Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
0% found this document useful (0 votes)
26 views2 pages

Restrueturing and Deregulation (Course 2008) (Total No. of Questions:12) (Total No. Printed Pages: 2)

Download as pdf or txt
Download as pdf or txt
Download as pdf or txt
You are on page 1/ 2

UNIVERSITY OF PUNE [4364]-528 B. E. ( Electrical) Examination - 2013 RESTRUETURING AND DEREGULATION (Course 2008) [Total No.

of Questions:12] [Total No. Printed Pages: 2] [Time : 3 Hours] [Max. Marks : 100] Instructions : 1) Answer any three questions from each I and three questions from section II 2) Answer not more than 3 questions of which at least questions must be from each section 3) Answers to the two sections should be written in separate answer-books. 4) Neat diagrams must be drawn wherever necessary. 5) Black figures to the right indicate full marks. 6) Use of logarithmic tables, slide rule, Mollier charts, electronic pocket calculator and steam tables is allowed. 7) Assume suitable data, if necessary. SECTION I Q.1 a) Explain in detail the functions of i) CEA ii) PFC b) Why the reformation has taken place in electrical power system OR a) What are various challenges before Indian Power Sector b) Explain the operation of Indian Energy Exchange Q.3 a) Write short notes i) Capital Cost ii) Debt and Equity iii) Depreciation b) Explain Average, Marginal and Avoided Costs. OR
1

[12]

[6]

Q.2

[9] [9] [8]

[8]

Q.4

a) Explain the tariff-Setting principle b) What do you mean by i) Subsidy & cross subsidy ii) O and M expenses.

[8] [8]

Q.5

a) What is role of regulation? b) What are the regulation externalities. OR

[8] [8]

Q.6

a) Write short note on i) CERC ii) Regulatory Process in India b) Give the structure of regulatory process in India SECTION II

[10]

[6]

Q.7

a) Explain Pool Model based on contractual arrangement. b) Explain wholesale competition & retail competition model based on industry structure. OR

[8] [10]

Q.8

a) Explain various ownership models. b) Explain electricity reforms in Nordic pool & uk

[9] [9] [8] [8] [8] [8] [8] [8]

Q.9

a) Explain various methods of transmission pricing. b) Explain power exchange in India OR a) Explain in detail wheeling trading model b) Compare integrated trading model and de centralized trading model

Q.10

Q.11

a) Explain the working of ISO b) Explain and compare TRANSO and ISO OR

Q.12

a) Explain the congestion issues & management

[8]

You might also like