Ebsm Upgrading Project Daily Report: 089 1 April 2013

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

EBSM UPGRADING PROJECT DAILY REPORT

TO CC.
1.00 2.00

Report No : Date :

2013/ENS/TET/D-089 1 April 2013 31 March 2013 8.00-17.00


21.00 22.00 23.00

Rev. 2

K. Surachead P. Worachart P. , Preecha K., Chotepong S., Aphichart S., K. Kawin T., Krisada B., Leartsak Ch., Deaunphen R.
WEATHER CONDITION 3.00 4.00 5.00 6.00 7.00 8.00 S 9.00 S 10.00 S Symbols Yesterday = 11.00 S 12.00 S 13.00 S Cloudy (C), 14.00 S 15.00 S 16.00 S 17.00 S 18.00

Working Date Working Time


19.00 20.00

24.00

Sunshine (S),

Rainy (R) Today

MANPOWER REPORT Normal Time man hours Over Time man hours Normal Time man hours Over Time man hours

No.

Description

Total M/D

Total MH

No.

Description

Total M/D

Total MH

ENSURE INTERNATIONAL CO., LTD. A 1 2 3 4 5 6 7 8 9 10 11 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Foreman Welder Fitter Pipe Fitter Structure Helper Driver Scaffolder Fire wach man Insulation Safety Technic Qc Inspector Carpenter Mason Electrician Total A+B No. 1 2 3 No. 1 Griding M/C 4" Griding M/C 7" Activities (Yesterday) Fabrication Pipe 24",28" 304H Area Shop Description Welding M/C 300 Amp. Unit ea ea ea Unit DB Q'ty 4 12 9 Q'ty 28 No. 4 5 6 No. 1 2 3 4 5 6 7 8 Drill Generator Haib 5 T CONSTRUCTION ACTIVITIES Activities (Today) Install Steel Structure Trim Cooler Area 03A Unit Set Set Set Set Set Set Set DB Q'ty 1 13 26 1 1 1 1 28 No. 1 2 3 4 5 6 7 8 Activities (Tomorrow) Install Steel Structure Trim Cooler Area 03A Unit Set Set Set Set Set Set Set DB Q'ty 1 13 26 1 1 1 1 28 1 1 1 1 1 9 Project Manager Site Manager Site Engineer Safety Office QA/QC Manager Draftman Material Control Administrator Storekeeper Document Control Supervisor Direct 1 8 72 8 8 8 8 8 1 9 1 1 1 1 1 19 8 72 8 8 8 8 8 152 Description 1 1 1 1 Indirect 8 8 8 8 1 1 1 1 8 8 8 8 A 1 2 3 4 5 6 7 8 9 10 11 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Foreman Welder Fitter Pipe Fitter Structure Helper Driver Scaffolder Fire wach man Insulation Safety Technic Qc Inspector Carpenter Mason Electrician Total A+B Unit ea ea ea Q'ty 3 3 No. 7 8 9 Crane 55T. Crane 70T. Trailer Description Project Manager Site Manager Site Engineer Safety Office QA/QC Manager Draftman Material Control Administrator Storekeeper Document Control Supervisor Direct 6 3 17 10 8 2 9 4 4 4 3 6 5 1 48 24 136 80 64 16 72 32 32 32 24 48 40 8 6 3 17 10 8 2 9 4 4 4 3 6 5 1 100 Unit ea ea ea 48 24 136 80 64 16 72 32 32 32 24 48 40 8 800 Q'ty 2 1 2 4 Indirect 1 2 3 1 1 1 8 16 24 8 8 8 16 8 16 32 1 2 3 1 1 1 2 1 2 4 8 16 24 8 8 8 16 8 16 32

EQUIPMENT AND MACHINERY REPORT

Install Steel Structur Cooling water Pipe Support 03A Install Formwork Foundation Cooling Water 03A Remove sand Bag From Gutter Install Steel Structure Reactor 03R003 Installation Insulation For 02E007A Installation Insulation For 05T009 Fabrication Pipe 24",28" 304H 03B 03B 02 05 Shop

Install Steel Structur Cooling water Pipe Support 03A Install Formwork Foundation Cooling Water 03A Remove sand Bag From Gutter Install Steel Structure Reactor 03R003 Installation Insulation For 02E007A Installation Insulation For 05T009 Fabrication Pipe 24",28" 304H 03B 03B 02 05 Shop

ENSURE INTERNATIONAL CO., LTD. (Sub-contractor)


Prepared By : ... ( ........) Date : . / . / Note : The sub-contractors have to sumit this report to TET before 9.00 am every working day.

TECHNIP ENG. (THAILAND) CO., LTD. (Contractor)


Checked By : ... ( Surachead....Pudjareon....) Date : . / . /

IRPC PUBLIC CO., LTD. (Owner)


Approved By : ... ( ........) Date : . / . /

Page 1 of 1