Sample Load List

The document lists the electrical load requirements for a proposed steel plant project in ICAD 2, AGSI. It details the connected and future load in kW and kVA for various plant areas including induction furnaces, rolling mills, material handling equipment, workshops, and auxiliary loads. The largest load comes from 6 induction furnaces with a total connected load of 35,107 kW. The overall total connected and future load for the project is 47,379 kW and 59,224 kVA.

Uploaded by

shaikhsajid242
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views

Sample Load List

The document lists the electrical load requirements for a proposed steel plant project in ICAD 2, AGSI. It details the connected and future load in kW and kVA for various plant areas including induction furnaces, rolling mills, material handling equipment, workshops, and auxiliary loads. The largest load comes from 6 induction furnaces with a total connected load of 35,107 kW. The overall total connected and future load for the project is 47,379 kW and 59,224 kVA.

Uploaded by

shaikhsajid242
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

ELECTRICAL LOAD LIST

Project : STEEL PLANT @ ICAD 2 - AGSI


Date of Issue - 19 Nov 13
Rev. No. 0
Sr. No. Equipment Name Qty
Total
Connected
Load in kW
TCL IN KVA
Future Load
in KVA
Total KVA
1 INDUCTION FURNACE 6 35107.2 43884 14482 58366
2 LRF 1 4000 5000 750 5750
1 MCS01 GENERAL DRIVES & STARTERS 1 590 737.5 74 811
2 MCSO2 STRAND DRIVES & STARTERS 1 90 112.5 11 124
3 CCM AREA LIGHTING/HVAC SWITCHBOARD 1 110 137.5 14 151
CCM TOTAL KW 790.00 987.50 99 1086
1 MAIN FAN 1 400 500 165 665
2 MAIN FAN 2 400 500 165 665
3 MCSO1 DRIVES 30 37.5 12 50
4 FTP AREA LIGHTING/HVAC SWITCHBOARD 70 87.5 29 116
FTP TOTAL KW 900.00 1,125.00 371 1496
1 MCSO1 WTP DRIVES 1 820 1025 1025
2 MCSO2 WTP DRIVES 1 850 1062.5 1063
3 FTP AREA LIGHTING/HVAC SWITCHBOARD 1 70 87.5 9 96
WTP TOTAL KW 1,740.00 2,175.00 9 2184
1 SHREDDER MOTOR 1 1500 1875 1875
1 SHREDDER PLANT MCSO1 DRIVES 1 380 475 48 523
2 SHEAR ELECTRICAL SWITCH 370 462.5 46 509
3 SHREDDER AREA LIGHTING/HVAC SWITCHBOARD 1 100 125 13 138
SHREDDER & SHEAR AUXILLARY LOADS TOTAL KW 850.00 1,062.50 106 1169
1
FIREFIGHTING SWITCHBOARD
230 287.5 29 316
2
CRANE SWITCH BOARD
1052 1315 66 1381
3 CRANE AREA LIGHTING/HVAC SWITCHBOARD 80 100 25 125
4 MAIN BUILDING LIGHTING & HVAC LOADS 210 262.5 66 328
TOTAL LOAD IN KW 1,572.00 1,965.00 185 2150
1
LRF AREA MCSO1 FOR DRIVES
1 230 287.5 288
2
LRF AREA FOR LIGHTING & HVAC
1 90 112.5 37 150
3
INDUCTION FURNACE 1 AUX SWITCH BOARD
1 150 187.5 188
4
INDUCTION FURNACE 2 AUX SWITCH BOARD
1 150 187.5 188
5
INDUCTION FURNACE 3 AUX SWITCH BOARD
1 150 187.5 188
6
INDUCTION FURNACE 4 AUX SWITCH BOARD (FUTURE)
1 150 187.5 188
TOTAL LOAD IN KW 920.00 1,150.00 37 1187
47,379.20 59,224.00 16,039.10
LRF & INDUCTION AREA
CCM
FTP
WTP
SHREDDER PLANT
AUXILLARY & CRANE LOADS
ELECTRICAL LOAD LIST
Project : STEEL PLANT @ ICAD 2 - AGSI
Date of Issue - 19 Nov 13
Rev. No. 0
Sr. No. Equipment Name Qty
Total
Connected
Load in kW
TCL IN KVA
Future Load
in KVA
Total KVA
1 INDUCTION FURNACE 6 35107.2 43884 14482 58366
2 LRF 1 4000 5000 750 5750
1 MCS01 GENERAL DRIVES & STARTERS 1 590 737.5 74 811
2 MCSO2 STRAND DRIVES & STARTERS 1 90 112.5 11 124
3 CCM AREA LIGHTING/HVAC SWITCHBOARD 1 110 137.5 14 151
CCM TOTAL KW 790.00 987.50 99 1086
1 MAIN FAN 1 400 500 165 665
2 MAIN FAN 2 400 500 165 665
3 MCSO1 DRIVES 30 37.5 12 50
4 FTP AREA LIGHTING/HVAC SWITCHBOARD 70 87.5 29 116
FTP TOTAL KW 900.00 1,125.00 371 1496
1 MCSO1 WTP DRIVES 1 820 1025 1025
2 MCSO2 WTP DRIVES 1 850 1062.5 1063
3 FTP AREA LIGHTING/HVAC SWITCHBOARD 1 70 87.5 9 96
WTP TOTAL KW 1,740.00 2,175.00 9 2184
1 SHREDDER MOTOR 1 1500 1875 1875
1 SHREDDER PLANT MCSO1 DRIVES 1 380 475 48 523
2 SHEAR ELECTRICAL SWITCH 370 462.5 46 509
3 SHREDDER AREA LIGHTING/HVAC SWITCHBOARD 1 100 125 13 138
SHREDDER & SHEAR AUXILLARY LOADS TOTAL KW 850.00 1,062.50 106 1169
1
FIREFIGHTING SWITCHBOARD
230 287.5 29 316
2
CRANE SWITCH BOARD
1052 1315 66 1381
3 CRANE AREA LIGHTING/HVAC SWITCHBOARD 80 100 25 125
4 MAIN BUILDING LIGHTING & HVAC LOADS 210 262.5 66 328
TOTAL LOAD IN KW 1,572.00 1,965.00 185 2150
1
LRF AREA MCSO1 FOR DRIVES
1 230 287.5 288
2
LRF AREA FOR LIGHTING & HVAC
1 90 112.5 37 150
3
INDUCTION FURNACE 1 AUX SWITCH BOARD
1 150 187.5 188
4
INDUCTION FURNACE 2 AUX SWITCH BOARD
1 150 187.5 188
5
INDUCTION FURNACE 3 AUX SWITCH BOARD
1 150 187.5 188
6
INDUCTION FURNACE 4 AUX SWITCH BOARD (FUTURE)
1 150 187.5 188
TOTAL LOAD IN KW 920.00 1,150.00 37 1187
Total Connected & Future Load in KW & KVA 47,379.20 59,224.00 16,039.10
SHREDDER PLANT
AUXILLARY & CRANE LOADS
LRF & INDUCTION AREA
TAYBAH GROUP - AGSI
CCM
FTP
WTP