Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Configuring Active Power Control

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Configuring Active Power Control

This section describes how to activate, verify, and deactivate the optional feature GBFD117602 Active Power Control.

Prerequisites

Dependencies on Hardware
This feature does not have any special requirements for hardware.

Dependencies on Other Features


This feature does not depend on other features.

License
The license controlling this feature has been activated.

Context
Active Power Control enables the immediate performance of power control after an MS
successfully gains access to the network or a handover is successfully performed in the BSC. In
such a case, the BSC can control the uplink and downlink power promptly. Therefore, both the
BTS and the MS transmit signals at a proper power. With the active power control, the system
interference is decreased, the QoS is ensured, and the power consumption of the MS or BTS is
decreased.

Procedure

Activation Procedure
1.

Run the BSC6900 MML command SET GCELLPWRBASIC. In this step,


set Power Forecast Allowed to YES(Yes).

2.

Run the BSC6900 MML command SET GCELLBASICPARA. In this step, set UL
PC Allowed to YES(Yes), and set DL PC Allowed to YES(Yes).

Verification Procedure
1.

Run the BSC6900 MML command SET GTRXCHANADMSTAT. In this step,


specify TRX ID and Channel No., and then set Administrative
State toLock(Lock) to block all TCHs on the BCCH TRX of cell 0 except SDCCH.

2.

Perform the single user CS trace by referring toTracing CS Domain Messages of


a Single Subscriber in cell 0.

3.

Make a call.
NOTE:
Ensure that the level is good during the test with the uplink/downlink level being
greater than -60 dBm in the measurement report.

4.

Check the result in Single User CS Trace window.


Expected result: The call is established successfully and the voice quality is good.
The TCH occupied by the call is on a non-BCCH TRX, and the Measurement Result
message regarding the call is present before the Channel Activation message is
delivered. In this case, the values of the fields bs powerand ms power in the Channel

Activation message are not the maximum (the maximum power level of the 900M cell
is 5 and that of the 1800M cell is 0).

Deactivation Procedure
1.

Run the BSC6900 MML command SET GCELLPWRBASIC. In this step,


set Power Forecast Allowed to NO(No).

2.

Run the BSC6900 MML command LST GCELLPWRBASIC to query the setting
of Power Forecast Allowed.
Expected result: Power Forecast Allowed is set to NO.

Parent topic: Configuring GBSS Features


Huawei Proprietary and Confidential
Copyright Huawei Technologies Co., Ltd.

You might also like