Pre Engineered Buildings
Pre Engineered Buildings
Pre Engineered Buildings
Eave strut Roof panel Roof purlin Rigid frame rafter Ridge line End wall Wall panel
Side wall Rigid frame column Downspout Gutter Ridge panel Cable bracing or rod bracing(at roof and wall)
MEZZANINE FLOOR
NORTH LIGHT
MONITOR TYPE
CANOPY
DETAILS of FITTINGS
PARTITION
MEZZANINE AT ENDWALL
TYPES OF PURLIN
These are the stages which are involved in the Pre-Engineered building
ADVANTAGES
1. Fast Project Construction: - Buildings are fabricated and delivered within a short period due to standardisation. - Fast erection because all members are field bolted. 2. Functional Versatility: - Modular construction. - Large clear Spans (up to 100m). - Long Bay Spacing (up to 13m). - Buildings are easily expandable on all sides (allowing for future expansion). 3. Architectural Flexibility: - Aesthetic features such as fascias, parapets and curved eaves greatly improve the appearance of the building. - Readily available interface details between steel and other materials (glazing, block wall, curtain wall, etc.). 4. Low Maintenance and Operating Costs: - Virtually no maintenance required for all panels. - Roof requires only periodic cleaning. - Annual washing of Eave Gutters. - Watertight roofs.
Possible Disadvantages
1. Relatively short life-span 2. Sometimes has an industrial or warehouse look to it 3. The foundation system is NOT designed by the manufacturer 4. On-site alteration in design cant be done.
Mall
Processing mills
Warehouses
Stadiums
Shipyards
Ridge Line
Foundation
Roof Panel
Conventional Building
Special aesthetic design required Increased design time due to scratch and availability of less design aids
Higher resistance to seismic forces due to low weight Rigid heavy weight structures not suitable for seismic flexible frames zones 30% less PEB steel structures weight through efficient use of steel Factory controlled quality High weight due to excessive safety factor and the usage of heavier steel sections Every project to be fabricated at site
Lower initial cost of peb steel buildings(cost per Special design and features developed for each square meter about 30% less than the conventional) project at higher costs and faster delivery Simple Foundation, easy to construct and light weight of PEB structures Average delivery time 6-8 weeks Extensive heavy foundation Average delivery time 22-28 weeks