S.M.

Engineers & Consultants Sheet 01 of 03

06.02.2006 Nokia Chennai Plant I. Sl.No. 1. 2. 3. 4. 5. Additional Electrical Loads for Chiller / Pumps / Air compressors Rating Qty. 326KW 2 7KW 4 21KW 3 185KW 10KW 2 2 Working 2 2 2 1 1 Standby 2 1 1 1 Total Electrical Load 652 14 42 185 10 903KW

Description Screw Chiller Primary Pumps Secondary Pumps Air Compressors Air Dryer

Size of DG Recommended : 2000KVA

S.M. Engineers & Consultants Sheet 02 of 03

II. 1.0 Data Base Load Rating of Chiller Efficiency of Chiller Motor Power Factor Starter Used for Chiller Motor

DG Selection Calculation

: : : : : :

577KW (903 - 326KW) 326KW 0.95(Assumed) 0.83(Assumed) Star - Delta 2.5 Times Full Load Current 0.15 15%

Starting Current of Chiller Motor

Transient Reactance for 2000KVA Alternator : Allowable Voltage Drop During Starting 2.0 :

Selection of Alternator (with 1 Chiller Starting + Others Running) Base KVA Rating of Chiller Motor : : : : Steady KVA Required Starting KVA Required Instantaneous KVA : : : : 695.18KVA (577 / 0.83) 326KW 326 / 0.95 343.15KW 413.43KVA 1033.575KVA (413.43 x 2.5) 1033.575 + 695.18 1728.755KVA

Input KW required

3.0

Considering 2000KVA Alternator KVA available for Starting Drop in Voltage i.e : : : : : 2000 - 695.18KVA 1304.82KVA 1728.755 x 0.15 / 2000 0.1296 12.96%

Since Voltage Drop during starting is <15%, 2000KVA DG is recommended.

S.M. Engineers & Consultants Sheet 03 of 03

III. Incomer Outgoings

Particular Requirement of Temporary Panel - HVAC : : : : : 3200A TPN ACB 800A TPN MCCB 630A TPN MCCB 63A TPN MCCB 32A TPN MCCB : : : : 3Nos. 3Nos. 4Nos. 8Nos.

Incomer shall be provided with Digital Ammeter & Digital Voltmeter