Given

Column 1 size 30x 40 ,

Reinf. 420

Column 2 size 30x 40cm,

Reinf. 420

Ultimate soil bearing pressure, qult = 100kPa

fyk = 300MPa fyd = 300/1.15 = 260.87 MPa

C25 fck= 20MPafctk = 1.5 MPa,

Required:- Design a strap foundation for the given loads shown in Fig. below.

4
30
1
90 c
0c m
0ma
k 1

1N
5 ae R u
c / 1 lt
m2

6 W
0 S
0c
m
X

X
S

34 2
00
10
a80
kN
2
R
u

lt

SOLUTION

Proportioning of footing

Trial 1

Assume a1 = 3.00m
Then e = (3.00/2)- 0.15 = 1.35m
XR = 6.00-e = 6.00- 1.35 = 4.65m

Neglecting the weight of the strap, the soil reaction R 1 will be determined by taking moment
about R2.
4.65*R1 = 6.00*900 R1 = 1161.30kN
b1 = R1/(a1 ult) = 1161.30 /( 3*100) =3.87, use b1 = 3.90m
Hence dimension of footing 1

3.00 x 3.90m

Now for the second footing

R2 = P1 +P2 R1 = 900+1080 -1161.30=818.70kN


Area of footing = R2/ ult = 818.70/ 100 = 8.19m2
Take a1 =a2 =3.00m
b2 = 8.19/3 =2.73, use b2 = 2.75m
Dimension of footing 2

3.00 X2.75m

q1 = R1/a1 = 1161.30/3.00 = 387.1kN/m


q2= R2/a2 = 818.7 /3.00 = 272.90kN/m
Since the distribution per meter run under the pad is different for each pad, a second trial
should be made

Trial 2

Take a1 = 2.50m
Then e = (2.50/2)- 0.15 = 1.10m
XR = 6.00-e = 6.00- 1.1. = 4.90m
4.90*R1 = 6.00*900 R1 = 1102.04kN
b1 = R1/(a1 ult) = 1102.04 /( 2.50*100) =4.41, use b1 = 4.45m
Dimension of footing 1

2.50 x 4.45m

R2 = P1 +P2 R1 = 900+1080 -1102.04=877.96kN


Area of footing = R2/ ult = 877.96/ 100 = 8.78m2
Take a2 =2.00m ( or use R1/a1 = R2/a2 to determine a2)
b2 = 8.78/2.00 =4.39, use b2 = 4.40m
Dimension of footing 2

2.00 X4.40m

q1 = R1/a1 = 1102.04/2.50 = 440.82kN/m


q2= R2/a2 = 877.96 /2.00 = 438.98kN/m
2

The difference between stress distributions is a small amount. Hence the final proportions of
the footings as shown below would be acceptable.

2
5
4 04
4 30
6
5 90 c
c
0 m
0
0m
0c
q1 = m
k
2
2
N
440.82
5
6
kN/m
0
5

2
0
4
0
34 4
00 0
10
80
kN
2
0
0

6
0
10
0
80
c
k
q1 = m q =
N
2 2
2
440.82 6 438.9
5
2 64
20kN/m 5 8kN/m 0. 1.
0
0
2.
15
0 03
6 05
+ k
6.
0. k
d N
1
15 N
43
2
+
8.
83
kd
98
3.
N783
k
88
.74 73
202 N
k kN- 7.4
.01
Nm 4k
B
kNNM
4.
m
m
D
96
k
Nmof the footings
Thickness

Punching shear

0.4 +3d

9
0
0
k
N

Footing 1

Take d= 0.40m and = min = 0.50/fyk = 0.50 /300 = 0.0017


k1 = ( 1+50) = (1 +50*0.0017) =1.085,

k2 = 1.6 d =1.6 -0.4 = 1.20

u1 = Pr1 =0.90+0.90+1.60 =3.40m

Net shear force developed under column 1


Vd= 900 -*(0.90*1.60), =R1/a1*b1= 99.06kPa
Vd= 900 -99.06*(0.90*1.60) =757.35kN

Punching shear resistance under column 1


Vup = 0.25fctd k1k2ud

(MN)

Vup = 0.25 *1000* 1.085*1.20*3.40*0.40

=442.68kN < V d .. Not OK!

Since the developed shear force is greater than the punching shear resistance, one may
increase the depth
Take d= 0.55m and = min = 0.50/fyk = 0.50 /300 = 0.0017
k1 = ( 1+50) = (1 +50*0.0017) =1.085,

k2 = 1.6 d =1.6 -0.55 = 1.05

u1 = Pr1 =1.125+1.125+2.05=4.30m

Net shear force developed under column 1


Vd= 900 - 99.06 *(1.125*2.05) =671.54kN

Punching shear resistance under column 1


Vup = 0.25 *1000* 1.085*1.05*4.3*0.55 = 673.58kN >V d OK!

Wide beam shear

X- direction

The magnitude of the wide beam shear is read from the shear force diagram at a distance of
d from the face of column 1.
Vd = 440.82 (0.30 +d) -900 = 440.82 (0.30 +0.55) -900=525.30kN
Wide beam shear resistance
Vud = 0.25fctd k1k2 bwd

(MN)

k1 = ( 1+50) = (1 +50*0.0017) =1.085, k2 = 1.60 d =1.60 -0.55 = 1.05


bw = 4.45m
5

Vud = 0.25*1000*1.085 *1.05*4.45*0.55 = 697.08kN > Vd ..OK!

Y- direction

The developed shear force in direction Y may be estimated as for the case of an isolated
footing
Developed shear
1.475m

4.45m

0.55

Vd = 99.06(1.475* 2.50)=365.28kN
Wide beam shear resistance
Vud = 0.25*1000*1.085 *1.05*2.50*0.53= 377.38kN > Vd .............OK!

Footing 2

Punching shear

Take d= 0.40m and = min = 0.50/fyk = 0.50 /300 = 0.0017


k1 = ( 1+50) = (1 +50*0.0017) =1.085,

k2 = 1.60 d =1.60 -0.40 = 1.20

u2 = Pr2 =1.50+1.50+1.60 +1.60 =6.20m


Net shear force developed under column 2
Vd= 1080 -*(1.50*1.60), =R2/a2*b2= 99.77kPa
Vd= 1080 -99.77*(1.50*1.60) =840.55kN
Punching shear resistance under column 2
Vup = 0.25fctd k1k2ud

(MN)

Vup = 0.25 *1000* 1.085*1.20*6.20*0.40 = 807.24 kN < V d .. Not OK! ,

increase the depth.

Take d= 0.45m and = min = 0.50/fyk = 0.50 /300 = 0.0017


6

k1 = ( 1+50) = (1 +50*0.0017) =1.085,

k2 = 1.60 d =1.60 -0.45 = 1.15

u2 = Pr2 =1.65+1.65+1.75+1.75=6.80m

Net shear force developed under column 2


Vd= 1080 - 99.77 *(1.65*1.75) =791.91kN

Punching shear resistance under column 2


Vup = 0.25 *1000* 1.085*1.15*6.80*0.45 =954.53kN >V d OK!

Wide beam shear

X- direction

The wide beam shear is read from the shear force diagram at a distance of d from the face of
column 2.
Vd = 438.98 (1.00+0.20+0.45) -1080 = 355.68kN
Wide beam shear resistance
Vud = 0.25fctd k1k2 bwd

(MN)

k1 = ( 1+50) = (1 +50*0.0017) =1.085 , k2 = 1.60 d =1.60 -0.45 = 1.15


bw = 4.40m
Vud = 0.25*1000*1.085 *1.15*4.40*0.45 = 617.64 > Vd ....OK!

Y- direction

Developed shear

1.55m

4.40
m

0.45

2.00m

Vd = 99.77(1.55* 2.00)=309.29kN
Wide beam shear resistance
Vud = 0.25*1000*1.085 *1.15*2.00*0.43 = 268.27kN < Vd .............NOT OK!
7

Increase the effective depth d to 0.55m


Developed shear
1.45m

4.40
m

0.55

2.00m

Vd = 99.77(1.45* 2.00)=289.33kN
Wide beam shear resistance
Vud = 0.25*1000*1.085 *1.05*2.00*0.53

= 301.90kN >Vd ............ OK!

Moment capacity of concrete

Footing 1
X direction

Capacity of concrete

M 0.32 f cd bd 2
0.32 11.33 103 4.45 0.55
4880.51kN m M max 783.74kN m....Ok !
2

Y- direction

Developed moment

(2.025) 2
M d 99.06 *
* 2.5 507.76kN m
2

Capacity of concrete

M 0.32 f cd bd 2
0.32 11.33 103 2.50 0.53
2546.08kN m M d ....Ok !

Footing 2
X direction

M 0.32 f cd bd 2
0.32 11.33 103 4.40 0.55
4825.67kN m M max 219.49kN m....Ok !
2

Capaci
ty of concrete

Y-direction
Developed moment
9

(2.00) 2
M d 99.77 *
* 2.0 399.08kN m
2

M 0.32 *11.33 x103 * 2.0 * (0.53) 2


2036.86kN m M d...........OK !

Capacity of
concrete

Calculation of Reinforcements
Footing 1
X-direction

f cd
f yd

1 1

2M

f cd bd 2

11.33
2 * 783.74
1

0.0023 min ....ok!

2
260.87
11.33 103 4.45 0.55

As bd 0.0023 445 55 56.29cm 2


From BMD ,
M = 783.74kN-m

10

Use = 20, as = 3.14cm2


No. of bars , n= 56.29/3.14 =17.9 , use 18 bars
Spacing = (445-2*5)/ (n-1) =25.6cm

Use 18 20 c/c 255mm (The reinforcement should be placed at the top)

Provide also minimum bottom reinforcement in the X-direction

Asmin = min bd = 0.0017 *445 *55 =41.61cm2

Use = 14, as = 1.54cm2


No. of bars , n= 41.61/1.54 =27
Spacing = (445-2*5)/ (n-1) =16.73cm

Use 27 14 c/c 165mm

Y-direction

Md =507.76kN-m

11.33
2 * 507.76
0.0029 min ....ok!
1 1
2
260.87
11.33 103 2.50 0.53

As bd 0.0029 250 53 38.425cm 2

Use = 20, as = 3.14cm2


No. of bars , n= 38.425/3.14 =12.2, use 13 bars
Spacing = (250-2*5)/ (n-1) =20cm
Use 13 20 c/c 200mm ( bottom reinforcement)

Provide also minimum top reinforcement in the Y-direction


Asmin = min bd = 0.0017 *250 *53 =22.53cm 2
Use = 14, as = 1.54cm2
No. of bars , n= 22.53/1.54 =14.6 , use 15 bars
Spacing = (250-2*5)/ (n-1) =17.1cm
Use 15 14 c/c 170mm
Footing 2
X-direction

11

11.33
2 * 219.49
1

0.0006 min

2
260.87
11.33 103 4.40 0.55

As min bd 0.0017 440 55 41.14cm 2


From BMD , M = 219.49 kN-m

Use = 20, as = 3.14cm2


No. of bars , n= 41.14/3.14 =13.20, use 14 bars
Spacing = (440-2*5)/ (n-1) =33.08cm
Use 14 20 c/c 330mm (The reinforcement should be placed at the bottom)

Y-direction

11.33
2 * 399.08
1

0.0028 min ..

2
3
260.87
11.33 10 2.00 0.53

As bd 0.0028 200 53 29.68cm 2


Md =399.08kN-m

Use = 20, as = 3.14cm2


No. of bars , n= 29.68/3.14 =9.5 , use 10 bars
Spacing = (250-2*5)/ (n-1) =26.67cm
12

Use 10 20 c/c 265mm (bottom reinforcement)

Development length

Footing 1

ld

X-direction

f yd 2 260.87

130.44cm
4 f bd
4 1

Available development length, la =220-5=215cm > ld .. OK!

ld

f yd 2 260.87

130.44cm
4 f bd
4 1

Y-direction

Available development length, la =202.5-5=197.5cm > ld OK!

Footing 2

ld

f yd 2 260.87

130.44cm
4 f bd
4 1

X-direction

Available development length, la =80-5=75cm < ld NOT OK!


Bend the bars upward with a minimum length of .cm

Y-direction

f yd 2 260.87
ld

130.44cm
4 f bd
4 1
13

Available development length, la =200-5=195cm > ld OK!