Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Water Supply Pump Calculation

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

wotet sopply ttoosfet pomp colcolotloos:

xomple.
A bulldlng conslsLs of Cround floor + 3 arklng floors + 13 8esldenLlal
floors.
1- ump llow CalculaLlon:
- 8oof WaLer 1ank Slze = 14830 lmp Clns.
- 1lme of lllllng: 3 hours.
CapaclLy requlred: C = 14830/ 220x3 = 22.3 m
3
/hr.
2- ump Pead CalculaLlon:
- PelghL of Lhe bulldlng = 70 MLrs.
- used lpe Slze = 2 1/2" (lnLernal dlameLer).
- lpe 1ype: -8.
- 1oLal lengLh of plpe = 93 MLrs.
- no. of 90

bends = 8 pcs.
- no. of 1ees = 2 pcs.
- no. of sockeLs = 30 pcs.
- no. of gaLe valves = 2 pcs.
- no. of non reLurn valve = 1 pc.
1oLal Pead = P
s
+ P
f
+ P
r.L
.... [MLrs]
Where:
P
s
- SLaLlc Pead.
P
f
- lrlcLlon Pead.
P
r.L
- ressure 8equlred aL 8oof 1ap (Lhe pressure of waLer aL roof Lank
lnleL).
P
s
= 70 mLrs........ (1)
P
f
= 3.28/100 x frlcLlon head loss (feeL / 100 feeL of plpe)
x LoLal equlvalenL lengLh of plpe.. [MLrs]
1oLal equlvalenL lengLh of plpe = maln plpe lengLh + equlvalenL lengLhs
of flLLlngs.
Accordlng Lo Lhe unlform plumblng code:
- Lq.l of 90

bend = 2.4 mLrs.


- Lq.l of 1ee = 3.6 mLrs.
- Lq.l of sockeL = 0.8 mLrs.
- Lq.l of gaLe valve = 0.3 mLrs.
- Lq.l of non reLurn valve = 6 mLrs.
1oLal equlvalenL lengLh of plpe = 93+19.2+7.2+24+6+1 = 132.4 mLrs.
lrlcLlon head loss = 4.38 (feeL/100 feeL)..[see Lhe second enclosed flle]
P
f
= 3.28/100 x 4.38 x 132.4 = 22.8 mLrs.....(2)
P
r.L
= 1 bar = 10 mLrs.................(3)
P
L
= 70 + 22.8 + 10 = 102.8 mLrs
P= 103 mLrs = 10.3 bar.
C = 22.3 m
3
/hr.
nqr. 4hmod.n - u4

You might also like