Edit: Also, 1.3 figure 1: Should the y-axis label be "Inverse throughput" to match later figures?
And yeah, maybe I should just label all of then with throughout for consistency.
reply
Edit: Also, 1.3 figure 1: Should the y-axis label be "Inverse throughput" to match later figures?