1. Design Comparison
Design Operation Installation Commissioning
VRF is very simplified refrigerant piping system. More flexible than water piping.
Feature
System composition
Chiller system
Cooling tower Chiller Water piping, Duct working FCU (Fan Coil Unit) AHU (Air Handling Unit) Water pumps
Chiller
2/14
1. Design Comparison
Design Operation Installation Commissioning
Network
ACP
3/14
1. Design Comparison
Design Operation Installation Commissioning
Control system
2. Operation Comparison
Design Operation Installation Commissioning
After office hours operation, VRF could be operated for the user demands.
Feature
Capacity control
Chiller system
The systems commonly condition the entire building at predetermined times, with no regard to user demands. (very hot midnight, weekend, holiday etc)
Operating Area
2. Operation Comparison
Design Operation Installation Commissioning
Chiller system
Require 1 or 2
Cooling
30 Room temp. 25 20 15
10
20
30
6/14
40
50
60
70
MIN.
3. Installation Comparison
Design Operation Installation Commissioning
Chiller system
Large duct space
7/14
3. Installation Comparison
Design Operation Installation Commissioning
Chiller system
Need a machine room
Pump
(Machine room drawing) Chiller (Rooftop drawing)
Boiler
Cooling tower
8/14
3. Installation Comparison
Design Operation Installation Commissioning
Chiller system
Large pipe shaft is needed for water piping
CHILLER SYSTEM
VRF System
1/3
P P
9/14
3. Installation Comparison
Design Operation Installation Commissioning
VRF system expansion is very easy with extra outdoor & indoor unit.
Feature Chiller system
Capacity addition is difficult as additional mechanical room, pump, cooling tower, panel and piping is required.
System Expansion
10/14
4. Commissioning Comparison
Design Operation Installation
Chiller system
6 Steps Commissioning
(4)
6 steps Commissioning
1 step Commissioning
11/14
5. Maintenance Comparison
Design Operation Installation Commissioning
Chiller system
Filter cleaning Duct cleaning Water pipe maintenance Periodical oil change, overhaul Pump Water treatment Cooling tower cleaning
Maintenance
(4)
12/14
5. Maintenance Comparison
Design Operation Installation Commissioning
Chiller system
Water treatment is required (deficient service can cause legionary disease in the system)
5. Maintenance Comparison
Design Operation Installation Commissioning
Chiller system
Need to clean the water pipes System efficiency drop & origin of germs
After 2~3year
10%
Energy Loss
Unit : %
Unit : mm
thickness of scale
After 5~6year
After 7~8year
25~30%
35~40%
14/14
5. Maintenance Comparison
Design Operation Installation Commissioning
Chiller system
The system requires certified maintenance staff not only for chillers but also pumps, boilers, cooling towers etc. More expensive maintenance cost.
6. Reliability Comparison
Design Operation Installation Commissioning
Chiller system
Pipe erosion can cause leakage. System capacity reduction. Brines use increase corrosion, anti corrosion additives needed
<Cooper Pipe>
7. Economic analysis
Initial Cost Running Cost Maintenance Cost
MULTI V vs Chiller
Total cost
Category
877,097
Air conditioning time : Operation - 13 hour a day (09:00 ~ 22:00) - 30 days a month - average load by month
VRV
Installation
1,109,660
17/14
7. Economic analysis
Initial Cost Running Cost Maintenance Cost
MULTI V vs Chiller
Total cost
Electrical cost
Multi V running cost is 65 % compare to chiller
Running Cost (USD)Tota l
$400k Chiller $300k Multi V
Chiller
Category
Product
Multi V
$200k
Chiller Price
308,697
$100k
$0k
200,158
10 th
12 th
Based on KW data chiller/Multi V Based on, Thailand electrical standard ARI-Air conditioning & Refrigeration Institute
18/14
ye ar
14 th
2n d
4t h
6t h
8t h
7. Economic analysis
Initial Cost Running Cost Maintenance Cost
MULTI V vs Chiller
Total cost
Maintenance cost
Multi V maintenance cost is 24 % compare to chiller
Category Price Maintenance Cost (USD)Total
$400k Chiller $300k Multi V
Chiller Multi V
Chiller Price Water Cooled C hiller Multi V AHU / Cooling Tower / Pump, Price Price 32,177
$200k
$100k
$0k
11,468
Maintenance breakdown Chiller system -31 USD / Rt / yr.- 6 times/yr Multi V- 48 USD / Indoor / yr.- 6 times/yr - 145 USD / Outdoor / yr.- 6 times/yr
19/14
ye ar
7. Economic analysis
Initial Cost Running Cost Maintenance Cost Total cost
Remarks
308,698
32,177 1,217,972 -
200,158
11,468 1,138,683 1.7 years Shopping mall 6F, 9,000
20/14
8. LCC
LCC (Life Cycle Cost for 15 years) : Chiller 5.99 M$ > Multi V 4.27 M$ (71%) BEP (Break Even Point) : 1.7 Years
BEP
+70K$
Chiller Multi V
10th
11th
12th
13th
14th
year
15th
8th
2nd
1st
3rd
9th
1st year
2nd year
3rd year
4th year
21/14
8. LCC
1,228
7%
Electrical Fee 308
5,992 1,321
200 11
35%
Electrical Fee
77%
4,274
73%
Maintenance
32
1,109 877
8% 15%
4% 23%
Chiller
Multi V
Chiller
Multi V
22/14
57%
48 Hp 10 Hp
VRF
19 90 90 1 1 57 38
9,000,000 2,900,000 11,900,000 27,510,000 18,183,000 8,221,950 262,350 81,125 141,570 94,050 125,400 27,109,445
79%
290,323 93,548 383,871 887,419 586,548 265,224 8,463 2,617 4,567 3,034 4,045 874,498
21% 100%
23/14
Category
EA
Chiller-350 Tr Cooling tower-1260 GPM Pump-50 Hp AHU-10 tr Total Outdoor Unit 48 HP-R410a Indoor Unit 10 HP CCD Total 13 30 100% 1% 42% 45% 12%
2 2 6 48 19 90
Chiller system Power consumption under partial load Load Chillier 100% 542 75% 50% 179 84 474 474 653 558 75% 50% 609 287 25% 47 474 521 25% 165
Others 474 Total 1016 VRF system Load VRF 100% 870
VRF
operating time / day (hours) operating day / month Cooling load portion IPLV 100% cooling load 75% cooling load 50% cooling load 25% cooling load VRF (MULTI V system) Operation hours 0.1 5.5 5.9 1.6 13.0 kWh / day 113.1 3,325.1 1,679.5 257.9 5,375.6
Power consumption kW 542 179.2 83.9 47.2 Chiller system portion 100% 33% 15% 9% VRF Chiller Gap kWh / month 132.06 3,565.60 3,262.78 812.82 7,773.3 3,961.78 106,967.95 97,883.37 24,384.67 233,197.8 VRF Chiller operating cost 1 year 200,158 308,698 Used by Schedule 4.2.2 condition electrical charge in Thailand THB / month 517,076 797,469 280,393 USD 16,680 25,725 9,045
kWh / day
24/14
Category
Capacity
EA
Maintenance cost / year 210,000 120,000 93,600 140,000 240,000 803,600 270,000 85,500 355,500
A note
Chiller VRF
25/14
App. Energy efficiency (IPLV) ARI Released The New Standard in 2003
Available through the ARI web site: WWW.ARI.ORG
IPLV OR = APLV
1
0.01 + 0.42 + 0.45 + 0.12 A B C D
ARI550/590-2003
1%
42%
45%
12%
100%
75%
50%
25%
26/14