INTRODUCTION
Pre-determined inventory of raw materials that can satisfy a
wide range of structural and aesthetic design requirements.
DESIGN SOFTWARE
Sheeting preparation
Miscellaneous trimmings
Fascia
Self weight Self weight
30% lighter More heavy
Primary Member is Primary members are
tapered section Hot rolled I section
Secondary members Secondary members are
are light weight rolled I or C section
framed Z and C which are heavy in
section weight.
Delivery average 6 to 8 Delivery- average 20 to
weeks 26 weeks
Foundation-simple design, Foundation- expensive,
easy to construct & light heavy foundation
wt. required.
Erection cost and time- Erection cost and time-
accurately known 20% more than PEB
Overall price - Higher
Overall price -30%lower
price per square meter.
Architecture-achieved at
Architecture- achieved at
low cost
higher cost
Erection process is easy,
Erection process is slow
fast, step by step
and extensive field labor
is required.
PRE ENGINEERED BUILDING vs
CONCRETE BUILDINGS
APPLICATIONS
Industrial Buildings
Warehouses
Commercial Complexes
Showrooms
Offices
Schools
Indoor Stadiums
Outdoor Stadiums with canopies
Gas Stations
Metro Stations, Bus Terminals, Parking Lots
Primary Health Centers, Angan wadis
And many more