

R.L. N.PL. +3.00/N.P.T.

Estacionamiento G.M.
R.
2 R.
G.M. G.M. C.B. C.B. N.PL. +3.00/N.P.T.
Ambulancias N.PL. +3.00/N.P.T.
Entrega
Material
Centro de colecta
h.m.=0.80 m

Limpio N.PL. + 2.40/N.P.T.


PENDIENTE 1%
Grafo Solo D-HS N.PL. +2.70/N.P.T.
Salida

R. G.M.

N.PL. +2.70/N.P.T.
h.m.=0.80 m

N.P.T. + 0.00 h.m.=1.20m SELLO IMSS


h.m.=1.20m

P.M.S. R.L.
Carro
h.m.=1.20 m
Rojo
1 2
h.m.=0.80 m
Junta Constructiva

Filtro 1
de Salida h.m.=1.20m
h.m.=1.20m
h.m.=1.20m

PENDIENTE 0.78%
PENDIENTE 0.36%
h.m.=0.80 m

1
2 N.PL. +2.70/N.P.T.
h.m.=1.20m

h.m.=1.20 m
h.m.=1.20 m

2 R.L
h.m.=0.80 m

N.PL. +2.70/N.P.T. N.PL. +2.70/N.P.T.


N.P.T. + 0.00 G.M.
N.PL. +3.00/N.P.T.
Prelavado de Guarda
PENDIENTE 1% G.M.
Instrumental
R. Mensajero
Insumos
R. Anestesia
P.M.S. Ropa Limpia h.m.=1.20m h.m.=1.20m
PENDIENTE 0.22%
h.m.=1.20m

Glosa
h.m.=1.20m

D-HS
h.m.=0.80 m

h.m.=1.20m Entrega a
Hospital
N.PL. +2.70/N.P.T.
ESTACIONAMIENTO
3 5 6 8 9 10 N.PL. +3.00/N.P.T.
AMBULANCIAS
h.m.=1.10 m

1 2 4 7 D-HS
h.m.=1.20m

h.m.=0.80 m

h.m.=1.20m
(5 CAJONES)
Junta Constructiva

N.PL. +2.70/N.P.T.
N.P.T. + 0.00
N.PL. +3.00/N.P.T.
SALIDA VEHICULAR DE
h.m.=0.80 m
h.m.=1.20m

URGENCIAS RELATIVAS

R. L h.m.=1.20 m
h.m.=0.80 m
h.m.=1.20m

D-HS
Guarda
Medica-
Mentos
PENDIENTE 1%
h.m.=1.20 m
h.m.=0.80 m
h.m.=1.20m

14
13 15
h.m.=1.20 m

12 16 D-HS
11 17
10 18
09 19
5 08 20
07 21 Maquina
h.m.=1.20m

06 22
RAMPA 5%

Expendedora
h.m.=0.80 m

EL CONTENIDO DE ESTE PLANO Y/O DOCUMENTO CUMPLE CON LAS NORMAS


h.m.=1.20 m

05 23 Carga de
04 24
Celular
INSTITUCIONALES DE LA ESPECIALIDAD.
03 25
1 02 26
4 01 S 27
G.M. 28
Ropa
Limpia
CARGA Y
Ropa
DESCARGA
Limpia
Carro 2 N.PL. +3.00/N.P.T. H=0.65m
3
h.m.=1.10 m

Rojo

N.PL. +3.00/N.P.T. N.PL. +3.00/N.P.T. Farmacia


N.PL. +2.40/N.P.T.

2
N.PL. +2.70/N.P.T.
N.P.T. + 0.00
3
EL ESTRICTO APEGO A LOS SERVICIOS CONTRATADOS.
h.m.=1.20 m PENDIENTE 0.6%
PENDIENTE 1% Carro
h.m.=1.20 m

Rojo
PENDIENTE 0.26%

N.PL. + 2.70/N.P.T. 4
h.m.=1.20 m

1
N.P.T. + 0.00
B. A.

D-HS
Ropa
Limpia
EL GRUPO CONSTRUCTOR DEBE CONSULTAR Y COMPAGINAR ESTE PLANO CON LAS
1r 2r 1ct
1 2 3
G.M. 5 D-HS
h.m.=1.20 m
N.PL. +2.70/N.P.T. 13 15
N.PL. +3.00/N.P.T. 12 14 16
11 17
10 18
19

CONSTRUCTORA JILSA S.A. DE C.V.


1 09
N.PL. +3.00/N.P.T. 08 20
h.m.=1.20m

07 Elevador 21
Cl. 22
06 Personal
2 05 Electrico23
N.PL. +2.40/N.P.T. 1
04 24
03 25

Estacionamiento Urgencias 3 2
D-HS N.PL. +3.00/N.P.T. Anaqueles de Alto 01
02
27
26

28
temporal de N.PL. +2.70/N.P.T. Consumo
S
4
Urgencias h.m.=1.20 m h.m.=1.20 m
3
Acceso
D-IE 1 2 Personal
Relativas Cl. Electrico
D-IE Junta Constructuva
PENDIENTE 1% Junta Constructuva
Junta Constructuva
PENDIENTE 0.22%

Directorio
28 S D-HS
27 01
26 02
N.PL. +3.00/N.P.T. 25 03
Ropa de Calle 24
23
04
05 MAYORGA
REPRESENTANTE LEGAL
h.m.=1.20m

22 06
Junta Constructiva

21 07
20 08
19 09
18 10
17 11
16 12
h.m.=0.80 m 15 13
MANIFOL AUTOMATICO (IBER)
Cto. 14
Electrico
h.m.=0.80 m

PARA OXIGENO 30X30

D-HS
D-HS

Cargadores

ARQ. RAIMUNDO DE JESUS


h.m.=0.80 m

de Celular
Expendedora
2 3
N.PL. +3.00/N.P.T.
RESPONSABLE PROY. HERNANDEZ MEDRANO
N.PL. +3.00/N.P.T. N.PL. +2.40 S.N.P.T SUPERINTENDENTE TECNICO
RAMPA 8%

PENDIENTE 1% Guarda de N.PL. +2.40/N.P.T.


CED. PROF. 3007568
Equipo
CED. PROF. 4292849
Estela de
Urgencias 1 4

PENDIENTE 1%
h.m.=0.80 m h.m.=2.10 m h.m.=2.10 m h.m.=2.10 m h.m.=2.10 m 0 2 12 30
N.PL. + 2.70 S.N.P.T
h.m.=2.10 m h.m.=2.10 m h.m.=2.10 m
R.L.
PENDIENTE 0.22%

DIRECTOR GENERAL
%
TE 1

1%
PE

PE

PLANTA DE TRATAMIENTO
ND

E
ND

Acceso Peatonal
DIEN

NT
IE

IE

IE
N

NT

Urgencias ND
TE
PEN

PE
1%

1%

h.m.=1.20m

ACCESO VEHICULAR Y Expendedoras


DE HAMBULANCIAS A
URGENCIAS N.PL. +3.00/N.P.T.

LIC. BORSALINO GONZALEZ ANDRADE


h.m.=1.10 m
PENDIENTE 1%

UNIDAD DE INFRAESTRUCTURA,
Estela de PROYECTOS ESPECIALES Y
Unidad
PENDIENTE 1%

bicicletas
COORDINADOR DE PROYECTOS Y SEGUIMIENTO INSTITUCIONAL
PENDIENTE 1%

ARQ.
HIDRANTE
ACCESO Y SALIDA ACCESO Y SALIDA
ESTACIONAMIENTO ESTACIONAMIENTO
PERSONAL

PARADA
CAJA DE VALVULAS AUTOBUS
LOCALIDAD
CAJA DE VALVULAS NAVOJOA, SONORA

AV. IGNACIO ALLENDE


CAJA DE VALVULAS

Ignacio Allende y Boulevard Centenario,


Colonia Tierra Blanca, C.P. 85820.
TIPO DE UNIDAD
0
HOSPITAL GENERAL DE ZONA
TIPO DE OBRA CLAVE DEL
PLANO
NUEVA
PLANO

SEGURIDAD Y SOLIDARIDAD SOCIAL


PRIMARIA Y PUESTA A TIERRA
Planta Baja de Conjunto
FECHA ESCALA

09-2023 1:300

También podría gustarte