EBSM UPGRADING PROJECT DAILY REPORT

TO CC.
1.00 2.00

Report No : Date :

2013/ENS/TET/D-156 7 June 2013 6 June 2013 08.00-22.00


21.00 C 22.00 C 23.00

Rev. 2

K. Surachead P. Worachart P. , Preecha K., Chotepong S., Aphichart S., K. Kawin T., Krisada B., Leartsak Ch., Deaunphen R.
WEATHER CONDITION 3.00 4.00 5.00 6.00 7.00 8.00 S 9.00 S 10.00 S Symbols Yesterday = 11.00 S 12.00 C 13.00 C Cloudy (C), 14.00 C 15.00 C 16.00 C 17.00 C 18.00 C

Working Date Working Time


19.00 C 20.00 C

24.00

Sunshine (S),

Rainy (R) Today

MANPOWER REPORT Normal Time man hours Over Time man hours Normal Time man hours Over Time man hours

No.

Description

Total M/D

Total MH

No.

Description

Total M/D

Total MH

ENSURE INTERNATIONAL CO., LTD. A 1 2 3 4 5 6 7 8 9 10 11 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Foreman Welder Fitter Pipe Fitter Structure Helper Driver Scaffolder Fire wach man Insulation Safety Technic Qc Inspector Carpenter Mason Electrician Total A+B No. 1 2 3 No. 1 2 3 4 5 6 7 8 9 10 11 12 Grinding M/C 4" Grinding M/C 7" Activities (Yesterday) Fit-up and welding Hopper Reactor Area Shop Description Welding M/C 300 Amp. Unit ea ea ea Unit Set Set Set Set Set Set Set Set Set Set Set Set Q'ty 8 16 12 Q'ty 1 1 1 1 1 1 1 2 1 1 24 4 No. 4 5 6 No. 1 2 3 4 5 6 7 8 9 10 11 12 13 Drill Generator Haib 5 T CONSTRUCTION ACTIVITIES Activities (Today) Fit-up and welding Hopper Reactor Area Shop Unit Set Set Set Set Set Set Set Set Set Set Set Set Set Q'ty 1 1 1 1 1 1 1 2 1 1 24 2 4 No. 1 2 3 4 5 6 7 8 9 10 11 12 13 Activities (Tomorrow) Fit-up and welding Hopper Reactor Area Shop Unit Set Set Set Set Set Set Set Set Set Set Set Set Set Q'ty 1 1 1 1 1 1 1 2 1 1 24 2 4 Project Manager Site Manager Site Engineer Safety Office QA/QC Manager Draftman Material Control Administrator Storekeeper Document Control Supervisor Direct 9 13 36 22 8 2 6 5 5 1 3 7 3 3 72 104 288 176 64 16 48 40 40 8 24 56 24 24 1 1 1 7 27 5 5 5 9 13 36 22 8 2 6 5 5 1 3 7 3 3 141 72 104 288 203 64 21 48 45 40 8 24 56 24 29 1,183 Description 1 3 2 4 Indirect 1 1 4 1 1 8 8 32 8 8 8 24 16 32 1 1 1 5 3 5 1 1 4 1 1 1 3 2 4 8 8 32 13 8 11 24 16 37 A 1 2 3 4 5 6 7 8 9 10 11 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Foreman Welder Fitter Pipe Fitter Structure Helper Driver Scaffolder Fire wach man Insulation Safety Technic Qc Inspector Carpenter Mason Electrician Total A+B Unit ea ea ea Q'ty 4 4 1 No. 7 8 9 Crane 100T. Crane 50T. Trailer Description Project Manager Site Manager Site Engineer Safety Office QA/QC Manager Draftman Material Control Administrator Storekeeper Document Control Supervisor Direct 9 14 36 22 9 3 6 4 9 3 3 7 4 3 72 112 288 176 72 24 48 32 72 24 24 56 32 24 9 14 36 22 9 3 6 4 9 3 3 7 4 3 151 Unit ea ea ea 72 112 288 176 72 24 48 32 72 24 24 56 32 24 1,208 Q'ty 2 3 2 4 Indirect 1 1 4 1 1 8 8 32 8 8 16 24 16 32 1 1 4 1 1 2 3 2 4 8 8 32 8 8 16 24 16 32

EQUIPMENT AND MACHINERY REPORT

Fit-Up & Welding Pipe 66" 304H For Hydrotest Shop Fit-Up & Welding Pipe 28" 800HT For Hydrotest Shop Cutting Mix Sump Reactor Cutting Elbow Pipe 66" 55 Welding Plug Handrail For Trim Cooler Welding Plug Handrail For Reactor Remove Pump 03P005A/B Installation Pump For 03P030A Chipping Fireproof Reactor 03R001 Loot Bolt Reactor 03R001 Chipping Box Out For Install Damper Shop Shop Shop Shop 03A 03B 03B 03B OSBL

Fit-Up & Welding Pipe 66" 304H For Hydrotest Shop Fit-Up & Welding Pipe 28" 800HT For Hydrotest Shop Cutting Mix Sump Reactor Cutting Elbow Pipe 66" 55 Welding Plug Handrail For Trim Cooler Welding Plug Handrail For Reactor Remove Pump 03P005A/B Installation Pump For 03P030A Chipping Fireproof Reactor 03R001 Levering Pump For 05P015A/B Chipping Box Out For Install Damper Shop Shop Shop Shop 03A 03B 03B 05 OSBL

Fit-Up & Welding Pipe 66" 304H For Hydrotest Shop Fit-Up & Welding Pipe 28" 800HT For Hydrotest Shop Cutting Mix Sump Reactor Cutting Elbow Pipe 66" 55 Welding Plug Handrail For Reactor Remove Pump 03P005A/B Installation Pump For 03P030A Chipping Fireproof Reactor 03R001 Levering Pump For 05P015A/B Chipping Box Out For Install Damper Shop Shop Shop 03A 03B 03B 05 OSBL

Welding Plug Handrail For Trim Cooler Shop

Grinding Square Washer Bolt Reactor 03R001 03B

Grinding Scaw Washer Bolt Reactor 03R001 03B

ENSURE INTERNATIONAL CO., LTD. (Sub-contractor)


Prepared By : ... ( ........) Date : . / . / Note : The sub-contractors have to sumit this report to TET before 9.00 am every working day.

TECHNIP ENG. (THAILAND) CO., LTD. (Contractor)


Checked By : ... ( Surachead....Pudjareon....) Date : . / . /