S.No Scope of Work Feed Water Pumping Skid Manhour Estimate For Prebid Engineering of Fuel Gas System

The document provides an estimate of manhours required for pre-bid engineering of a fuel gas system. It lists 17 scopes of work, such as preparation of P&IDs, sizing calculations, and specifications. The total estimated manhours is 160. Notes indicate that the client must provide input data and drawings for evaluation, and float inquiries for offers.

Uploaded by

SIVA
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
113 views

S.No Scope of Work Feed Water Pumping Skid Manhour Estimate For Prebid Engineering of Fuel Gas System

The document provides an estimate of manhours required for pre-bid engineering of a fuel gas system. It lists 17 scopes of work, such as preparation of P&IDs, sizing calculations, and specifications. The total estimated manhours is 160. Notes indicate that the client must provide input data and drawings for evaluation, and float inquiries for offers.

Uploaded by

SIVA
Copyright
© Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

S.

No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 12 13 14

Manhour Estimate for Prebid Engineering of Fuel Gas syste Scope of Work Study of existing Input data's Feed water Pumping skid Preparation of P&ID for feed pump skid Sizing calculation of fitting and lines Preparation of MTO's Pump Specification/Datasheet Hot water Heater skid (Gas fired) Preparation of P&ID for Hot water heater Sizing calculation of fitting, valves and lines Preparation of MTO's Hot water Generator (HE)Specification/Datasheet ESD & Scrubber skid Preparation of P&ID's Sizing calculation for ESD and Scrubber, accessories Preparation of MTO's Specification/Datasheet Hot water Heater skid (Gas fired) Preparation of P&ID for Hot water heater Sizing calculation of fitting, valves and lines Preparation of MTO's Heat Exchanger specification/Datasheet Condensate (Waste) drum Preparation of P&ID for Knockout drum Sizing calculation of fitting, valves and lines Preparation of MTO's Total

Notes: 1. Client shall need to provide us with all the necessary information Catalogues, Drawings, rated loads, name plate details, designed parameters, drawings, test, installation & efficiency certificates e for the purpose of evaluation.

2. Client requires to float the enquiry & follow up the offers based requirement.

ering of Fuel Gas system Manhours 10 10 5 5 10 10 5 5 10 15 10 5 10 10 5 5 10 10 5 5 160

Remarks

e necessary information about the equipments, ate details, designed loads and operating ficiency certificates etc., if any required

low up the offers based on citec's technical