DETAILED ESTIMATE AND COSTING OF FIRST FLOOR Project Name :- CONSTRUCTION OF SARSOWATI UCHA MA. VI. BUILDING (GETA), KAILALI Project Site :- GETA VDC- 4, KAILALI Consultant :- Tribhuwan Engineering Services, Dhangadhi, Kailali SN Description No Length Breadth Height Quantity Unit Rate A CIVIL WORK : 1 R.C.C works a) Wooden Form works of approved quality Column 9"x12" 6 11.00 3.50 231.00 Tie Beams 9"x12" 1 79.00 2.00 158.00 Slab 1 395.00 395.00 Total 784.00 Ft2 31.71 b) Concreting works M20 (1:1.5:3) for R.C.C. 6 11.00 1.00 0.75 66.00 Column 9"x12" Tie Beams 9"x12" 1 79.00 1.00 0.75 59.25 395.00 Slab 1 0.33 0.00 Total 125.25 Ft3 265.5 c) Reinforcement steel works Cutting, Bending, Placing in position & Binding all works complete. 2 Brick works in (1:4) CSM in First floor First Floor @2 % of concrete volume by weight 87.01 556.90 Kg 232.50 360.00 -36.75 -67.50 488.25 Ft3 48456.14 Amount Rmk
24860.64
33247.61
2 3
216.8
105867.25
Prepared By:-
Checked By:-
Approved By:-
Page 3 of 8
3 12.5 mm thick Plaster (1:4) CSM Outer side wall (Outer side) Flooring
1 1
11.00 Total
393.25 393.25 319.00 -49.00 -90.00 573.25 Ft2 225.50 115.50 341.00 Ft2 319.00 2 319.00 Ft 3.67 10.71 14.38 Ft3 67.50 2 67.50 Ft 67.50 67.50 Ft2
Deductions for Doors and Windows D -2 W -3 4 20 mm thick Plaster in (1:4) CSM in Inside walls Science Lab Passage 5 3mm thick Cement Sand Punning work in (1:1)
16.78
9619.14
2 2
10.25 5.25
16.50 16.50
22.61
7710.01
319.00 Total
13.35
4258.65
D W
2 3
17.50 34.00
0.25 0.25
2331
33515.75
4.50
433.4
29251.80
8 4.5/20 mm MS Grill W
4.50
193.2
13043.70
395.00 Total
19.85
7840.75
Prepared By:-
Checked By:-
Approved By:-
Page 4 of 8
10 Two coats of Distemper Paint with one coat of primer in inside walls Plastering area of Inside walls Plastering area of Ceiling Total 11 Two coats of Weather Coat paint with one coat of primer in out side walls Plastering area of Outside walls 12 Enamel Paint in Doors and Windows 13 Two Coats of Aluminium Paint with one coat of primer Total As per deduction area As per Grill area
6.8
5004.80
393.25 Ft 2 139.00 Ft
67.50 Ft2 Total for Civil Works Sanitary & Electrification Works @ 10% of Civil Works Sub Total Grand Total
Prepared By:-
Checked By:-
Approved By:-
Page 5 of 8
DETAILED ESTIMATE AND COSTING OF SECOND FLOOR Project Name :- CONSTRUCTION OF SARSOWATI UCHA MA. VI. BUILDING (GETA), KAILALI Project Site :- GETA VDC- 4, KAILALI Consultant :- Tribhuwan Engineering Services, Dhangadhi, Kailali SN Description No Length Breadth Height Quantity Unit A CIVIL WORK : 1 R.C.C works a) Wooden Form works of approved quality Column 9"x12" 16 11.00 3.50 616.00 Tie Beams 9"x12" 1 299.50 2.00 599.00 Slab 1 1850.00 1850.00 Total 3065.00 Ft2 b) Concreting works M20 (1:1.5:3) for R.C.C. 16 11.00 1.00 0.75 176.00 Column 9"x12" Tie Beams 9"x12" 1 299.50 1.00 0.75 224.63 1890.00 Slab 1 0.33 623.70 Total 1024.32 Ft3 c) Reinforcement steel works Cutting, Bending, Placing in position & Binding all works complete 2 Brick works in (1:4) CSM in First floor Second Floor @ 2% of concrete volume by weight Rate Amount Rmk
31.71
97191.15
265.45 87.01
271905.74
4554.47 Kg 2246.25 -73.50 -292.50 1880.25 Ft3 1490.50 396.00 165.00 2051.50 1557.00
396284.20
Deductions for Doors and Windows D -4 W -13 3 12.5 mm thick Plaster (1:4) CSM Outer side wall Second Floor (Outer side) Passage Flooring
216.83
407694.61
2 2 5 1
Page 6 of 8
Deductions for Doors and Windows D -4 W -13 4 20 mm thick Plaster in (1:4) CSM in Inside walls Science Lab 5 3mm thick Cement Sand Punning work in (1:1)
3.50 6.00
-98.00 -390.00 3120.50 Ft2 1457.50 1457.50 Ft2 1557.00 1557.00 Ft2 7.35 46.41 53.76 Ft3 292.50 292.50 Ft2 292.50 292.50 Ft2
16.78
52361.99
66.25
16.50
11.00 Total
22.61
32954.08
1557.00 Total
13.35
20785.95
D 4 W 13
17.50 34.00
0.25 0.25
2330.72
125299.51
W 13
4.50
433.36
126757.80
8 4.5/20 mm MS Grill
W 13
4.50
193.24
56522.70
1890.00 Total
19.85
37516.50
10 Two coats of Distemper Paint with one coat of primer in inside walls Plastering area of Inside walls Plastering area of Ceiling Total 11 Two coats of Weather Coat paint with one coat of primer in out side walls
6.8
22763.00
Page 7 of 8
Plastering area of Outside walls 12 Enamel Paint in Doors and Windows 13 Two Coats of Aluminium Paint with one coat of primer
292.50 Ft2 Total for Civil Works Sanitary & Electrification Works @ 10% of Civil Works Sub Total Grand Total
SUMMARY OF COST Project Name :- CONSTRUCTION OF SARSOWATI UCHA MA. VI. BUILDING (GETA), KAILALI Project Site :- GETA VDC- 4, KAILALI Consultant :- Tribhuwan Engineering Services, Dhangadhi, Kailali #REF! Cost of Ground Floor 363150.59 Cost of First Floor 1850692.46 Cost of Second Floor #REF! Total #REF! Contingency @ 5% #REF! Sub-Total #REF! Adding Vat @ 13% #REF! Grand Total In Words, Rupees; Thirty-Two Lakhs, Thirty-One Thousands, Eight Hundreds, Eighteen Rupees and Thirty Six Paisa Only.