TABLE of CONTENTS
1.0
2.0
3.0
SCOPE OF WORK
1.1
Introduction
1.2
Scope
1.3
1.4
Scaffolding
TCO Specifications
2.2
TCO Procedures
2.3
General
2.4
ATTACHMENTS
ATTACHMENT A
ATTACHMENT B
ATTACHMENT C
ATTACHMENT D
ATTACHMENT E
Page 3 of 27
O:\Projects\Capprojs\PROJECTS\Pr078-10 2D-501.1 REPLACEMENT\12 Construction\12.3 Job Packs\12.3.2 Civil & Structural Job
Packs\2-500_1-S-JPK-10002
1.0
SCOPE OF WORK
1.1
INTRODUCTION
Tengizchevroil, a joint venture Company between Chevron, Exxon-Mobil, LUKoil,
and the Kazakhstan Government (hereinafter known as the TCO), intends to
replace the existing 2D-501.1 vessel with a new one.
This Job Pack is for the construction of a slab with protective bund to collect service
water from 2D-501.1.
The design comprises a concrete bund around the perimeter of a concrete slab.
The slab has a slope for draining technical water to a sump which drains to an
existing K3 manhole. A penstock in the sump will control the discharge. Joints
between the existing foundations and new slab are sealed with a polysulfide
sealant.
1.2
SCOPE
This scope of work shall be read in conjunction with the TCO Project Drawings, the
documentation referenced in Section 2 of this scope of work, as well as revision 3
of Addendum to Standard Job Pack for all disciplines FE-A-JP-0001. By reference
hereinafter, these drawings and documentation form an integral part of the WORK
to be performed by the CONTRACTOR. The scope of work shall essentially
comprise the following:
Page 4 of 27
O:\Projects\Capprojs\PROJECTS\Pr078-10 2D-501.1 REPLACEMENT\12 Construction\12.3 Job Packs\12.3.2 Civil & Structural Job
Packs\2-500_1-S-JPK-10002
8. The CONTRACTOR shall compact the soil at the bottom of excavation, lay
geotextile membrane and structural fill compacted in layers of 300mm. Structural fill
will be available from the TCO borrow pit within 20km of the site. The
CONTRACTOR shall provide the material transportation.
9. The CONTRACTOR shall place 50mm of blinding concrete then install waterproof
membrane as shown on the drawings.
10. The CONTRACTOR shall provide and install all formwork required to neatly cast
the concrete slab and bund to the dimensions and falls as shown on the project
drawings. Slab should provide a continuous fall to the sump.
11. The CONTRACTOR shall bend and install the reinforcement bars and cast in items
to the dimensions shown on the project drawings.
12. The CONTRACTOR shall install compressible bitumen impregnated filler board at
locations where slab is adjacent the existing foundations, in accordance with the
project drawings.
13. The CONTRACTOR shall cast concrete and manufacture and test concrete test
cubes and maintain records in accordance with specification Q-ST-2020. It is the
CONTRACTORS responsibility to ensure that the concrete is correctly cured after
casting.
14. The CONTRACTOR shall coat all concrete from a depth of 150mm below ground
and up to 300mm above ground with a low viscosity primer followed by two coats of
light grey coloured epoxy paint with an overall thickness of 250 microns.
15. The CONTRACTOR shall coat the surfaces of all concrete below ground with 3
coats of modified bitumen to give a total thickness of 1.0mm, overlapping the epoxy
coating by 75mm.
16. The CONTRACTOR shall install
manufacturers recommendations.
gateway
penstock
in
accordance
with
17. The CONTRACTOR shall seal all concrete joints with pouring grade polysulphide
sealant in accordance with manufacturers instructions and as shown on the project
drawings.
18. The CONTRACTOR shall break out an opening in the wall of existing manhole and
install a section of GRE pipe with puddle flange, using hydrophilic sealant around
the pipe. Cast EMACO S88CT concrete repair mortar around the pipe. Coat
external face of concrete with 3 coats of modified bitumen to give a total thickness
of 1 mm.
19. The CONTRACTOR shall lay GRE (glass reinforced epoxy) pipe from the sump to
the existing sewer manhole with continuous falls minimum, 1 in 100. Pipe to be
bedded and surrounded with 6mm granular material wrapped in geotextile as
shown on TCO Standard drawing L-ST-2000. Carry out pipe testing prior to
backfilling trench.
20. The CONTRACTOR shall backfill pipe trench and around the manholes with
selected excavated material, compacting in layers to achieve 95% modified Proctor.
Place detectable green marker tape above pipeline.
21. The CONTRACTOR shall remove all debris, construction materials tools etc are
removed from site and ensure that the site is left in a clean and tidy state.
Page 5 of 27
O:\Projects\Capprojs\PROJECTS\Pr078-10 2D-501.1 REPLACEMENT\12 Construction\12.3 Job Packs\12.3.2 Civil & Structural Job
Packs\2-500_1-S-JPK-10002
Earthing system
(1) CONTRACTOR shall perform all necessary installation works detailed herein and
shall coordinate with TCO Construction Group Representative.
(2) CONTRACTOR shall excavate new trench for installation earth cable according
drawing 2-500_1-P-5154. Install new earthing cable into the trench.
(3) CONTRACTOR shall connect new cable to existing earth circuit in two points - in
the earth pit P3 and in location near from the point connection stair to earth system
(4) CONTRACTOR shall backfill the new trench after completion of all activities related
with installation new earth cable.
B)
As Built Mark up
(1) CONTRACTOR shall perform As Built mark ups (in Red) of any changes made at
site with respect to the AFC Drawings / Documents.
(2) Other drawings which do not require any updates will have a NO CHANGE remark.
(3) CONTRACTOR shall provide all required checking and testing protocols. All
protocols to be submitted when completed and in a timely manner.
(4) A set of completed as-built documents shall be handed over to Design Engineering
TCOV
Page 6 of 27
O:\Projects\Capprojs\PROJECTS\Pr078-10 2D-501.1 REPLACEMENT\12 Construction\12.3 Job Packs\12.3.2 Civil & Structural Job
Packs\2-500_1-S-JPK-10002
1.3
1.3.2
COMMUNICATION
1.4 SCAFFOLDING
1.4.1 CONTRACTOR shall supply all scaffolding materials needed to perform the
work, including fireproof scaffolding boards etc., per TCO requirements. All necessary
scaffolding materials needed to perform the work shall be in compliance with the
requirements of TCOs Safety Instruction SI-152.
Page 7 of 27
O:\Projects\Capprojs\PROJECTS\Pr078-10 2D-501.1 REPLACEMENT\12 Construction\12.3 Job Packs\12.3.2 Civil & Structural Job
Packs\2-500_1-S-JPK-10002
2.0
2.1
Latest
TCO SPECIFICATIONS
Specification No.
Title
Q-ST-2016
X-ST-2000
S-ST-2001
S-ST-2002
Earthworks
Q-ST-2020
M-ST-2002
M-ST-2003
L-ST-2002
2.2
Rev. No.
TCO PROCEDURES
Document No.
X-000-A-PRO-0011
(former C001)
X-000-A-PRO-0012
(former C002)
Q 003
Title
Rev. No.
Page 8 of 27
O:\Projects\Capprojs\PROJECTS\Pr078-10 2D-501.1 REPLACEMENT\12 Construction\12.3 Job Packs\12.3.2 Civil & Structural Job
Packs\2-500_1-S-JPK-10002
2.3
GENERAL
Document No.
A-ST-2008
A-ST-2010
TSID
O-ST-2011
2.4
Title
Rev. No.
1
2
4
0
Document No.
SN RK 1.03-14-2011
SN RK 1.03-00-2011
SNIP RK 2.02-05-2009
SNIP RK 5.04-18-2002
Title
Rev. No.
Latest
Latest
Latest
Latest
Page 9 of 27
O:\Projects\Capprojs\PROJECTS\Pr078-10 2D-501.1 REPLACEMENT\12 Construction\12.3 Job Packs\12.3.2 Civil & Structural Job
Packs\2-500_1-S-JPK-10002
3.0
ATTACHMENTS
ATTACHMENT "A"
(Input by Discipline Engineer)
Project Drawings (For Construction)
Drawing No.
2-500_1-S-5018
Rev. No.
0
2-500_1-S-5019
2-500_1-S-5020
2-500_1-P-5154
Drawing Title
DRAINAGE LAYOUTS. PLAN ON BUNDING FOR
2D-501.1
DRAINAGE DETAILS. DETAILS OF BUNDING
FOR 2D-501.1
DRAINAGE DETAILS. RS DETAILS BUNDING
FOR 2D-501.1
EARTHING LAYOUT. NEW COOLING TOWER
2D-501.1
Page 10 of 27
O:\Projects\Capprojs\PROJECTS\Pr078-10 2D-501.1 REPLACEMENT\12 Construction\12.3 Job Packs\12.3.2 Civil & Structural Job
Packs\2-500_1-S-JPK-10002
ATTACHMENT "B"
TCO Standard Drawings (For Construction)
Drawing No.
L-ST-2000
Rev. No.
0
Drawing Title
PIPE DETAILS. PIPE BEDDING
Drawing No.
P-ST-5028
Rev. No.
0
Drawing Title
EARTHING OF STRUCTURES
Page 11 of 27
O:\Projects\Capprojs\PROJECTS\Pr078-10 2D-501.1 REPLACEMENT\12 Construction\12.3 Job Packs\12.3.2 Civil & Structural Job
Packs\2-500_1-S-JPK-10002
ATTACHMENT "C"
Index for Scope of Work
ACT No.
CQI 1203
CQI 1204
CQI 1205
ACTTitle
PRECONCRETE
CONCRETE POUR CARD
CONCRETE COMPRESSIVE STRENGTH
Page 12 of 27
O:\Projects\Capprojs\PROJECTS\Pr078-10 2D-501.1 REPLACEMENT\12 Construction\12.3 Job Packs\12.3.2 Civil & Structural Job
Packs\2-500_1-S-JPK-10002
ATTACHMENT "D"
(Input by FE Turnover Group)
Turnover Status Report
(Only in AFC Job Pack for Contractor and Construction Representative)
Page 13 of 27
O:\Projects\Capprojs\PROJECTS\Pr078-10 2D-501.1 REPLACEMENT\12 Construction\12.3 Job Packs\12.3.2 Civil & Structural Job
Packs\2-500_1-S-JPK-10002
ATTACHMENT "E"
Purchase Orders / Material Requisitions / MWRs
PO / MR No.
Title / Description
PO200938,PO200939, DRAINAGE MATERIALS
PO201115,PO205740
PR21378489
EARTHING MATERIALS
Date in Tengiz
Page 14 of 27
O:\Projects\Capprojs\PROJECTS\Pr078-10 2D-501.1 REPLACEMENT\12 Construction\12.3 Job Packs\12.3.2 Civil & Structural Job
Packs\2-500_1-S-JPK-10002
1.0
2.0
3.0
1.1
1.2
1.3
1.4
2.1
2.2
2.3
2.4
""
"D"
/ /
Page 15 of 27
O:\Projects\Capprojs\PROJECTS\Pr078-10 2D-501.1 REPLACEMENT\12 Construction\12.3 Job Packs\12.3.2 Civil & Structural Job
Packs\2-500_1-S-JPK-10002
1.0
1.1
,
, ,
( ), 2D-501.1 .
2D-501.1.
.
K-3.
.
1.2
, 2
, 3
c FE-A-JP-0001.
,
. :
1.2.1
1.
- -
2.
() .
.
3.
.
4. 8
0.5 .
600
;
.
5.
,
, , ,
, .
Page 16 of 27
O:\Projects\Capprojs\PROJECTS\Pr078-10 2D-501.1 REPLACEMENT\12 Construction\12.3 Job Packs\12.3.2 Civil & Structural Job
Packs\2-500_1-S-JPK-10002
6. ,
.
.
7. (,
, . .),
, .
8. ,
300.
, ,
, 20 .
.
9. 50
, .
10. ,
,
. .
11.
, .
12.
,
, .
13. ,
Q-ST-2020.
.
14. 150
300
-
. 250 .
15. ,
, ,
1,0 , 75 .
16.
.
17.
,
.
Page 17 of 27
O:\Projects\Capprojs\PROJECTS\Pr078-10 2D-501.1 REPLACEMENT\12 Construction\12.3 Job Packs\12.3.2 Civil & Structural Job
Packs\2-500_1-S-JPK-10002
18.
,
.
.
;
1.
19.
1 100.
6 , ,
L-ST-2000.
.
20.
,
95% .
.
21. ,
, ..
.
1.2.2
,
.
2D-501.1
.
:
-.
-
.
.
.
1.2.2.1
/ ACOP .
.
, .
Page 18 of 27
O:\Projects\Capprojs\PROJECTS\Pr078-10 2D-501.1 REPLACEMENT\12 Construction\12.3 Job Packs\12.3.2 Civil & Structural Job
Packs\2-500_1-S-JPK-10002
1.2.2.2
)
(1) ,
.
(2)
2-500_1-P-5154.
.
(3)
P3
.
(4)
.
(1) (),
, /,
- .
(2) , ,
.
(3)
.
.
(4)
.
1.3
1.3.1
(
)
A) ,
(), ,
.
,
,
.
.
B)
.
,
,
, ,
Page 19 of 27
O:\Projects\Capprojs\PROJECTS\Pr078-10 2D-501.1 REPLACEMENT\12 Construction\12.3 Job Packs\12.3.2 Civil & Structural Job
Packs\2-500_1-S-JPK-10002
. ,
.
.
.
1.3.2
:
( )
, A5, . 236
Tengiz , Kazakhstan
Tel #: (8)712-302-5808
E-Mail: tkaya@tengizchevroil.com
/
( )
, B7, . 115
Tengiz, Kazakhstan
Tel #: (8)712-302-7331
E-Mail: fece5@tengizchevroil.com
.
12-378
.
1.4
1.4.1 ,
, ..,
. ,
,
-152.
Page 20 of 27
O:\Projects\Capprojs\PROJECTS\Pr078-10 2D-501.1 REPLACEMENT\12 Construction\12.3 Job Packs\12.3.2 Civil & Structural Job
Packs\2-500_1-S-JPK-10002
2.0
FE-A-JP-0001
2.1
Q-ST-2016
X-ST-2000
S-ST-2001
S-ST-2002
Q-ST-2020
M-ST-2002
M-ST-2003
L-ST-2002
2.2
X-000-A-PRO-0011
( C001)
X-000-A-PRO-0012
( C002)
Q 003
(
)
, ,
Page 21 of 27
O:\Projects\Capprojs\PROJECTS\Pr078-10 2D-501.1 REPLACEMENT\12 Construction\12.3 Job Packs\12.3.2 Civil & Structural Job
Packs\2-500_1-S-JPK-10002
2.3
A-ST-2008
A-ST-2010
TSID
O-ST-2011
2.4
1
2
4
0
1.03-14-2011
K 2.02-05-2009
.
,
5.01-01-2002
K 5.04-18-2002
K 1.03-00-2011
2.01-19-2004
Page 22 of 27
O:\Projects\Capprojs\PROJECTS\Pr078-10 2D-501.1 REPLACEMENT\12 Construction\12.3 Job Packs\12.3.2 Civil & Structural Job
Packs\2-500_1-S-JPK-10002
3.0
"A"
( )
2-500_1-S-5018
.
0
2-500_1-S-5019
2-500_1-S-5020
2-500_1-P-5154
. 2D501.1
. 2D501.1
.
2D-501.1
.
2D-501.1
( )
( )
( )
Page 23 of 27
O:\Projects\Capprojs\PROJECTS\Pr078-10 2D-501.1 REPLACEMENT\12 Construction\12.3 Job Packs\12.3.2 Civil & Structural Job
Packs\2-500_1-S-JPK-10002
"B"
( )
L-ST-2000
.
0
( )
P-ST-5028
.
0
Page 24 of 27
O:\Projects\Capprojs\PROJECTS\Pr078-10 2D-501.1 REPLACEMENT\12 Construction\12.3 Job Packs\12.3.2 Civil & Structural Job
Packs\2-500_1-S-JPK-10002
"C"
-
( )
.
CQI 1203
CQI 1204
CQI 1205
Page 25 of 27
O:\Projects\Capprojs\PROJECTS\Pr078-10 2D-501.1 REPLACEMENT\12 Construction\12.3 Job Packs\12.3.2 Civil & Structural Job
Packs\2-500_1-S-JPK-10002
"D"
( - )
-
(
,
.)
Page 26 of 27
O:\Projects\Capprojs\PROJECTS\Pr078-10 2D-501.1 REPLACEMENT\12 Construction\12.3 Job Packs\12.3.2 Civil & Structural Job
Packs\2-500_1-S-JPK-10002
"E"
/ /
PO / MR
PO200938,PO200939,
PO201115,PO205740
PR21378489
Page 27 of 27
The current revision 15 of St. Job Pack FE-S-JP-0001 was approved by TCO FE Constr. Supt. on 24-Aug- 2012
Engineers file name for this project is: O:\Projects\Capprojs\PROJECTS\A_Standard Job Packs\01Civil.Std.JP_FE-S-JP-0001