V14 V15 Fundacion
V14 V15 Fundacion
V14 V15 Fundacion
30
35
35
30
30
20 20 20
20 20
P16 P12 B0 P9 P5 P1
20
2P3∅10 (185) 87 2 ∅10 2 320 340 680 4.2
2P3∅10 (185) 1P12∅10
15 2P5∅10 (205) 93 3 ∅10 4 185 185 740 4.6
(105)
2P10∅12 (200) 15 2P7∅10 (360)
25
4 ∅10 2 180 205 410 2.5
98
17 2P8∅10 (370) 5 ∅10 2 205 205 410 2.5
2P1∅10 (320)
25
6 ∅10 3 205 230 690 4.3
20
20
9 ∅12 2 350 370 740 6.6
20
1P13∅10 (245)
2P4∅10 (205) 17 13 ∅10 1 245 245 245 1.5
1P15∅10 (250)
14 ∅10 1 155 155 155 1.0
40 1P14∅10 (155)
23
15 ∅10 1 250 250 250 1.5
23
16 ∅6 53 86 4558 10.1
17x1eP16∅6 c/19 8x1eP17∅6 c/20 9x1eP17∅6 c/20 18x1eP16∅6 c/19 18x1eP16∅6 c/19 13
306 148 7.57.5 167 326 336
6
28
17 ∅6 17 96 1632 3.6
13
Total+10%: 73.5
V15
1 ∅10 2 69 69 138 0.9
V15
20
20
2 ∅10 2 69 109 218 1.3
30
18
18
15
69
23
4 ∅6 3 76 228 0.5
B4 B3 Resumen Acero Long. total Peso+10%
8
Plano de pórticos (m) (kg) Total
Total+10%: 4.6
0.75
∅6: 15.6
B 400 S, Ys=1.15 ∅6 368.5 90 ∅10: 48.2
∅12: 11.2
2P1∅10 ∅16: 3.1
∅8 33.6 15
(69) Total: 78.1
∅10 379.4 257
a ∅12 76.5 75
15x30
∅16 27.8 48
∅20 12.9 35 520
2P3∅10
8 (121) 8
2ª capa
18
18
2P2∅10
(109)
3x
1eP4∅6 CARGAS:
-Peso Estructura 2,5t/m3
c/18 -Mampostería 1,6t/m3
-Sobrecarga 0.2 tn/m2
15 45 15 -Piso y contrapiso 0.1 tn/m2
MATERIALES:
-Hormigón: Fck 25 MPa
-Acero: Fyk 400 MPa
ED. CORPORATIVO
REFERENCIAS:
-Acotación en centimetros.
OBSERVACIONES: CLIENTE: ARQ. RAMOS
-Recubrimiento de pilares: 2cm
-Recubrimiento en vigas de
fundación: 2 cm
-Recubrimientos en losas: 2 cm PROYECTO ESTRUCTURAL
-NPT +0,00
-Los niveles se refieren al filo
superior
Planta de fundación
Viga V14, V15
A1 1/50 DISEÑÓ: ING. I. ADORNO REVISÓ: ING. I. ADORNO FECHA: 21-01-2022 CÓD.:EH- 08