The document lists 65 concentrated solar power projects with details like name, country, technology, status, solar resource, thermal storage, turbine capacity and more. The projects are located in countries like the US, Spain, Morocco, Algeria and the UAE and use parabolic trough or power tower technology. They range in status from under construction to operational.

Uploaded by

aashygang
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
153 views

CSP Projects List

The document lists 65 concentrated solar power projects with details like name, country, technology, status, solar resource, thermal storage, turbine capacity and more. The projects are located in countries like the US, Spain, Morocco, Algeria and the UAE and use parabolic trough or power tower technology. They range in status from under construction to operational.

Uploaded by

aashygang
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 20

CSP PROJECTS LIST

S No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 PROJECT NAME Abengoa Mojave Solar Project Alvarado 1 Andasol 1 Andasol 2 Andasol 3 Andasol 4 Archimede Arcosol 50 Central Solar Termoelectrica La Florida Colorado Integrated Solar Project EL REBOSO II 50-MW Solar Thermal Power Plant EL REBOSO III 50-MW Solar Thermal Power Plant Extresol-1 Extresol-2 Extresol-3 Genesis Solar Energy Project Helios I (Helios I) Helios II (Helios II) Holaniku at Keahole Point Ibersol Ciudad Real (Puertollano) ISCC Argelia (ISCCS Al Kuraymat) ISCC Morocco (ISCC Morocco) ISCCS Al Kuraymat (ISCC Argelia) La Dehesa Lebrija 1 (LE-1) Majadas I Manchasol-1 (MS-1) Manchasol-2 (MS-2) Martin Next Generation Solar Energy Center (MNGSEC) Nevada Solar One (NSO) NextEra Beacon Solar Energy Project (Beacon) Palen Solar Power Project Palma del Ro I Palma del Ro II Palmdale Hybrid Power Plant (PHPP) Saguaro Power Plant Shams 1 (Shams 1) Solana Generating Station (Solana) Solar Electric Generating Station I (SEGS I) Solar Electric Generating Station II (SEGS II) Solar Electric Generating Station III (SEGS III) Solar Electric Generating Station IV (SEGS IV) Solar Electric Generating Station V (SEGS V) Solar Electric Generating Station VI (SEGS VI) Solar Electric Generating Station VII (SEGS VII) Solar Electric Generating Station VIII (SEGS VIII) Solar Electric Generating Station IX (SEGS IX) Solnova 1 Solnova 3 Solnova 4 UA Tech Park Thermal Storage Demonstration Project Vallesol 50 Victorville 2 Hybrid Power Plant BrightSource Coyote Springs 1 (PG&E 3) (Coyote Springs 1) BrightSource Coyote Springs 2 (PG&E 4) (Coyote Springs 2) BrightSource PG&E 5 BrightSource PG&E 6 BrightSource PG&E 7 Crescent Dunes Solar Energy Project (Tonopah) Gaskell Sun Tower (Gaskell) Gemasolar Thermosolar Plant (Gemasolar) Ivanpah Solar Electric Generating Station (ISEGS) Planta Solar 10 (PS10) Planta Solar 20 (PS20) Rice Solar Energy Project (RSEP) Sierra SunTower (Sierra) Country US Spain Spain Spain Spain Spain Italy Spain Spain US Spain Spain Spain Spain Spain US Spain Spain US Spain Morroco Egypt Algeria Spain Spain Spain Spain Spain US US US US Spain Spain US US UAE US US US US US US US US US US Spain Spain Spain US Spain US US US US US US US US US US Spain Spain US US TECHNOLOGY Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Power tower Power tower Power tower Power tower Power tower Power tower Power tower Power tower Power tower Power tower Power tower Power tower Power tower STATUS Under construction Operational Operational Operational Under construction Under construction Operational Under construction Operational Operational Under construction Under Ccontract Operational Operational Under construction Under construction Under construction Under construction Operational Operational Operational Under construction Operational Operational Under construction Operational Operational Under construction Operational Operational Under development Under development Under construction Operational Under development Operational Under development Under development Operational Operational Operational Operational Operational Operational Operational Operational Operational Operational Operational Operational Under development Under construction Under development Under development Under development Under development Under development Under development Under development Under development Operational Under construction Operational Operational Under development Operational STATUS ON 20-Oct-11 3-Dec-11 20-Jan-10 20-Jan-11 7-Jan-11 23-Nov-10 20-Jun-11 3-Dec-10 3-Dec-10 13-May-11 27-Aug-07 27-Aug-09 20-Jan-11 13-May-11 28-Apr-11 7-Apr-11 1-Jul-11 1-Jul-11 3-Dec-11 3-Dec-11 25-Oct-11 20-Aug-10 20-Aug-10 30-Mar-11 14-Apr-09 21-Jan-11 30-Mar-11 4-May-09 4-Feb-11 7-Sep-11 21-Jan-11 3-Dec-10 21-Jan-11 21-Jan-11 20-Oct-11 1-May-09 20-Aug-10 3-Dec-10 22-May-09 22-May-09 22-May-09 22-May-09 22-May-09 22-May-09 22-May-09 22-May-09 22-May-09 3-Dec-10 3-Dec-10 3-Dec-10 20-Oct-11 3-Dec-10 20-Oct-11 21-Jan-11 21-Jan-11 21-Jan-11 21-Jan-11 21-Jan-11 20-Jan-11 21-Jan-11 24-Oct-11 25-Jul-11 21-Apr-09 21-Apr-09 14-Dec-11 13-Jun-11 Solar Resource kWh/m2/yr) 2174 2136 2136 2200 2136 1936 2097 Solar-Field Aperture Area (m2) Efficiency Gross (%) LAND AREA (Hect) 714.27 135 200 200 200 200 8 230 200 2.42 160 242 200 201 200 260 261 2 2061 287760 183860 180000 131000 552750 412020 510120 510120 357200 1450000 2291 2291 2636 100000 7.5 2 2725 2725 2725 2725 2725 2725 2725 2725 2725 2012 2012 2012 2097 82960 190338 230300 230300 250500 188000 194280 464340 483960 300000 300000 300000 510120 150 1-Dec-09 1-Jun-09 1-May-11 30-Dec-12 1-Jul-11 Feb-11 May-10 Oct-10 Jan-11 May-10 10-Dec-10 Jun-07 2014 1-Jan-14 2011 Dec-10 2013 Jan-06 1-Jan-12 1-Jan-13 20-Dec-84 1985 31-Dec-85 1-Feb-89 1-Feb-89 1-Feb-89 1-Feb-89 1-Dec-89 1-Oct-90 1-Jan-09 1-Jan-09 1-Jan-09 1-Dec-12 1-Jan-20 2013 Jul-14 Jul-15 Jul-16 Dec-16 Jul-16 Oct-13 Apr-12 Apr-11 1-Oct-13 25-Jul-07 Apr-09 1-Oct-13 1-Jul-09 391 393 393 393 C 395 C 393 C 393 C 393 C 393 C START SOLAR FIELD PRODUCTION OUTLET TEMP. 1-Jan-13 1-Jun-09 26-Nov-08 1-Jun-09 1-Jun-11 1-Jan-20 14-Jul-10 1-Jan-20 1-Jun-10 2010 Oct-11 Nov-12 1-Jan-10 12-Nov-10 8-May-11 1-Jan-14 740 F 393 C 393 C 393 C 393 C 550 C 393 C 393 C 393 C 393 C 393 C 393 393 740 TURBINE CAPACITY 250 MW (2*125) 50 MW 50 MW 50 MW 50 MW 50 MW 5 MW 49.9 MW 49.9 MW 2 MW 50 MW 50 MW 50 MW 49.9 MW 49.9 MW 250 MW 49.9 MW 49.9 MW 2 MW 50 MW 470 MW 140 MW 25 MW 49.9 MW 49.9 MW 50 MW 49.9 MW 49.9 MW 75 MW 75 MW 250 MW 500 MW (2*250) 50 MW 50 MW 50 MW 1.16 MW 100 MW 280 MW (2*140) 13.8 MW 30 MW 30 MW 30 MW 30 MW 30 MW 30 MW 89 MW 89 MW 50 MW 50 MW 50 MW 5 MW 49.9 Mw 50 MW 200 200 200 200 200 110 245 19.9 392 11.02 20 150 5
MANUFACTURER

THERMAL STORAGE 0

Nos of SCAs 768 624 624 640 624 54 624 672 8 384 624 624 624 624

SCA Mfg.

MIRRORS Mfg.

SCE Mfg.

510120 510120 510120 31860 552750 6664 319057 518469 510120 510120 510120

16 16 15.6 13.81 17 17 16 16 16

Siemens Siemens Siemens Tosi

7.5 Hour 7.5 Hour 7.5 Hour 7.5 Hour 8 Hour 7.5 Hour 7.5 Hour

Acciona Solar Power SKEL-ET SKEL-ET Senertrough Comes(ENEA) SAMCA-trough SKALET 150 SKALET 150 Senertrough Senertrough Senertrough

Flabeg Flabeg

SCHOTT SCHOTT

Flabeg Solel (UVAC 2008) Ronda Reflex Archimede Solar Energy Rioglass Flabeg Flabeg Flabeg Flabeg Flabeg Schott

2200 3622 2168 2168 2168 2217 2217

Siemens
Siemens

116 MWh 7.5 Hour


7.5 hour 7.5 hour

Siemens Siemens Siemens Siemens

SCHOTT Solel (UVAC 2008) Solel (UVAC 2008) SCHOTT SCHOTT

352 224 224 672 756 792 624 624 760

Iberdrola

Flabeg Rioglass Rioglass Rioglass Solel Flabeg Flabeg Flabeg

SCHOTT SCHOTT SCHOTT SCHOTT Solel SCHOTT SCHOTT Schott

13.81

1993 2142 2208 2208 2606

16 16

200 188 135 200 200 500 161.87 814.22 558.46 135 135 152.56 6.47 768.9

Siemens

7.5 Hour

Siemens Siemens

7.5 Hour 7.5 Hour 0.5 Hour

SAMCA-trough Solel Acciona Solar Power Senertrough Senertrough Acciona Solar Power

393 C 393 C 572 F 371 C 307 C 316 C 349 C 349 C 349 C 390 C 390 C 390 C 390 C 393 C 393 C 393 C 393 C

792 792 Ormat 6 Hour 24 768

Acciona Solar Power Acciona Solar Power Starnet Flabeg SCHOTT

115 115 115 80.93 230

360 360 360 7.5 Hour 624

Luz Luz Luz Luz Luz Luz Luz Luz Luz Astro Astro Astro

Rioglass Rioglass Rioglass

Solel UVAC Solel UVAC Solel UVAC Solel UVAC Solel UVAC Solel UVAC Solel UVAC Schott Schott Schott

2685 2172 2717 2012 2012 2598 2629

1071361 304750 2295960 75000 150000 1071361 27670

647.49 445.15 195 1416.39 55 80 570.6

1050 F 565 C 1050 F 250-300 C 250-300 C 1050 F 440 *

15 Hour 1 Hour 1 Hour

Remarks

himede Solar Energy

water as HTF water as HTF water as HTF water as HTF

S No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47

PROJECT NAME
Abengoa Mojave Solar Project Alvarado I Andasol-1 (AS-1) Andasol-2 (AS-2) Andasol-3 (AS-3) Andasol-4 (AS-4) Archimede Arcosol 50 (Valle 1) Central Solar Termoelectrica La Florida (La Florida) Colorado Integrated Solar Project (Cameo) EL REBOSO II 50-MW Solar Thermal Power Plant (El Reboso II ) EL REBOSO III 50-MW Solar Thermal Power Plant (El Reboso III) Extresol-1 (EX-1) Extresol-2 (EX-2) Extresol-3 (EX-3) Genesis Solar Energy Project Helios I (Helios I) Helios II (Helios II) Holaniku at Keahole Point Ibersol Ciudad Real (Puertollano) ISCC Argelia (ISCC Argelia) ISCC Morocco (ISCC Morocco) ISCCS Al Kuraymat (ISCCS Al Kuraymat) La Dehesa Lebrija 1 (LE-1) Majadas I Manchasol-1 (MS-1) Manchasol-2 (MS-2) Martin Next Generation Solar Energy Center (MNGSEC) Nevada Solar One (NSO) NextEra Beacon Solar Energy Project (Beacon) Palen Solar Power Project Palma del Ro I Palma del Ro II Palmdale Hybrid Power Plant (PHPP) Saguaro Power Plant Shams 1 (Shams 1) Solana Generating Station (Solana) Solar Electric Generating Station I (SEGS I) Solar Electric Generating Station II (SEGS II) Solar Electric Generating Station III (SEGS III) Solar Electric Generating Station IV (SEGS IV) Solar Electric Generating Station V (SEGS V) Solar Electric Generating Station VI (SEGS VI) Solar Electric Generating Station VII (SEGS VII) Solar Electric Generating Station VIII (SEGS VIII) Solar Electric Generating Station IX (SEGS IX)

Country US Spain Spain Spain Spain Spain Italy Spain Spain US Spain Spain Spain Spain Spain US Spain Spain US Spain Morroco Egypt Algeria Spain Spain Spain Spain Spain US US US US Spain Spain US US UAE US US US US US US US US US US

48 49 50 51 52 53

Solnova 1 Solnova 3 Solnova 4 UA Tech Park Thermal Storage Demonstration Project (UA Tech Park) Vallesol 50 (Valle 2) Victorville 2 Hybrid Power Plant

Spain Spain Spain US Spain US

TECHNOLOGY Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough

STATUS Under construction Operational Operational Operational Under construction Under construction Operational Under construction Operational Operational Under construction Under Ccontract Operational Operational Under construction Under construction Under construction Under construction Operational Operational Operational Under construction Operational Operational Under construction Operational Operational Under construction Operational Operational Under development Under development Under construction Operational Under development Operational Under development Under development Operational Operational Operational Operational Operational Operational Operational Operational Operational

STATUS ON 20-Oct-11 3-Dec-11 20-Jan-10 20-Jan-11 7-Jan-11 23-Nov-10 20-Jun-11 3-Dec-10 3-Dec-10 13-May-11 27-Aug-07 27-Aug-09 20-Jan-11 13-May-11 28-Apr-11 7-Apr-11 1-Jul-11 1-Jul-11 3-Dec-11 3-Dec-11 25-Oct-11 20-Aug-10 20-Aug-10 30-Mar-11 14-Apr-09 21-Jan-11 30-Mar-11 4-May-09 4-Feb-11 7-Sep-11 21-Jan-11 3-Dec-10 21-Jan-11 21-Jan-11 20-Oct-11 1-May-09 20-Aug-10 3-Dec-10 22-May-09 22-May-09 22-May-09 22-May-09 22-May-09 22-May-09 22-May-09 22-May-09 22-May-09

Solar-Field Aperture Area (m2)

Efficiency Gross (%)

510120 510120 510120 31860 552750 6664 319057 518469 510120 510120 510120

16 16 15.6 13.81 17 17 16 16 16

2 287760 183860 180000 131000 552750 412020 510120 510120 357200 1450000

13.81

16 16

100000

7.5 2

82960 190338 230300 230300 250500 188000 194280 464340 483960

Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough

Operational Operational Operational Under development Under construction Under development

3-Dec-10 3-Dec-10 3-Dec-10 20-Oct-11 3-Dec-10 20-Oct-11

300000 300000 300000 510120

LAND AREA 714.27 135 200 200 200 200 8 230 200 2.42 160 242 200 201 200 260 261 150

LAND AREA 1765 acres 135 Hect 200 Hect 200 Hect 200 Hect 200 Hect 8 Hect 230 Hect 200 Hect 6 acres 160 Hect 242 Hect 200 Hect 201 Hect 200 Hect 260 Hect 261 Hect 150 Hect

START PRODUCTION 1-Jan-13 1-Jun-09 26-Nov-08 1-Jun-09 1-Jun-11 1-Jan-20 14-Jul-10 1-Jan-20 1-Jun-10 2010 Oct-11 Nov-12 1-Jan-10 12-Nov-10 8-May-11 1-Jan-14

SOLAR FIELD OUTLET TEMP. 740 F 393 C 393 C 393 C 393 C 550 C 393 C 393 C 393 C 393 C 393 C 393 393 740

TURBINE CAPACITY 250 MW (2*125) 50 MW 50 MW 50 MW 50 MW 50 MW 5 MW 49.9 MW 49.9 MW 2 MW 50 MW 50 MW 50 MW 49.9 MW 49.9 MW 250 MW 49.9 MW 49.9 MW 2 MW 50 MW 470 MW 140 MW 25 MW 49.9 MW 49.9 MW 50 MW 49.9 MW 49.9 MW 75 MW 75 MW 250 MW 500 MW (2*250) 50 MW 50 MW 50 MW 1.16 MW 100 MW 280 MW (2*140) 13.8 MW 30 MW 30 MW 30 MW 30 MW 30 MW 30 MW 89 MW 89 MW

200 188 135 200 200 500 161.87 814.22 558.46 135 135 152.56 6.47 768.9

200 Hect 188 Hect 135 Hect 200 Hect 200 Hect 500 acres 400 acres 2012 acres 1380 acres 135 Hect 135 Hect 377 acres 16 acres 1900 acres

1-Dec-09 1-Jun-09 1-May-11 30-Dec-12 1-Jul-11 Feb-11 May-10 Oct-10 Jan-11 May-10 10-Dec-10 Jun-07 2014 1-Jan-14 2011 Dec-10 2013 Jan-06 1-Jan-12 1-Jan-13 20-Dec-84 1985 31-Dec-85 1-Feb-89 1-Feb-89 1-Feb-89 1-Feb-89 1-Dec-89 1-Oct-90

391 393 393 393 C 395 C 393 C 393 C 393 C 393 C

393 C 393 C 572 F 371 C 307 C 316 C 349 C 349 C 349 C 390 C 390 C 390 C 390 C

115 115 115 80.93 230

115 Hect 115 Hect 115 Hect 200 acres 230 Hect

1-Jan-09 1-Jan-09 1-Jan-09 1-Dec-12 1-Jan-20 2013

393 C 393 C 393 C 393 C

50 MW 50 MW 50 MW 5 MW 49.9 Mw 50 MW

TURBINE MANUFACTURER

THERMAL STORAGE 0 7.5 Hour 7.5 Hour 7.5 Hour 7.5 Hour 8 Hour 7.5 Hour 7.5 Hour

Nos of SCAs 768 624 624 640 624 54 624 672 8 384 624 624 624 624

SCA Mfg. Acciona Solar Power SKEL-ET SKEL-ET Senertrough Comes(ENEA) SAMCA-trough SKALET 150 SKALET 150 Senertrough Senertrough Senertrough

MIRRORS Mfg.

Siemens Siemens Siemens Tosi

Flabeg Flabeg Flabeg Ronda Reflex Rioglass Flabeg Flabeg Flabeg Flabeg Flabeg

Siemens
Siemens

116 MWh 7.5 Hour


7.5 hour 7.5 hour

Siemens Siemens Siemens Siemens

352 Iberdrola 224 224 672 756 792 624 624

Flabeg Rioglass Rioglass Rioglass Solel Flabeg Flabeg Flabeg

Siemens

7.5 Hour

Siemens Siemens

7.5 Hour 7.5 Hour 0.5 Hour

SAMCA-trough Solel Acciona Solar Power Senertrough Senertrough

760 Acciona Solar Power

792 Acciona Solar Power 792 Acciona Solar Power Ormat 6 Hour Luz Luz Luz Luz Luz Luz Luz Luz Luz 24 Starnet 768 Flabeg

360 Astro 360 Astro 360 Astro 7.5 Hour 624

Rioglass Rioglass Rioglass

SCE Mfg.

SCHOTT SCHOTT Solel (UVAC 2008) Archimede Solar Energy Schott

SCHOTT Solel (UVAC 2008) Solel (UVAC 2008) SCHOTT SCHOTT SCHOTT SCHOTT SCHOTT SCHOTT Solel SCHOTT SCHOTT Schott

SCHOTT

Solel UVAC Solel UVAC Solel UVAC Solel UVAC Solel UVAC Solel UVAC Solel UVAC

Schott Schott Schott

S No. 2 3 4 7 9 10 13 14 19 20 21 23 24 26 27 29 30 34 36 39 40 41 42 43 44 45 46 47 48 49 50

PROJECT NAME Alvarado 1 Andasol 1 Andasol 2 Archimede Central Solar Termoelectrica La Florida Colorado Integrated Solar Project Extresol-1 Extresol-2 Holaniku at Keahole Point Ibersol Ciudad Real (Puertollano) ISCC Argelia (ISCCS Al Kuraymat) ISCCS Al Kuraymat (ISCC Argelia) La Dehesa Majadas I Manchasol-1 (MS-1) Martin Next Generation Solar Energy Center (MNGSEC) Nevada Solar One (NSO) Palma del Ro II Saguaro Power Plant Solar Electric Generating Station I (SEGS I) Solar Electric Generating Station II (SEGS II) Solar Electric Generating Station III (SEGS III) Solar Electric Generating Station IV (SEGS IV) Solar Electric Generating Station V (SEGS V) Solar Electric Generating Station VI (SEGS VI) Solar Electric Generating Station VII (SEGS VII) Solar Electric Generating Station VIII (SEGS VIII) Solar Electric Generating Station IX (SEGS IX) Solnova 1 Solnova 3 Solnova 4

Country Spain Spain Spain Italy Spain US Spain Spain US Spain Morroco Algeria Spain Spain Spain US US Spain US US US US US US US US US US Spain Spain Spain

TECHNOLOGY Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough

STATUS Operational Operational Operational Operational Operational Operational Operational Operational Operational Operational Operational Operational Operational Operational Operational Operational Operational Operational Operational Operational Operational Operational Operational Operational Operational Operational Operational Operational Operational Operational Operational

STATUS ON 3-Dec-11 20-Jan-10 20-Jan-11 20-Jun-11 3-Dec-10 13-May-11 20-Jan-11 13-May-11 3-Dec-11 3-Dec-11 25-Oct-11 20-Aug-10 30-Mar-11 21-Jan-11 30-Mar-11 4-Feb-11 7-Sep-11 21-Jan-11 1-May-09 22-May-09 22-May-09 22-May-09 22-May-09 22-May-09 22-May-09 22-May-09 22-May-09 22-May-09 3-Dec-10 3-Dec-10 3-Dec-10

Solar-Field Aperture Area (m2) 510120 510120 31860 552750 6664 510120 510120 287760 183860 131000 552750 510120 357200 100000 82960 190338 230300 230300 250500 188000 194280 464340 483960 300000 300000 300000

Efficiency Gross (%)

LAND AREA 135 200 200 8 200 2.42 200 201 150

16 15.6 13.81 16 16 2

13.81 16

7.5

200 135 200 500 161.87 135 6.47

115 115 115

LAND AREA 135 Hect 200 Hect 200 Hect 8 Hect 200 Hect 6 acres 200 Hect 201 Hect 150 Hect

START PRODUCTION 1-Jun-09 26-Nov-08 1-Jun-09 14-Jul-10 1-Jun-10 2010 1-Jan-10 12-Nov-10 1-Dec-09 1-Jun-09 1-May-11 1-Jul-11 Feb-11 Oct-10 Jan-11 10-Dec-10 Jun-07 Dec-10 Jan-06 20-Dec-84 1985 31-Dec-85 1-Feb-89 1-Feb-89 1-Feb-89 1-Feb-89 1-Dec-89 1-Oct-90 1-Jan-09 1-Jan-09 1-Jan-09

SOLAR FIELD OUTLET TEMP. 393 C 393 C 393 C 550 C 393 C 393 C 393 391 393 393 393 C 393 C 393 C 393 C 393 C 572 F 307 C 316 C 349 C 349 C 349 C 390 C 390 C 390 C 390 C 393 C 393 C 393 C

200 Hect 135 Hect 200 Hect 500 acres 400 acres 135 Hect 16 acres

115 Hect 115 Hect 115 Hect

TURBINE CAPACITY (MW) MANUFACTURER 50 50 Siemens 50 Siemens 5 Tosi 49.9 2 50 Siemens Siemens 49.9 2 50 Siemens 470 25 49.9 Siemens 50 49.9 Siemens 75 75 50 1.16 Ormat 13.8 30 30 30 30 30 30 89 89 50 50 50 1726.56

THERMAL STORAGE 7.5 Hour 7.5 Hour 8 Hour 7.5 Hour 7.5 Hour
7.5 hour

Nos of SCAs 768 624 624 54 672 8 624 624 352 224 224 672 792 624

SCA Mfg. Acciona Solar Power SKEL-ET SKEL-ET Comes(ENEA) SAMCA-trough Senertrough Senertrough Iberdrola

MIRRORS Mfg. Flabeg Flabeg Ronda Reflex Rioglass Flabeg Flabeg Flabeg Rioglass Rioglass Rioglass Flabeg Flabeg Flabeg

SCE Mfg. SCHOTT SCHOTT Archimede Solar Energy Schott SCHOTT Solel (UVAC 2008) SCHOTT SCHOTT SCHOTT SCHOTT SCHOTT Schott SCHOTT

7.5 Hour 7.5 Hour 0.5 Hour

SAMCA-trough Acciona Solar Power Senertrough

760 Acciona Solar Power 792 Acciona Solar Power 24 Starnet Luz Luz Luz Luz Luz Luz Luz Luz Luz 360 Astro 360 Astro 360 Astro

Rioglass Rioglass Rioglass

Solel UVAC Solel UVAC Solel UVAC Solel UVAC Solel UVAC Solel UVAC Solel UVAC Schott Schott Schott

S No. 1 5 6 8 11 12 15 16 17 18 22 25 28 31 32 33 35 37 38 51 52 53

PROJECT NAME Abengoa Mojave Solar Project Andasol 3 Andasol 4 Arcosol 50 EL REBOSO II 50-MW Solar Thermal Power Plant EL REBOSO III 50-MW Solar Thermal Power Plant Extresol-3 Genesis Solar Energy Project Helios I (Helios I) Helios II (Helios II) ISCC Morocco (ISCC Morocco) Lebrija 1 (LE-1) Manchasol-2 (MS-2) NextEra Beacon Solar Energy Project (Beacon) Palen Solar Power Project Palma del Ro I Palmdale Hybrid Power Plant (PHPP) Shams 1 (Shams 1) Solana Generating Station (Solana) UA Tech Park Thermal Storage Demonstration Project Vallesol 50 Victorville 2 Hybrid Power Plant

Country US Spain Spain Spain Spain Spain Spain US Spain Spain Egypt Spain Spain US US Spain US UAE US US Spain US

TECHNOLOGY Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough Parabolic trough

STATUS Under construction Under construction Under construction Under construction Under construction Under Ccontract Under construction Under construction Under construction Under construction Under construction Under construction Under construction Under development Under development Under construction Under development Under development Under development Under development Under construction Under development

STATUS ON 20-Oct-11 7-Jan-11 23-Nov-10 3-Dec-10 27-Aug-07 27-Aug-09 28-Apr-11 7-Apr-11 1-Jul-11 1-Jul-11 20-Aug-10 14-Apr-09 4-May-09 21-Jan-11 3-Dec-10 21-Jan-11 20-Oct-11 20-Aug-10 3-Dec-10 20-Oct-11 3-Dec-10 20-Oct-11

Solar-Field Aperture Area (m2)

Efficiency Gross (%)

LAND AREA 714.27 200 200 230 160 242 200 260 261

510120 319057 518469 510120

16 17 17 16

180000 412020 510120 1450000

16

188 200 814.22 558.46 135 152.56 768.9 80.93 230

2 510120

LAND AREA 1765 acres 200 Hect 200 Hect 230 Hect 160 Hect 242 Hect 200 Hect 260 Hect 261 Hect 188 Hect 200 Hect 2012 acres 1380 acres 135 Hect 377 acres 1900 acres 200 acres 230 Hect

START PRODUCTION 1-Jan-13 1-Jun-11 1-Jan-20 1-Jan-20 Oct-11 Nov-12 8-May-11 1-Jan-14

SOLAR FIELD OUTLET TEMP. 740 F 393 C 393 C 393 C 393 C 393 740

30-Dec-12 May-10 May-10 2014 1-Jan-14 2011 2013 1-Jan-12 1-Jan-13 1-Dec-12 1-Jan-20 2013

395 C 393 C

393 C

371 C 393 C TOTAL

TURBINE CAPACITY (MW) MANUFACTURER 250 (2*125) 50 50 Siemens 49.9 50 50 49.9 Siemens 250 49.9 Siemens 49.9 Siemens 140 49.9 49.9 Siemens 250 500 (2*250) 50 50 100 280 (2*140) 5 49.9 50 2474.3

THERMAL STORAGE 0 7.5 Hour 7.5 Hour 7.5 Hour 116 MWh
7.5 hour

Nos of SCAs 640 624 624 384 624 624

SCA Mfg.

MIRRORS Mfg.

SCE Mfg.

Senertrough SKALET 150 SKALET 150 Senertrough

Flabeg Flabeg Flabeg Flabeg

Solel (UVAC 2008)

Solel (UVAC 2008) SCHOTT SCHOTT

7.5 Hour

756 Solel 624 Senertrough

Solel Flabeg

Solel SCHOTT

792 Acciona Solar Power 768 6 Hour 7.5 Hour 624