Papers by Sufi Syahiraazhar
This paper presents the analysis of pile failure for 2 columns combine pile cap. The aim of this ... more This paper presents the analysis of pile failure for 2 columns combine pile cap. The aim of this study is to evaluate the optimum numbers and optimum location of replacement piles.forseveral common piles group arrangements resulting from the failure of a single pile in a pile group using Microsoft Excel. Results from the studyshow that the recommended number of replacement pile depends on the pile group efficiency factor adopted. This factor is applied in cases where the spacing of piles is generally reduced to less than three times the pile dimension due to the insertion of replacement piles within the pile group, thus the overall load carrying capacity of the pile group is reduced. Meanwhile, the optimum location of these replacement piles is directly influenced by the actual location of the failed pile and the initial net pile group eccentricity as well as the net column service load and also the pile spacing adopted. Thus, this study contributes by developing Optimum Replacement Pile Location Charts for several common pile group arrangements that usually adopted in practice. These charts can be used on site to locate the optimum position of replacement piles against actual net pile group eccentricities that recorded on site, as well as taking into account the net column service loads and pile spacing adopted
Teaching Documents by Sufi Syahiraazhar
To analyze the combine pile cap due to single pile failure.
To produce a computer program using M... more To analyze the combine pile cap due to single pile failure.
To produce a computer program using Microsoft Excel that can reanalyze failure of 2 column combine pile cap.
To determine the number of replacement pile.
To produce graph that propose the optimum location for replacement pile.
Uploads
Papers by Sufi Syahiraazhar
Teaching Documents by Sufi Syahiraazhar
To produce a computer program using Microsoft Excel that can reanalyze failure of 2 column combine pile cap.
To determine the number of replacement pile.
To produce graph that propose the optimum location for replacement pile.
To produce a computer program using Microsoft Excel that can reanalyze failure of 2 column combine pile cap.
To determine the number of replacement pile.
To produce graph that propose the optimum location for replacement pile.