Ebsm Upgrading Project Daily Report: 089 1 April 2013
Ebsm Upgrading Project Daily Report: 089 1 April 2013
Ebsm Upgrading Project Daily Report: 089 1 April 2013
TO CC.
1.00 2.00
Report No : Date :
Rev. 2
K. Surachead P. Worachart P. , Preecha K., Chotepong S., Aphichart S., K. Kawin T., Krisada B., Leartsak Ch., Deaunphen R.
WEATHER CONDITION 3.00 4.00 5.00 6.00 7.00 8.00 S 9.00 S 10.00 S Symbols Yesterday = 11.00 S 12.00 S 13.00 S Cloudy (C), 14.00 S 15.00 S 16.00 S 17.00 S 18.00
24.00
Sunshine (S),
MANPOWER REPORT Normal Time man hours Over Time man hours Normal Time man hours Over Time man hours
No.
Description
Total M/D
Total MH
No.
Description
Total M/D
Total MH
ENSURE INTERNATIONAL CO., LTD. A 1 2 3 4 5 6 7 8 9 10 11 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Foreman Welder Fitter Pipe Fitter Structure Helper Driver Scaffolder Fire wach man Insulation Safety Technic Qc Inspector Carpenter Mason Electrician Total A+B No. 1 2 3 No. 1 Griding M/C 4" Griding M/C 7" Activities (Yesterday) Fabrication Pipe 24",28" 304H Area Shop Description Welding M/C 300 Amp. Unit ea ea ea Unit DB Q'ty 4 12 9 Q'ty 28 No. 4 5 6 No. 1 2 3 4 5 6 7 8 Drill Generator Haib 5 T CONSTRUCTION ACTIVITIES Activities (Today) Install Steel Structure Trim Cooler Area 03A Unit Set Set Set Set Set Set Set DB Q'ty 1 13 26 1 1 1 1 28 No. 1 2 3 4 5 6 7 8 Activities (Tomorrow) Install Steel Structure Trim Cooler Area 03A Unit Set Set Set Set Set Set Set DB Q'ty 1 13 26 1 1 1 1 28 1 1 1 1 1 9 Project Manager Site Manager Site Engineer Safety Office QA/QC Manager Draftman Material Control Administrator Storekeeper Document Control Supervisor Direct 1 8 72 8 8 8 8 8 1 9 1 1 1 1 1 19 8 72 8 8 8 8 8 152 Description 1 1 1 1 Indirect 8 8 8 8 1 1 1 1 8 8 8 8 A 1 2 3 4 5 6 7 8 9 10 11 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Foreman Welder Fitter Pipe Fitter Structure Helper Driver Scaffolder Fire wach man Insulation Safety Technic Qc Inspector Carpenter Mason Electrician Total A+B Unit ea ea ea Q'ty 3 3 No. 7 8 9 Crane 55T. Crane 70T. Trailer Description Project Manager Site Manager Site Engineer Safety Office QA/QC Manager Draftman Material Control Administrator Storekeeper Document Control Supervisor Direct 6 3 17 10 8 2 9 4 4 4 3 6 5 1 48 24 136 80 64 16 72 32 32 32 24 48 40 8 6 3 17 10 8 2 9 4 4 4 3 6 5 1 100 Unit ea ea ea 48 24 136 80 64 16 72 32 32 32 24 48 40 8 800 Q'ty 2 1 2 4 Indirect 1 2 3 1 1 1 8 16 24 8 8 8 16 8 16 32 1 2 3 1 1 1 2 1 2 4 8 16 24 8 8 8 16 8 16 32
Install Steel Structur Cooling water Pipe Support 03A Install Formwork Foundation Cooling Water 03A Remove sand Bag From Gutter Install Steel Structure Reactor 03R003 Installation Insulation For 02E007A Installation Insulation For 05T009 Fabrication Pipe 24",28" 304H 03B 03B 02 05 Shop
Install Steel Structur Cooling water Pipe Support 03A Install Formwork Foundation Cooling Water 03A Remove sand Bag From Gutter Install Steel Structure Reactor 03R003 Installation Insulation For 02E007A Installation Insulation For 05T009 Fabrication Pipe 24",28" 304H 03B 03B 02 05 Shop