Revision Philosophy
All revisions for review will be issued at R01, with subsequent R02, R03, etc as required.
All revisions approved for issue or design will be issued at A01, with subsequent A02, A03, etc as
required.
Documents approved for Construction will be issued at C01, C02, and C03 respectively.
Documents or drawings revised as As built will be issued as Z01, Z02, Z03 etc.
Narrative sections revised from previous approved issues are to be noted in the table below
and/or highlighted in the RH margin (using the appropriate revision status) thus: | A02
Previous revision highlighting to be removed at subsequent issues.
Drawings/diagrams revised from previous approved issues are highlighted by 'clouding' the
affected areas and by the use of a triangle containing the revision status.
Revision History
Revision
No.
Date of issue
R01
04/05/2009
SDA-TPEF-PLI_UGHG1-EA4606-00001-000-A01
1.0
Introduction:
This study is to determine the fault level at the Ughelli Pump Station electrical power distribution
system in order to assist in equipment sizing and selection for the Ughelli-Utorogu NAG Pipeline
System project.
The overall single line diagram for the Ughelli Pump Station is shown in Fig. 1 below:
1 MVA
Xd = 15%
1.25MVA
Z = 5%
SB-401
415V,50Hz
SB-403
415V,50Hz
SB-411
415V,50Hz
References
1. Ughelli Pump Station Key Single Line diagram (SDA-TPEF-PLI_UGHG1-EA2384-00001-001)
2. ABB XLPE Cable Systems Catalogue
3.0
3.1
Assumptions
1. Base MVAb = 10MVA
2. Generator sub-transient reactance is assumed to be 15%
3. Transformer impedance is 5% (DEP 33.65.40.31)
4. Motor contribution is 20% on SB-403 and SB-411 LV Switchgear
5. Power Factor (Cos ) = 0.8
6. Composite and XLPE cables have same characteristics.
SDA-TPEF-PLI_UGHG1-EA4606-00001-000-A01
7. The distance between the generator house and the switchgear room is short (less than
100m); therefore impedances of all connecting cables between generator and switchgear
have been neglected.
8. The distance between SB-401 and SB-403 is short (less than 100m); therefore impedances
of all connecting cables between the two switchboards have been neglected.
9. All tie breakers are closed and all generating sets running
3.2
Formulae used
The calculations are based on the MVA base systems.
The formulae used are given below:
For Generators:
Zpu =
% impedance rating
BaseMVA
Equation 1
100
Gnererator MVA rating
For Cables:
Zpu = Z
MVAbase
.Equation 2
kV 2
Where applicable, series MVA ratings are combined like parallel impedances while parallel MVA
ratings are combined like series impedances.
i.e. series combination of MVA1 and MVA2 is given as:
MVAT =
MVA1 MVA2
MVA1 + MVA2
.Equation 3
Equation
MVAsc =
MVAbase
Zpu
.Equation 5
Isc =
MVAsc
3 KV
.Equation 6
Ip = 1.8 2 Isc
Zpu =
.Equation 7
Z1 Z 2 Z 3 Z 4
Z 2 Z 3 Z 4 + Z1Z 3 Z 4 + Z1Z 2 Z 4 + Z1Z 2 Z 3
SDA-TPEF-PLI_UGHG1-EA4606-00001-000-A01
Equation 8
4.0
Fault Calculations
4.1
From equation 1,the per unit impedance for each gas generator,
Zpu =
Zpu =
% impedance rating
BaseMVA
100
MVA rating
15 10 = 1.5pu
100 1
1.25MVA Transformer
Zpu =
5
10 = 0.4 pu
100 1.25
The circuit resulting from the above calculation is as shown below in Fig 2:
1.5pu
Generator
0.4pu
Transformer
From equation 8,
Zpu =
Z1 Z 2
Z1 + Z 2
Where Z 1
= 1.5 , Z 2 = 0.4 ,
SDA-TPEF-PLI_UGHG1-EA4606-00001-000-A01
Z pu = 0.32pu
The equivalent circuit resulting from the above calculation is as shown below:
0.32pu
M
L
MVAsc of SB-403
Total MVAsc seen at SB-403 (MVAsc) = Total MVAsc seen at SB-401 + Motor contributions
MVAsc = 31.25MVA and
Isc =
31.25
= 43.48kA (RMS)
3 0.415
In view of the presence of electric motors, applying a factor of 1.2 to allow for motor contributions,
MVAsc = 1.2 x 31.25 =37.5MVA
Isc
SDA-TPEF-PLI_UGHG1-EA4606-00001-000-A01
5.0
MVAsc of SB-411.
For equation 2, the per unit impedance for Cables:
Zpu = Z
MVAbase
kV 2
Z = cable impendance for a 35mm multicore armoured is given as 0.524/km (ABB XLPE Cable
Systems Catalogue)
For 150m of cable,
Zpu = 0.524 0.15
10
0.415 2
= 4.56pu
10
= 2.05
0.32 + 4.56
Isc =
2.05
= 2.85kA (RMS)
3 0.415
In view of the presence of electric motors, applying a factor of 1.2 to allow for motor contributions,
MVAsc = 1.2 x 2.05MVA =2.46MVA
Isc
Using Equation 7,
Peak making current = 1.8x2x3.42 = 8.71kA
Summary of the Fault Level at SB-411
Bus Sections
MVA short
circuit
(MVAsc)
RMS Short
circuit
Current (kA)
SB-411, 415V
2.46
3.42
SDA-TPEF-PLI_UGHG1-EA4606-00001-000-A01
Peak
Asymmetric
Short Circuit
Current (kA)
8.71
Recommended
switchgear
rating (kA)
16kA