Jawaharlal Nehru National Solar Mission
Jawaharlal Nehru National Solar Mission
Jawaharlal Nehru National Solar Mission
2010
1
Objective
To achieve volume production at a scale which leads to cost reduction and rapid diffusion and deployment of solar technologies across the country For this purpose set up enabling policy environment and regulatory framework.
2
Road Map
Mission aims at achieving grid tariff parity by 2022 by creating enabling policy framework, volumes for deployment, domestic manufacture, support infrastructure and R&D. Mission to be implemented in three phases. Government has approved a budget of Rs. 4,337 crores for the first phase of the Mission till March, 2013.
Application segment Phase I (2010-13) 1,100 MW Cumulative Cumulative Phase 2 Phase 3 (2013-17) (2017-22) 4,000 MW 20,000 MW
Grid solar power incl. roof top Off-grid solar applications Solar collectors
200 MW
1,000 MW
2,000 MW
7 million sq meters
15 million sq meters
20 million sq meters
CERC has announced tariff for 2010-11: PV Rs. 17.91 per unit CSP Rs. 15.45 per unit www.cercind.gov.in
PPA duration 25 years Solar specific RPO starting with 0.25% in 1st phase, increasing to 3% by 2022 to be fixed after policy change RE Certificate - policy finalized by Forum of Regulators. Available on CERC website
6
Guidelines for migration were announced and applications were received by 26th February, 2010
MoU with short listed project developers signed. These projects already signed PPA with NVVN.
Residential rooftops (Two way metering) Commercial, institutional, industrial & other rooftops (Net metering) Ground mounted & tail-end grid connected projects (Net metering)
Central Electricity Authority (CEA) has issued technical guidelines www.cea.nic.in Guidelines finalized and announced.
This will be a State Government driven imitative. Proposals of 100 KWp to 2 MWp connected to 11 KV grid accepted by the States and recommended to IREDA. Up to 20 MW capacity projects can be taken up in a State IREDA had registered projects online on first come first served basis.
8
10
R&D Strategy
Research at Academic/ Research Institutions on materials and devices with long-term perspective
HRD Strategy
1000 young scientists and engineers to get trained on different solar energy technologies as a part of longterm R&D and HRD plan 100 fellowships to be offered every year to support research students /groups Short term course for existing engineers and M. Sc degree holders to make them certified solar installers MNRE is working with Ministry of Labour to introduce solar energy related course and teaching material for ITI students in the current academic session
16
17