Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
0% found this document useful (0 votes)
93 views

Example FAST

This document contains graphs and calculations related to analyzing the seismic response of two structural systems (System 1 and System 2). It provides aerodynamic load and seismic displacement data and calculates the shear forces, bending moments, base shear forces and base moments for each system under different seismic conditions. The results are then compared between the two systems to analyze their responses.

Uploaded by

abhinavka123
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
93 views

Example FAST

This document contains graphs and calculations related to analyzing the seismic response of two structural systems (System 1 and System 2). It provides aerodynamic load and seismic displacement data and calculates the shear forces, bending moments, base shear forces and base moments for each system under different seismic conditions. The results are then compared between the two systems to analyze their responses.

Uploaded by

abhinavka123
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Finput

Foutput
Foutput

Fbase

Gravity

=Fbase

Gravity

Fbase_x

Fbase_x
Seismic disp.

Seismic disp.

Aerodynamic load Finput (N)

Seismic displacement (m)

20000000

0.8

15000000

0.6

10000000

0.4

5000000

0.2

0
0

0.2

0.4

0.6

0.8

1.2

1.4

1.6

0
0

5000000

0.2

10000000

0.4

15000000

0.6

20000000

0.8

0.5

1.5

allinNand m.

Finput

Finput

Foutput_0

Foutput_1

Gravity

Gravity

Fbase_0

Foutput_0
Foutput_2
Gravity

Fbase_0

Fbase_0
Seismicdisp_x

F_output refers to shear forces,vertical forces and bending moments.Thevertical forces


are notreported here butincluded inthe calculations.
Topmoment:System0

Topshear force:System0
5.00E+05

3.00E+07

0.00E+00
0.00E+00 1.00E01 2.00E01 3.00E01 4.00E01 5.00E01 6.00E01
5.00E+05

2.50E+07
2.00E+07

1.00E+06
1.50E+07
1.50E+06

0
1.00E+07

2.00E+06
2.50E+06
3.00E+06
3.50E+06

5.00E+06
0.00E+00
0.00E+00 1.00E01 2.00E01 3.00E01 4.00E01 5.00E01 6.00E01
5.00E+06

Comparison responses System1and 2


Basemoment

Baseshear force

3.00E+08

3.00E+07

2.50E+08
2.00E+07

2.00E+08
1.50E+08

1.00E+07

1.00E+08

0.00E+00
0.00E+00 1.00E01 2.00E01 3.00E01 4.00E01 5.00E01 6.00E01
1.00E+07

1
2

2.00E+07

5.00E+07

0.00E+00
0.00E+00 1.00E01 2.00E01 3.00E01 4.00E01 5.00E01 6.00E01
5.00E+07
1.00E+08

3.00E+07

1.50E+08
2.00E+08

4.00E+07

Topmoment

Topshear force

1.20E+08

1.00E+07

1.00E+08
8.00E+07

5.00E+06

6.00E+07
0.00E+00
0.00E+001.00E012.00E013.00E014.00E015.00E016.00E01
5.00E+06
1.00E+07

4.00E+07
1
2

2.00E+07
0.00E+00
0.00E+001.00E012.00E013.00E014.00E015.00E016.00E01
2.00E+07
4.00E+07
6.00E+07

1.50E+07

8.00E+07

1
2

You might also like