The objective of this study is to provide selected case studies of public infrastructure projects in southeast Europe (SEE) and to draw conclusions and make recommendations on what type of infrastructure planning is needed, and what... more
The objective of this study is to provide selected case studies of public infrastructure projects in southeast Europe (SEE) and to draw conclusions and make recommendations on what type of infrastructure planning is needed, and what conditions need to be fulfilled to achieve socially, environmentally and economically sustainable infrastructure. The covered countries are from the Western Balkans: Bosnia and Herzegovina, Kosovo, Macedonia, Montenegro and Serbia and from the EU: Bulgaria and Slovenia.
Research Interests:
The analysis had the intention to give a general picture about public infrastructure projects in Macedonia which provides further opportunity to perform more concentrated analyzes on the identified problems. The final part of the study... more
The analysis had the intention to give a general
picture about public infrastructure projects in
Macedonia which provides further opportunity
to perform more concentrated analyzes on
the identified problems. The final part of the
study portrays the recommendations that
state institutions and the IFI’s should take into
consideration in order to realise better, safer,
greener and more environmentally friendly public
infrastructure projects. The recommendations are
not final, but further additional analysis can be
conducted on their basis or on the basis of each
identified problem for each stakeholder separately.
picture about public infrastructure projects in
Macedonia which provides further opportunity
to perform more concentrated analyzes on
the identified problems. The final part of the
study portrays the recommendations that
state institutions and the IFI’s should take into
consideration in order to realise better, safer,
greener and more environmentally friendly public
infrastructure projects. The recommendations are
not final, but further additional analysis can be
conducted on their basis or on the basis of each
identified problem for each stakeholder separately.