RF OPTIMIZATION OF WCDMA NETWORK

ethio telecom
May 17,2012

Shared success

OUTLINE
Overview of UMTS Network deployment Optimization team organization and process Major Optimization Activities Challenges

Shared success

OVERVIEW OF UMTS NETWORK DEPLOYMENT

Shared success

The Network Topology


Full continuous coverage for the Capital Addis Ababa ( urban and dense urban coverage) With capacity of 300,000 subscribers Supports HSDPA, HSUPA and HSDPA+ high speed data services

Shared success

Network boundaries by vendor


There are 58 UMTS sites collocated with NOKIA GSM sites There are 135 UMTS sites collocated with ZTE GSM sites There were 50 UMTS sites for hot spots
NOKIA ZTE UMTS Before

Shared success

Dual frequency Distribution


There are 245 Node Bs to cover Addis Ababa There are 27 S222 Node Bs to cover dense urban area There are 218 S111 Node Bs to cover Addis Ababa

Shared success

OPTIMIZATION TEAM ORGANIZATION AND PROCESS

Shared success

Team Organization
RAN Manager
WCDMA OPTIMZATION TEAM

Planning TEAM

Optimization SUPERVISOR

Planning SUPERVISOR

STAFF-1

STAFF-2

STAFF-1

Detection TEAM

STAFF-1

Detection Supervisor
8

Shared success

Optimization Process
Engineering optimization SSV Test Maintenance Optimization Routine Optimization KPI monitoring

Phase-1 Cluster Optimization

Phase-2 Cluster Optimization

Shared success

MAJOR OPTIMIZATION ACTIVITIES

10

Shared success

Major Activities

Initial Optimization

Phase-2 Cluster Test

Phase-1 Cluster Test


SSV TEST routine Optimization OCT 2011 NOV 2011 DEC 2011 Follow KPI JAN 2012 FEB 2012 Compile the Engineering and Radio Parameters of the Network

11

Shared success

CHALLENGES

12

Shared success

Challenges
Engineering optimization
Site Audit not finished cause problem on physical tunings R99 Service checking was made based on manual computation Some site with lower HSUPA rate which was justified by poor radio condition Temporary interference RTWP value Modification

Layer Strategies

13

Shared success

Challenges
Routine optimization
IRAT Handover issues KPI definition issues R99/Support on F2 Frequency disturb the layer strategy