HYDRAULIC PRESSURE TEST PROCEDURE FOR PRS CHEMICAL CUTTER PARTS ABOVE THE CHEMICAL CYLINDER
THE PURPOSE OF THE TEST IS TO ENSURE THAT ALL PARTS ABOVE THE CHEMICAL CYLINDER (FIRING SUB ADAPTER, GAS GENERATOR SUB, PRESSURE RELIEF ASSY, ADJ. TOP CENTRALIZER & ANCHOR ASSY) ARE: 1. CORRECTLY ASSEMBLED 2. THE O-RING SEALS ARE NOT LEAKING 3. THE ANCHOR SLIPS ARE OPENING TO THE CORRECT INTERNAL DIAMETER AND RETRACTING PROPERLY IMPORTANT REMINDERS WARNING: NO HAZARDOUS MATERIAL (IGNITER AND/OR GAS GENERATOR GRAIN) SHOULD BE PRESENT IN THE TOOL DURING THIS PROCEDURE!!! ALWAYS ASSEMBLE THE RIGHT SIZE SECTION OF PIPE (REFER TO SELECTION GUIDE IN CHC REVIEW FOR REFERENCE ON PIPE SIZES) OVER THE ANCHOR ASSY WHEN PRESSURE TESTING
FIGURE 1
2) PRESSURE TEST PLUG (SOLID) FOR LOWER ANCHOR BODY (SEE FIGURE 2): A) FOR LOWER ANCHOR BODY 222072-000, USE TEST PLUG 222053-000 B) FOR LOWER ANCHOR BODY 227221-000, USE TEST PLUG 227213-000 C) FOR LOWER ANCHOR BODY238072-000, USE TEST PLUG 240053-000
FIGURE 2
3) CHC UPPER ASSY (FIRING SUB ADAPTER, GAS GENERATOR SUB, PRESSURE RELIEF ASSY, ADJ. TOP CENTRALIZER, ANCHOR ASSY) 4) TEST SLEEVE WITH SET SCREWS ON BOTH ENDS TO BE SECURED OVER THE ANCHOR ASSY (SEE FIGURE 3).
FIGURE 3
FIGURE 4
FIGURE 5 5. SCREW PRESSURE TEST SUB 227214-000 INTO THE FIRING SUB ADAPTER AND THE TOOL IS NOW READY FOR TESTING
MAINTENANCE:
DISASSEMBLE THE CUTTER PARTS AND DEGREASE TO REMOVE OIL AND/OR WATER RESIDUE. IF THE PARTS ARE NOT IMMEDIATELY NEEDED FOR A JOB, APPLY ANTI CORROSION LUBRICANT TO KEEP RUST AWAY. IF THEY ARE NEEDED FOR A JOB, THEN PROCEED WITH THE ASSEMBLY AFTER DEGREASING AS REQUIRED.
NOTE:
IF YOU PRESSURE TEST WITH NITROGEN (N2), THE SAME PROCEDURE MAY BE APPLIED