PHASE # 1
Name CRAC In Row RC units Qty 4 21 Unit Flow rate GPM (l/s) 95.5 (6) 16.1 (1.02) Total Flow rate GPM (l/s) 382(24) 338.1 (21.33)
PHASE # 2
Name In Row RC units Qty 4 Unit Flow rate GPM (l/s) 16.1 (1.02) Total Flow rate GPM (l/s) 64.4 (4.06)
Page 1
Pipe Sizing
Flow rate (GPM) 784.5 160 95.5 Pipe (Inch) 8 3 2
Recommendation As per ASHRAE (Reference Attached) As per Manufacture (Reference Attached) As per Manufacture (Reference Attached)
Page 2
CDU Pressure Drop CDU pressure drop CDU pressure drop = = Total In Row RC units connected to CDU (reference attached) 16 GPM (39.8 k Pa)
Pressure Drop in Bends Pressure drop in bends Pressure drop in bends Pressure drop in bends As per catalogue Pressure drop in bends = = = = Number of bends in supply + Number of bends in returns 5 + 5 10 bends 3.05 m (29.89 k Pa)
Pressure drop in PEX piping Flow rate in PEX piping Total linear supply distance Total linear return distance Total linear distance Pressure drop in PEX piping Pressure drop in PEX piping = = = = = = 16 GPM (1.67 k Pa /m) 18.22 m 18.22 m 36.24 m 1.67 k Pa /m x 36.24 m 60.5 k Pa
Page 3
Total Pressure Drop of CDU Total Pressure Drop Total Pressure Drop Total Pressure Drop Total Pump Head = = = 39.8 k Pa + 30 k Pa + 60.5 k Pa 130.3 k Pa 13.3 meter
77.22 + 13.3
90.52 meter