PR211
PR211
PR211
It
En
ABB SACE declina ogni responsabilit per danni a cose e persone dovute alla mancata
ABB SACE declines all responsibility for damages to things or people caused by not following
All operations like installation, putting into service and maintenance, when prescribed, must be
Imballo.
Packing.
Per ogni interruttore previsto un'imballo standard, che garantisce la protezione nelle condizioni
If not specifically defined in the supply order every breaker is packed with a standard packing that
ambientali richieste per il normale funzionamento in servizio se non definite diversamente nell'ordine
guarantees protection in environmental conditions required for normal installation. For any
Installazione
Installation.
a)Verify the integrity of the circuit-breaker, the carried out connections and the protection settings;
b)Verify the functionality of the circuit-breaker by carrying out some operations without load; opening,
c) Carry out the tests provided by the standards on the complete installation.
All routine or extraordinary maintenance operations, when prescribed, must be carried out by
ABB SACE
SACE PR211
RH0061.001
L0426
1/4
SETTAGGIO
SETTING
I3
I1
A
ABB SACE
SACE PR211
RH0061.001
L0426
2/4
S4-S5
S6-S7
B
S4-S5
S6-S7
C
ABB SACE
SACE PR211
RH0061.001
L0426
3/4
TRIP TEST
1
ON
4
3
Trip
Preset-ready
CLAC!
D
ABB SACE
SACE PR211
RH0061.001
L0426
4/4
Head Office: Via Baioni, 35 - 24123 Bergamo - Italy - Tel.: +39 (0) 35 395111 - Telex: 301627 ABBSAC I - Telefax: +39 (0) 35 395306-395433