Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Friction Losses Estimation For Level 1 Office Desmoke Fan

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 4

Friction Losses Estimation for Level 1 Office Desmoke Fan

Path
Q(cfm)
A(inches) B(inches) DE(equilvalent diameter,inches)
a-b
3,820
24
14
19.86
b-c
7,640
28
18
24.39
c-d
15,280
30
28
31.68
d-e
22,920
38
30
36.85
e-f
30,560
40
36
41.47
f-g
38,200
44
40
45.85
g-h
19,100
42
24
34.37

DP(inches h20/100ft)
0.21
0.28
0.28
0.29
0.27
0.25
0.29

Duct Length(m)
5.70
10.20
12.60
7.80
10.20
21.00
19.20

VCD / Damper
Elbow / Fitting
Ducting Transformation
Intake / Suction Pressure
Total friction losses
Safety factor
Selected Fan Static Pressure

Duct Friction Loss(inches h20)

duct velocity(fpm)
1,637.14
2,182.86
2,619.43
2,895.16
3,056.00
3,125.45
2,728.57

0.04
0.09
0.12
0.07
0.09
0.17
0.18

0.500
0.100
0.500
0.500

25%

2.37
0.59
2.97

2 elbow

inches h20
inches h20

Friction Losses Estimation for Level 1 WAREHOUSE Desmoke Fan


Path
Q(cfm)
A(inches) B(inches) DE(equilvalent diameter,inches)
a-b
16,760
128
40
75.15
b-c
16,760
28
40
36.44
c-d
33,520
48
40
47.85
d-e
50,280
52
40
49.75
e-f
67,040
70
40
57.29
f-g
67,040
70
40
57.29
g-h
33,520
80
64
78.10

DP(inches h20/100ft)
0.00
0.17
0.16
0.28
0.24
0.24
0.01

Duct Length(m)
1.80
11.40
9.10
8.50
13.00
34.00
1.00

VCD / Damper
Elbow / Fitting
Ducting Transformation
Intake / Suction Pressure
Total friction losses
Safety factor
Selected Fan Static Pressure

Duct Friction Loss(inches h20)

duct velocity(fpm)
471.38
2,154.86
2,514.00
3,480.92
3,447.77
3,447.77
942.75

0.00
0.06
0.05
0.08
0.10
0.27
0.00

0.500
0.150
0.500
0.500

35%

2.21
0.77
2.99

(3 elbow)

inches h20
inches h20

Friction Losses Estimation for Level 2 PRODUCTION FLOOR Desmoke Fan


Path
Q(cfm)
A(inches)
B(inches)
DE(equilvalent diameter,inches)
a-b
4,800
36
10
19.77
b-c
11,550
40
18
28.77
c-d
18,300
40
24
33.60
d-e
25,050
40
30
37.77
e-f
31,800
44
36
43.45

DP(inches h20/100ft)
0.34
0.27
0.30
0.30
0.23

Duct Length(m)
35.90
15.60
14.40
13.20
15.80

Duct Friction Loss(inches h20)

VCD / Damper
Elbow / Fitting
Ducting Transformation
Intake / Suction Pressure

0.500
0.080
0.700
0.500

Total friction losses


Safety factor
Selected Fan Static Pressure

Elbow Losses
Qty
Q(cfm)
1
4,800
1
31,300

A(inches)
36
44

B(inches)
10
34

DE(equilvalent diameter,inches)
19.77
42.19

DP(inches h20/100ft)
0.34
0.26

duct velocity(fpm)
1,920.00
2,310.00
2,745.00
3,006.00
2,890.91

0.40
0.14
0.14
0.13
0.12

10%

Equivalen Length
4.50
4.50

2 elbow
5 transformation

2.71

inches h20

0.27
2.98

inches h20

Duct Friction Loss(inches h20)


0.05
0.04

Friction Losses Estimation for Level 4 PRODUCTION FLOOR Desmoke Fan


Path
Q(cfm)
A(inches)
B(inches)
a-b
5,297
24
b-c
29,429
56
c-d
29,429
40
d-e
36,054
40
e-f
31,300
44

24
29
24
30
34

DE(equilvalent diameter,inches)
25.84
43.26
33.60
37.77
42.19

DP(inches h20/100ft)
0.105596771651
0.207
0.74
0.60
0.26

Duct Length(m)

Duct Friction Loss(inches h20)


35.90
16.80
13.20
13.20
15.80

VCD / Damper
Elbow / Fitting
Ducting Transformation
Intake / Suction Pressure

0.500
0.080
0.700
0.500
Total friction losses

Safety factor

2.73
0.27
3.01

10%
Selected Fan Static Pressure

Elbow Losses
Path
Q(cfm)
a-b
e-f

A(inches)
4,800
31,300

Transformation losses
Path
angle(degree)
b-c
16

Q(CFM)
5,297

B(inches)
36
44

v2(fpm)

10
34

v1(fpm)
2,285

1,714

DP(in H20/100ft)
0.10000000

DE(equilvalent diameter,inches)
26.1236644

DE(equilvalent diameter,inches)
19.77
42.19

DP(inches h20/100ft)

Duct Friction Loss(inches h20)

0.34
0.26

1.00

A(inches)

Equivalen Length(ft)
7.00
24.00

2 elbow
5 transformation

inches h20
inches h20

Duct Friction Loss(inches h20)


0.02
0.06

0.14

B(inches)
2.00
4.00
6.00
8.00
10.00
12.00
14.00
16.00
18.00
20.00
22.00
24.00
26.00
28.00
30.00
32.00
34.00

duct velocity(fpm)
1,364.81
2,633.36
4,414.35
4,326.48
3,012.83

0.12
0.11
0.32
0.26
0.14

DE(equilvalent diameter,inches)

DP
19.70

A
0.412

18.02

area
304.86

324.72

You might also like