The document analyzes the shear forces, bending moments, and seismic displacement of two structural systems (System 1 and System 2) under different aerodynamic loads. Graphs show the top and base shear forces and moments over time for each system, as well as comparisons of the responses between the two systems. The analysis found that System 1 experienced larger shear forces and moments than System 2.

Uploaded by

Vishnu Gaidhani
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views

Example

The document analyzes the shear forces, bending moments, and seismic displacement of two structural systems (System 1 and System 2) under different aerodynamic loads. Graphs show the top and base shear forces and moments over time for each system, as well as comparisons of the responses between the two systems. The analysis found that System 1 experienced larger shear forces and moments than System 2.

Uploaded by

Vishnu Gaidhani
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

Finput

Foutput
Foutput

Fbase

Gravity

=Fbase

Gravity

Fbase

Fbase

Seismic disp.

Seismic disp.

Aerodynamic load Finput (N)

Seismic displacement (m)

20000000

0.8

15000000

0.6

10000000

0.4

5000000

0.2

0
0

0.2

0.4

0.6

0.8

1.2

1.4

1.6

0
0

5000000

0.2

10000000

0.4

15000000

0.6

20000000

0.8

0.5

1.5

allinNand m.

Finput

Finput

Foutput_0

Foutput_1

Gravity

Gravity

Fbase

Foutput_0
Foutput_2
Gravity

Fbase

Fbase
Seismicdisp_x

Seismicdisp_x

F_output refers to shear forces,vertical forces and bending moments.Thevertical forces


are notreported here butincluded inthe calculations.
Topmoment:System0

Topshear force:System0
5.00E+05

3.00E+07

0.00E+00
0.00E+00 1.00E01 2.00E01 3.00E01 4.00E01 5.00E01 6.00E01
5.00E+05

2.50E+07
2.00E+07

1.00E+06
1.50E+07
1.50E+06

0
1.00E+07

2.00E+06
2.50E+06
3.00E+06
3.50E+06

5.00E+06
0.00E+00
0.00E+00 1.00E01 2.00E01 3.00E01 4.00E01 5.00E01 6.00E01
5.00E+06

Attempt1

Attempt1

Comparison responses System1and 2


Basemoment

Baseshear force

3.00E+08

3.00E+07

2.50E+08
2.00E+07

2.00E+08
1.50E+08

1.00E+07

1.00E+08

0.00E+00
0.00E+00 1.00E01 2.00E01 3.00E01 4.00E01 5.00E01 6.00E01
1.00E+07

1
2

2.00E+07

5.00E+07

0.00E+00
0.00E+00 1.00E01 2.00E01 3.00E01 4.00E01 5.00E01 6.00E01
5.00E+07
1.00E+08

3.00E+07

1.50E+08
2.00E+08

4.00E+07

Topmoment

Topshear force

1.20E+08

1.00E+07

1.00E+08
8.00E+07

5.00E+06

6.00E+07
0.00E+00
0.00E+001.00E012.00E013.00E014.00E015.00E016.00E01
5.00E+06
1.00E+07

4.00E+07
1
2

2.00E+07
0.00E+00
0.00E+001.00E012.00E013.00E014.00E015.00E016.00E01
2.00E+07
4.00E+07
6.00E+07

1.50E+07

8.00E+07

1
2

Finput

Foutput_1

Foutput_1

Foutput_2
Gravity

Gravity

Fbase

Fbase

Seismicdisp_x

Seismicdisp_x

F_output refers to shear forces,vertical forces and bending moments.Thevertical forces


are notreported here butincluded inthe calculations.
Topmoment:System1

Topshear force:System1
5.00E+05

3.00E+07

0.00E+00
0.00E+00 1.00E01 2.00E01 3.00E01 4.00E01 5.00E01 6.00E01
5.00E+05

2.50E+07
2.00E+07

1.00E+06
1.50E+07
1.50E+06

0
1.00E+07

2.00E+06
2.50E+06
3.00E+06
3.50E+06

5.00E+06
0.00E+00
0.00E+00 1.00E01 2.00E01 3.00E01 4.00E01 5.00E01 6.00E01
5.00E+06

Attempt2

Attempt2

Comparison responses System1and 2


Basemoment

Baseshear force
4.00E+07

2.50E+08

3.00E+07

2.00E+08
1.50E+08

2.00E+07

1.00E+08
1.00E+07
1

0.00E+00
0.00E+00 1.00E01 2.00E01 3.00E01 4.00E01 5.00E01 6.00E01
1.00E+07

5.00E+07
0.00E+00
0.00E+00 1.00E01 2.00E01 3.00E01 4.00E01 5.00E01 6.00E01
5.00E+07

2.00E+07

1.00E+08

3.00E+07

1.50E+08

4.00E+07

2.00E+08

1
2

Topmoment

Topshear force

1.00E+08

1.50E+07

8.00E+07
1.00E+07

6.00E+07
4.00E+07

5.00E+06
0.00E+00
0.00E+001.00E012.00E013.00E014.00E015.00E016.00E01
5.00E+06

1
2

2.00E+07
0.00E+00
0.00E+001.00E012.00E013.00E014.00E015.00E016.00E01
2.00E+07
4.00E+07

1.00E+07
1.50E+07

6.00E+07
8.00E+07

1
2

Finput

Foutput_1

Foutput_1

Foutput_2
Gravity

Gravity

Fbase

Fbase

Seismicdisp_x

Seismicdisp_x

F_output refers to shear forces,vertical forces and bending moments.Thevertical forces


are notreported here butincluded inthe calculations.
Topmoment:System1

Topshear force:System1
5.00E+05

3.00E+07

0.00E+00
0.00E+00 1.00E01 2.00E01 3.00E01 4.00E01 5.00E01 6.00E01
5.00E+05

2.50E+07
2.00E+07

1.00E+06
1.50E+07
1.50E+06

0
1.00E+07

2.00E+06
2.50E+06
3.00E+06
3.50E+06

5.00E+06
0.00E+00
0.00E+00 1.00E01 2.00E01 3.00E01 4.00E01 5.00E01 6.00E01
5.00E+06

Attempt3

Attempt3

Comparison responses System1and 2


Basemoment

Baseshear force

2.50E+08
3.00E+07
2.00E+08
2.00E+07

1.50E+08

1.00E+07

1.00E+08
5.00E+07

0.00E+00
0.00E+001.00E01 2.00E01 3.00E01 4.00E01 5.00E01 6.00E01
1.00E+07

1
2

2.00E+07

0.00E+00
0.00E+00 1.00E01 2.00E01 3.00E01 4.00E01 5.00E01 6.00E01
5.00E+07

1
2

1.00E+08
1.50E+08

3.00E+07

2.00E+08

4.00E+07

Topmoment

Topshear force

1.00E+08

1.50E+07

8.00E+07
1.00E+07

6.00E+07
4.00E+07

5.00E+06
0.00E+00
0.00E+001.00E012.00E013.00E014.00E015.00E016.00E01
5.00E+06

1
2

2.00E+07
0.00E+00
0.00E+001.00E012.00E013.00E014.00E015.00E016.00E01
2.00E+07
4.00E+07

1.00E+07
1.50E+07

6.00E+07
8.00E+07

1
2

You might also like