Strap Footing
Strap Footing
Strap Footing
Km
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
31.00
32.00
33.00
34.00
35.00
36.00
37.00
38.00
39.00
40.00
41.00
42.00
43.00
44.00
45.00
46.00
47.00
48.00
49.00
50.00
51.00
52.00
53.00
54.00
55.00
56.00
57.00
58.00
S-300
Ks
3.95
3.96
3.96
3.97
3.98
3.98
3.99
4.00
4.02
4.03
4.04
4.05
4.06
4.07
4.08
4.09
4.10
4.11
4.12
4.15
4.17
4.18
4.20
4.21
4.24
4.26
4.29
4.31
4.34
4.36
4.39
4.41
4.46
4.49
4.51
4.56
4.62
4.65
4.67
4.73
Xc
Trial 1
Column2
b2
b1
1.5
m
m
m
m
m
m
m
m
KN/m2
a1
a2
P1
Ws
P2
xs
m
m
R1
e
XR
R2
3.56
For footing 2
R2= 1708.87 KN
2
Area of F2 A(F2)=
5.70 m
a 2=
1.602 m
b 2=
3.56 m
Dimensions of footing 2= 1.602003
X
3.56
q1= 1066.71 KN/m
q2= 1066.71 KN/m
Note: The Distribution per meter run under the pad is the same for each pad.
II) Structural Design
a) Calculation of shear force and bending moment diagram
1763.56
266.68
909.13
xo
xo= 1.8977273
-854.44
-2024.32
33.33
-728.2122445
i) Punching shear
fck=
25 Mpa
fcd=
11.166667 Mpa
fs=
300 Mpa
-1500.06
rmin=
0.002
fctd=
1.167 Mpa
vup=
641.67 Kpa
vud=
385.00 Kpa
ax +bx+c=0
a=
b=
c=
d1
1433.33
1187.50
-2216.00
0.90
d2
d=
D=
-1.72
0.90
933
0.90
1893.81
1893.81
0.00
ok!
b-1) Footing 2
i) Punching shear
Concrete shear resistance=
2*(bc2,1+d+bc2,2)*d*vcp(1)
ok!
D
773
0.00
C) Reinforcement
c-1) Footing 1
i) Direction X (TOP)
Maximum moment=
1887.47 KNm
-1887.47
Km=
48
Ks= 4.36
MIN. REINF
2
2
Asteel =
9181.03357 mm
1793 mm
f 24
452.39 c/c
46.96
ii) Direction Y (BOTTOM)
M=
351.14 Knm/m
Km=
21
Ks= 3.96
MIN. REINF
2
2
Asteel =
1552.59929 mm
1793 mm
f 16
201.06 c/c
100.83
c-1) Footing 2
i) Direction X
Maximum moment=
728.21 KNm
Km=
37
Ks= 4.12
MIN. REINF
2
2
Asteel =
4066.71973 mm
1793 mm
f 20
314.16 c/c
71.71
ii) Direction Y
M=
351.14 KNm/m
Km=
26
Ks= 4.00
MIN. REINF
2
2
Asteel =
1904.99794 mm
1793 mm
f 20
314.16 c/c
141.57
d) Design of strap
Note : the strap should be designed to withstand the shear foce and
moment on the respective diagrams
V=
909.13 KN
M=
-1500.06 KNm
Km=
44
Ks= 4.26
2
Asteel =
7311.50294 mm
f 24
452.39
No.
16.16
Take width of strip, b=
0.50 m
Assome depth, d=
1.00 m
Shear resistance of concrete
VRd= 1300.9167 KN
Vc= 187.36667 KN
2
Shearv=
1873.6667 Kn/m
Thus needs to be designed for shear
f6= 500
mm
Xc
Trial 1
Column2
b2
b1
a1
P1
Ws
P2
xs
a2
R1
XR
R2
2.28
For footing 2
R2= 1213.87 KN
2
Area of F2 A(F2)=
4.05 m
a2= 1.7711 m
b2=
2.28 m
Dimensions of footing 2= 1.771095
X
2.28
q1= 685.38 KN/m
q2= 685.38 KN/m
Note: The Distribution per meter run under the pad is the same for each pad.
II) Structural Design
a) Calculation of shear force and bending moment diagram
1191.06
171.34
584.13
xo
xo= 1.897727
-606.94
-1300.66
21.42
-517.27216
-963.81
i) Punching shear
fck=
25 Mpa
fcd= 11.16667 Mpa
fs=
300 Mpa
rmin=
0.002
fctd=
1.167 Mpa
vup=
641.67 Kpa
vud=
385.00 Kpa
ax2+bx+c=0
a=
b=
c=
d1
1433.33
1187.50
-1397.00
0.66
d2
d=
D=
-1.48
0.66
693
0.66
1184.69
1184.69
0.00
ok!
b-1) Footing 2
i) Punching shear
Concrete shear resistance=
2*(bc2,1+d+bc2,2)*d*vcp(1)
ok!
D
965
0.00
C) Reinforcement
c-1) Footing 1
i) Direction X (TOP)
Maximum moment=
1212.73 KNm
-1212.73
Km=
36
Ks= 4.11
MIN. REINF
2
2
Asteel =
5142.576 mm
1939 mm
f 24
452.39 c/c
80.86
ii) Direction Y (BOTTOM)
M=
118.82 Knm/m
Km=
11
Ks= 3.95
MIN. REINF
2
2
Asteel =
484.2216 mm
1939 mm
f 16
201.06 c/c
93.95
c-1) Footing 2
i) Direction X
Maximum moment=
517.27 KNm
Km=
24
Ks= 3.98
MIN. REINF
2
2
Asteel =
2215.76 mm
1939 mm
f 20
314.16 c/c
124.18
ii) Direction Y
M=
118.82 KNm/m
Km=
12
Ks= 3.95
MIN. REINF
2
2
Asteel =
504.6906 mm
1939 mm
f 16
201.06 c/c
93.95
d) Design of strap
Note : the strap should be designed to withstand the shear foce and
moment on the respective diagrams
V=
584.13 KN
M=
-963.81 KNm
Km=
35
Ks= 4.10
2
Asteel =
4521.303 mm
f 24
452.39
No.
9.99
Take width of strip, b=
0.50 m
Assome depth, d=
1.00 m
Shear resistance of concrete
VRd= 1300.9167 KN
Vc= 187.36667 KN
2
Shearv=
1873.6667 Kn/m
Thus needs to be designed for shear
f6= 500
mm
Xc
Trial 1
Column2
b2
b1
0.6
m
KN
m
m
KN
m
m
m
KN/m2
a1
P1
Ws
P2
xs
m
m
a2
R1
XR
R2
1.2
0.96
For footing 2
R2= 269.99 KN
2
Area of F2 A(F2)=
0.90 m
a2=
1.5 m
b2=
0.60 m
Dimensions of footing 2=
1.5
X
0.60
q1= 286.70 KN/m
q2= 180.00 KN/m
Note: The Distribution per meter run under the pad is the same for each pad.
II) Structural Design
a) Calculation of shear force and bending moment diagram
173.70
43.01
38.71
xo
xo= 0.915
-135.00
-262.33
3.23
-29.028803
-114.18
i) Punching shear
fck=
25 Mpa
fcd= 11.16667 Mpa
fs=
300 Mpa
rmin=
0.002
fctd=
1.167 Mpa
vup=
641.67 Kpa
vud=
385.00 Kpa
ax2+bx+c=0
a=
b=
c=
d1
1433.33
672.92
-282.84
0.27
d2
d=
D=
-0.74
0.27
305
0.27
237.96
237.96
0.00
ok!
b-1) Footing 2
i) Punching shear
Concrete shear resistance=
2*(bc2,1+d+bc2,2)*d*vcp(1)
ok!
D
632
0.00
C) Reinforcement
c-1) Footing 1
i) Direction X (TOP)
Maximum moment=
116.79 KNm
-116.79
Km=
22
Ks= 3.97
MIN. REINF
2
2
Asteel =
923.4001 mm
1195 mm
f 24
452.39 c/c
274.61
ii) Direction Y (BOTTOM)
M=
18.90 Knm/m
Km=
9
Ks= 3.95
MIN. REINF
2
2
Asteel =
148.7063 mm
1195 mm
f 14
153.94 c/c
114.12
c-1) Footing 2
i) Direction X
Maximum moment=
58.35 KNm
Km=
13
Ks= 3.95
MIN. REINF
2
2
Asteel =
385.948 mm
1195 mm
f 20
314.16 c/c
208.17
ii) Direction Y
M=
4.59 KNm/m
Km=
4
Ks= 3.95
MIN. REINF
2
2
Asteel =
30.3872 mm
1195 mm
f 16
201.06 c/c
144.02
d) Design of strap
Note : the strap should be designed to withstand the shear foce and
moment on the respective diagrams
V=
38.71 KN
M=
-114.18 KNm
Km=
12
Ks= #N/A
mm2
Asteel =
#N/A
f 24
452.39
No.
#N/A
Take width of strip, b=
0.50 m
Assome depth, d=
1.00 m
Shear resistance of concrete
VRd= 1300.9167 KN
Vc= 187.36667 KN
2
Shearv=
1873.6667 Kn/m
Thus Provide nominal shear reinforcement!
f6= 500
mm
Xc
Trial 1
Column2
b2
b1
a1
P1
Ws
P2
xs
a2
R1
XR
R2
3.47
For footing 2
R2= 2001.89 KN
2
Area of F2 A(F2)=
6.67 m
a2= 1.9254 m
b2=
3.47 m
Dimensions of footing 2= 1.925449
X
3.47
q1= 1039.70 KN/m
q2= 1039.70 KN/m
Note: The Distribution per meter run under the pad is the same for each pad.
II) Structural Design
a) Calculation of shear force and bending moment diagram
1887.06
259.93
886.11
xo
xo= 1.897727
-1000.94
-1973.07
32.49
-853.08069
-1462.08
i) Punching shear
fck=
25 Mpa
fcd= 11.16667 Mpa
fs=
300 Mpa
rmin=
0.002
fctd=
1.167 Mpa
vup=
641.67 Kpa
vud=
385.00 Kpa
ax2+bx+c=0
a=
b=
c=
d1
1433.33
1187.50
-2158.00
0.88
d2
d=
D=
-1.71
0.88
918
0.88
1843.44
1843.44
0.00
ok!
b-1) Footing 2
i) Punching shear
Concrete shear resistance=
2*(bc2,1+d+bc2,2)*d*vcp(1)
ok!
D
862
0.00
C) Reinforcement
c-1) Footing 1
i) Direction X (TOP)
Maximum moment=
1839.69 KNm
-1839.69
Km=
49
Ks= 4.39
MIN. REINF
2
2
Asteel =
9158.592 mm
1762 mm
f 24
452.39 c/c
47.07
ii) Direction Y (BOTTOM)
M=
330.78 Knm/m
Km=
21
Ks= 3.96
MIN. REINF
2
2
Asteel =
1488.401 mm
1762 mm
f 14
153.94 c/c
80.35
c-1) Footing 2
i) Direction X
Maximum moment=
853.08 KNm
Km=
35
Ks= 4.10
MIN. REINF
2
2
Asteel =
4228.706 mm
1762 mm
f 20
314.16 c/c
69.15
ii) Direction Y
M=
330.78 KNm/m
Km=
23
Ks= 3.98
MIN. REINF
2
2
Asteel =
1590.365 mm
1762 mm
f 16
201.06 c/c
102.42
d) Design of strap
Note : the strap should be designed to withstand the shear foce and
moment on the respective diagrams
V=
886.11 KN
M=
-1462.08 KNm
Km=
43
Ks= 4.24
2
Asteel =
7084.58 mm
f 24
452.39
No.
15.66
Take width of strip, b=
0.50 m
Assome depth, d=
1.00 m
Shear resistance of concrete
VRd= 1300.9167 KN
Vc= 187.36667 KN
2
Shearv=
1873.6667 Kn/m
Thus needs to be designed for shear
f6= 500
mm
Xc
Trial 1
Column2
b2
b1
0.6
m
m
m
m
m
m
m
m
KN/m2
a1
P1
Ws
P2
xs
m
m
a2
R1
XR
R2
1.2
0.96
For footing 2
R2= 269.99 KN
2
Area of F2 A(F2)=
0.90 m
a2=
1.5 m
b2=
0.60 m
Dimensions of footing 2=
1.5
X
0.60
q1= 286.70 KN/m
q2= 180.00 KN/m
Note: The Distribution per meter run under the pad is the same for each pad.
II) Structural Design
a) Calculation of shear force and bending moment diagram
173.70
43.01
38.71
xo
xo= 0.915
-135.00
-262.33
3.23
-29.028803
-114.18
i) Punching shear
fck=
25 Mpa
fcd= 11.16667 Mpa
fs=
300 Mpa
rmin=
0.002
fctd=
1.167 Mpa
vup=
641.67 Kpa
vud=
385.00 Kpa
ax2+bx+c=0
a=
b=
c=
d1
1433.33
672.92
-282.84
0.27
d2
d=
D=
-0.74
0.27
305
0.27
237.96
237.96
0.00
ok!
b-1) Footing 2
i) Punching shear
Concrete shear resistance=
2*(bc2,1+d+bc2,2)*d*vcp(1)
ok!
D
632
0.00
C) Reinforcement
c-1) Footing 1
i) Direction X (TOP)
Maximum moment=
116.79 KNm
-116.79
Km=
22
Ks= 3.97
MIN. REINF
2
2
Asteel =
923.4001 mm
1195 mm
f 14
153.94 c/c
114.12
ii) Direction Y (BOTTOM)
M=
18.90 Knm/m
Km=
9
Ks= 3.95
MIN. REINF
2
2
Asteel =
148.7063 mm
1195 mm
f 14
153.94 c/c
114.12
c-1) Footing 2
i) Direction X
Maximum moment=
58.35 KNm
Km=
13
Ks= 3.95
MIN. REINF
2
2
Asteel =
385.948 mm
1195 mm
f 14
153.94 c/c
114.12
ii) Direction Y
M=
4.59 KNm/m
Km=
4
Ks= 3.95
MIN. REINF
2
2
Asteel =
30.3872 mm
1195 mm
f 14
153.94 c/c
114.12
d) Design of strap
Note : the strap should be designed to withstand the shear foce and
moment on the respective diagrams
V=
38.71 KN
M=
-114.18 KNm
Km=
28
Ks= 4.03
2
Asteel =
1229.572 mm
f 20
314.16
No.
3.91
Take width of strip, b=
0.30 m
Assome depth, d=
0.50 m
Shear resistance of concrete
VRd=
361.8 KN
Vc=
56.21 KN
2
Shearv=
562.1 Kn/m
Thus Provide nominal shear reinforcement!
f6= 250