Interim Certificate

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

Interim

Certificate

Issued by:
address:
Employer:
address:

Job reference:
Instruction no:
Issue date:
Final Date for
payment:
Contractor:
address:

Final Date for payment:

Works:
situated at:
Contract dated:
This Interim Certificate is issued under the terms of the above-mentioned Contract.
Gross Valuation........................................................................................

BD

Less Retention as detailed on the attached Statement of Retention ..

BD

Sub-Total

BD

Less reimbursement of advance payment

BD

Sub-Total

BD

Less total amount previously certified ....

BD

Net amount for payment ...

BD

I/We hereby certify the amount due to the Contractor from the Employer
is in words

__________________________________________________________
__________________________________________________________

Meena Projects/Standard Documents/182498136.doc

__________________________________________________________
To be signed by or for
the issuer named
above

Distribution

Signed_____________________________________

Employer

Contractor

Meena Projects/Standard Documents/182498136.doc