Formation CPE
Formation CPE
Formation CPE
Sommaire:
Fonctionnement de linstallation:
1.
2.
3.
4.
Le CODU / CPE:
La wallbox:
La wallbox (partie
indoor) va alimenter le
CODU en -48v.
Reoit et envoie la data.
Entre -48v.
Plug Ethernet.
Sortie / entre CODU.
Led status (orange).
Led Ethernet (vert).
LIDU:
LIDU va servir
connecter un fax, de la
voix ou bien un autre
client tout en utilisant le
mme CODU.
Prparation de linstallation:
1.
2.
3.
4.
5.
6.
7.
Dbut de linstallation:
Zone de Fresnel
900 MHz
Frquence GSM:
300000000 m/s
C=
0.3333 m
Longueur d'onde
d1
d2
4450 m
2450 m
900000000 Hz
d1
R
50 m
2050 m
3600 MHz
Frquence BLR:
300000000
m/s
C=
0.0833 m
Longueur d'onde
4m
19 m
d2
4450 m
2450 m
3600000000 Hz
26000 MHz 26000000000 Hz
Frquence BLR:
300000000 m/s
C=
0.0115 m
Longueur d'onde
R
50 m
2050 m
d1
d2
2m
4450 m
50 m
1m
10 m
2450 m
2050 m
4m
AZIMUT
Pattern dantenne
Access Point Antenna Radiation Pattern
20
15
10
TILT
Gain (dBi)
0
5
10
15
20
25
30
35
40
180
160
140
120
100
80
60
40
20
0
20
40
Azimuth / Elevation (deg)
60
80
100
120
140
160
180
AP azimuth H pol
AP azimuth V pol
AP elevation H pol
AP elevation V pol
Optimisation radio
Mt Mobile
Utilisation VS TOOL
Dmarrage de VSTOOL
Se connecter au CODU
Dmarrer:
Downstream et Upstream
Une fois la connexion au CODU tablie:
Il va:
1/ Se synchroniser avec lAP
2/ Attendre linformation en downstream de lAP
3/ Dtecter le Broadcast downstream de lAP
4/ Tuner lupstream (PA)
5/ Senregistrer
Tirage du cble:
Connexion de la wallbox:
1.
2.
3.
4.
5.
6.
7.
8.
9.
Tests du lien:
Explication au client:
Vrification de linstallation:
Panne et remde:
Premire vrification:
Avant tout, vrifier ltat du cble et des
connecteurs (RJ45, punch dans la wallbox, ).
Vrifier la longueur du cble qui peut tre
utilise avec ce CODU en utilisant loutil tableur
de mesure.
Unit Type:
Status
Frequency
3.5 GHz
Medium (PA1)
There is a problem!
PA
Type
2 OK
2
Pig tail
Present?
Length (m)
CAT-5 UTP14c
Cable resistance
0
0,0000000
Custom PSU W
4 OK
54 <-- IGNORED
200 <-- IGNORED
0,16306
CODU cable
Length (m)
LP-CODU #1
Cable resistance
Present
No
PSU connected
No
Powered
9,7838396
Run length
Present
No
No
Powered
CAT-5 FTP
2 <-- IGNORED
none
1 <-- IGNORED
0 <-- IGNORED
Run length
LP-CODU #2 to LP-CODU #3
Data Cable Type
CAT-5 FTP
2 <-- IGNORED
none
1 <-- IGNORED
Cable resistance
Present
No
PSU connected
No
Powered
0 <-- IGNORED
0,0000000
Run length
0,8 ohms
9,8 ohms
11,3 ohms
48,4 W
100,0 W
38,0 V
36,1
0,0
0,0
0,0
V
W
A
W
OK
CAT-5 UTP
Length (m)
Wallbox
Cable resistance
2
1 <-- IGNORED
0 <-- IGNORED
0,0000000
Run length
IDU
non E1
Wallbox resistance
WB / LPRB to CODU
Total resistance
0,2 ohms
0,6 ohms
LP-CODU #3 to Wallbox
Yes
Powered
54,0 V
2,7 V
51,3 V
0,0000000
Length (m)
LP-CODU #3
90
LP-CODU #1 to LP-CODU #2
Cable resistance
PSU connected
1
90
Length (m)
LP-CODU #2
Service
PSU
Custom PSU V
Cable Type
PSU connected
CODU, ASIC
CAT-5 FTP
Length (m)
Run length
3,0000000
Cable type
93,0 m
Number LPRBs
CODU cable run
LPRB 1 cable run
LPRB 2 cable run
0,0
93,0 m
0,0 m
0,0 m
0,0 m
Mix
90,0 m
93,0 m
OK
Le CODU se dregistre:
>>vrifier les connecteurs.
voir si rien ne passe devant le CODU ( arbre, drapeau,).
!!!si par rflexion voir si on ne reflte pas sur une vitre
demander au NOC si il ny a pas de coupure sur le secteur concern.
demander si le service est bien configur.
changer le CODU.
Network boot:
>>on va procder un network boot cest-dire que lon va effacer et reconfigurer limage
du CODU ce qui va souvent permettre de
relancer le CODU !
!!!Rinitialisation complte du CODU!!!
Questions?